1 17.02.

2020 AK DM DM FOR APPROVAL

Rev Date Prepared Checked Approved Details of Revision


Owner
UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED
(A UP Government Undertaking)

Owner’s Engineer

DEVELOPMENT CONSULTANTS PRIVATE LIMITED, KOLKATA

Contractor

DOOSAN POWER SYSTEMS INDIA PVT. LTD

Supplier
ADVANCE VENTILATION PVT. LTD.

Project

OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT

Date Project Code


Name Title
(DD.MM.YYYY) DP16004
UAS Code
Prepared 17.02.2020 AK
YF00
Unit Code
Checked 17.02.2020 DM
90
KKS Code
Approved 17.02.2020 DM
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF SAR
HVAC SYSTEM FOR ESP BUILDING # 1 & 2 Reg. No
Vetted by AE (DHIC)
115001
Package / Rev.
Equipment HVAC PACKAGE
Name 1
Document No.
DP16004-YF00-90SAR-115001
Page-No.
Supplier Document No.
------ 1 of 32
THIS DOCUMENT IS THE PROPERTY OF DOOSAN POWER SYSTEMS INDIA PVT. LTD. IT IS NOT TO BE COPIED OR USED IN ANY WAY
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

REVISION HISTORY

1 17.02.2020 AK DM DM REVISED AS PER NTPC COMMENTS


0 06.01.2020 AK DM DM FIRST SUBMISSION
Rev Date Prepared By Checked By Approved By Details of Revision

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 02 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LEGENDS AND ABBREVIATIONS

SEL-2/ SEL-3 SELECTION BLOCK FOR WORKING STANDBY ALONG WITH AUTOCHANGEOVER

FG FUNCTION GROUP- TO RELEASE THE COMMON COMMAND FOR MULTIPLE DRIVES

SEQUENCER FOR OPERATING THE SYSTEM IN PRE DEFINED SEQUENCE

PID PROPORTIONAL INTEGRAL DIFFERENTIAL CONTROLLER

PV PROCESS VARIABLE

SP SET POINT

ULP REFERENCE SETPOINT FOR MULTIPLE OPERATIONS

ZT FEEDBACK

DIR PID CONTROLLER DIRECTION

TR TRACK

O/P OUTPUT

I INTERFACE VALUE

M MAIN VALUE

AND AND LOGIC GATE

OR OR LOGIC GATE

NOT NOT LOGIC GATE

AooB A out of B

2oo3 2 out of 3

LVM LEAST VALUE MEASURED

PERM PERMISSIVE

WT WAIT TIME

Delay = XX sec On Delay Timer ( All timer used in this logic are on delay type)

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 03 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LOGIC DIAGRAM FOR ESP BUILDING AC SYSTEM

LIST OF REFERENCE DOCUMENTS


S.NO DOCUMENT TITLE DOCUMENT NO.

P&I DIAGRAM FOR WATER COOLED CONDENSING UNIT FOR ESP CONTROL
1 DP-16004-XG02-90SAR01-111001
BUILDING

DDCMIS DRIVE LIST AND IO LIST FOR ESP


2 DP16004‐YL01‐90SAR‐115001
BUILDING

WRITE UP & CONTROL PHILOSOPHY FOR A/C SYSTEM FOR CCB, ESP control
3 building # 1 & 2 AND DM PLANT BUILDING (INCL. CHEMICAL STORAGE & CPU DP16004‐XS00‐90SAA‐111001
REGEN.)

NOTE: (1) SAME AC LOGIC SHALL BE APPLICABLE FOR PRECISION AC OF ESP CONTROL BUILDING UNIT#2.

