MV CABLE 3-CORE
630 PURCABLE= (ROHM)(kVABASE)/(1000)(kV2) 0.0002603 -
Length in meters = 50 PUXCABLE= (XOHM)(kVABASE)/(1000)(kV2) - 0.0004339
No.of Runs= 1 PUZ = √(R2+X2) = 0.0005060 ------[6]
ROHM = 0.003150 PUZTOTAL (1+2+3+4+5+6) = 1.2355
XOHM = 0.005250
Fault MVA=Base MVA/PU Impedance 809.41 MVA
INV TRAFO - INV, STATION ISC(Sym RMS)= kVABASE/(1.732xkVPRI.x PUZTOTAL) 14.161 kA
Actual S/C in kA = S/C from Grid + S/C from PV
Actual S/C in kA = 16.926 ( We have consdiered 20kA RMU)
460269166.xls 14
FAULT LEVEL CALCULATION-MV SYSTEM
MV CABLE 3-CORE
630 PURCABLE= (ROHM)(kVABASE)/(1000)(kV2) 0.0002603 -
Length in meters = 50 PUXCABLE= (XOHM)(kVABASE)/(1000)(kV2) - 0.0004339
No.of Runs= 1 PUZ = √(R2+X2) = 0.0005060 ------[6]
ROHM = 0.003150 PUZTOTAL (1+2+3+4+5+6) = 1.3487
XOHM = 0.005250
Fault MVA=Base MVA/PU Impedance 741.45 MVA
INV TRAFO - INV, STATION ISC(Sym RMS)= kVABASE/(1.732xkVPRI.x PUZTOTAL) 12.972 kA
Actual S/C in kA = S/C from Grid + S/C from PV
Actual S/C in kA = 15.772 ( We have consdiered 20kA RMU)
460269166.xls 24
FAULT LEVEL CALCULATION-MV SYSTEM
MV CABLE 3-CORE
630 PURCABLE= (ROHM)(kVABASE)/(1000)(kV2) 0.0002603 -
Length in meters = 50 PUXCABLE= (XOHM)(kVABASE)/(1000)(kV2) - 0.0004339
No.of Runs= 1 PUZ = √(R2+X2) = 0.0005060 ------[6]
ROHM = 0.003150 PUZTOTAL (1+2+3+4+5+6) = 1.2455
XOHM = 0.005250
Fault MVA=Base MVA/PU Impedance 802.90 MVA
INV TRAFO - INV, STATION ISC(Sym RMS)= kVABASE/(1.732xkVPRI.x PUZTOTAL) 14.047 kA
Actual S/C in kA = S/C from Grid + S/C from PV
Actual S/C in kA = 16.847 ( We have consdiered 20kA RMU)
460269166.xls 34
FAULT LEVEL CALCULATION-MV SYSTEM
MV CABLE 3-CORE
630 PURCABLE= (ROHM)(kVABASE)/(1000)(kV2) 0.0001808 -
Length in meters = 50 PUXCABLE= (XOHM)(kVABASE)/(1000)(kV2) - 0.0003013
No.of Runs= 1 PUZ = √(R2+X2) = 0.0003514 ------[6]
ROHM = 0.003150 PUZTOTAL (1+2+3+4+5+6) = 1.3862
XOHM = 0.005250
Fault MVA=Base MVA/PU Impedance 721.39 MVA
INV TRAFO - INV, STATION ISC(Sym RMS)= kVABASE/(1.732xkVPRI.x PUZTOTAL) 12.621 kA
Actual S/C in kA = S/C from Grid + S/C from PV
Actual S/C in kA = 14.459 ( We have consdiered 20kA RMU)