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 04 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE


WORKING STANDBY SELECTION
1 1

DDCMIS SOFT SELECTION CT-1,FAN (Main Selected)


2 DDCMIS CT-1,FAN Working Mode Selected 2
SIGNAL 10SAR01AN501

3 3

SEL-2
CT-2,FAN Standby Mode
4 DDCMIS 4
10SAR01AN502
Note:- The Configuration 1 X 100%
5 configuration and Autochangeover to be 5
DDCMIS SOFT SELECTION CT-2,FAN ( Main Selected) CT-2,FAN Working Mode Selected taken care.
6 DDCMIS 6
SIGNAL 10SAR01AN502

7 7

CT-1,FAN Standby Mode


8
10SAR01AN501
8
9 9

DDCMIS SOFT SELECTION CDWP-1(Main Selected) CDWP-1 Working Mode Selected


10 DDCMIS 10
SIGNAL 10SAR01AP001 10SAR01AP001

11 11
SEL-2
CDWP-2 Standby Mode
12 12
10SAR01AP002 DDCMIS
13 Note:- The Configuration 1 X 100% 13
configuration and Autochangeover to be
DDCMIS SOFT SELECTION CDWP-2 ( Main Selected) CDWP-2 Working Mode Selected taken care.
14 DDCMIS 14
SIGNAL 10SAR01AP002 10SAR01AP002

15 15

CDWP-1 Standby Mode


16 16
10SAR01AP001

17 17

DDCMIS SOFT SELECTION PAC-1(Main Selected)


18 DDCMIS PAC-1 Working Mode Selected 18
SIGNAL 10SAR01AN001

19 19
SEL-2
PAC-2 Standby Mode
20 20
10SAR01AN002 DDCMIS
Note:- The Configuration 1 X 100%
21 21
configuration and Autochangeover to be
DDCMIS SOFT SELECTION PAC-2(Main Selected) PAC-2 Working Mode Selected taken care.
22 DDCMIS 22
SIGNAL 10SAR01AN002 10SAR01AN002

23 23

PAC-1 Standby Mode


24 24
10SAR01AN001

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 05 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

FUNCTIONAL GROUP FOR FIRE DAMPER

1 1

FUNCTIONAL GROUP START OPEN FIRE DAMPER OF AC 01 SHEET 09


2 DDCMIS OPEN FIRE DAMPER OF AC SYSTEM 2
(DDCMIS SOFT COMMAND SIGNAL) SYSTEM

START
3 NOT 3

4 4

OR
CLOSE ALL FIRE DAMPER OF AC
5 11 SHEET 06 DDCMIS SOFT SIGNAL FIRE IN ESP BUILDING 08 SHEET 09 5
SYSTEM

STOP
6 6

7 7

8 8

9 9

10 10
05 SHEET 06
05 SHEET 09
FIRE SIGNAL
11 FIELD FEEDBACK FIRE IN ESP BUILDING 11 SHEET 09 11
90AYE19GH001_XG61
05 SHEET 19a
11 SHEET 19a

12 12

FIRE ALARM
13 DDCMIS ANNUNCIATION 13
The same logic shall be applicable for following Fire Dampers. (Fire in ESP Building)
1) FIRE DMPR-1 ------- 10SAR01AA501
2)FIRE DMPR-2 ------ 10SAR01AA502

14 14

15 15

16 16

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 06 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

LOGIC FOR COOLING TOWER INLET VALVES

STEP-1
1 DDCMIS DDCMIS SOFT SIGNAL (AUTO START COMMAND FROM AUTO ON 1
HMI FOR SEQUENCE START)

2 N/A MANUAL ON 2

3 3
OPEN

4 4

PERMISSIVE
OPEN CT-1, I/L VLV
5 FIELD COMMAND 5
10SAR01AA001_YB01

6 6

7 N/A MANUAL OFF 7

CLOSE CT-1, I/L VLV


8 N/A AUTO OFF FIELD COMMAND 8
10SAR01AA001_YB02

9 9
CLOSE

10 10

PROTECTION
OFF
CT-1,FAN RUN FBK
10 FIELD FEEDBACK DELA 10
10SAR01AN501_XB01
Y-5s
OR

CT-1,FAN STOP FBK


11 FIELD FEEDBACK 11
10SAR01AN501_XB02

12
* The same logic shall be applicable for following CT Inlet Valves.
12
S.No DESCRIPTION TAG NO.

CT-2, I/L VLV


13 1 10SAR01AA002 13

14 14

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 07 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE


FIRE DAMPER LOGIC
1 1

2 2

3 3

OPEN FEEDBACK FIRE DMPR1


4 FIELD Feedback All Fire Dampers Opened 05 SHEET 14 4
10SAR01AA501_XB01

5 5

6 6
AND
7 7

8 8

9 9

OPEN FEEDBACK FIRE DMPR2


10 FIELD Feedback 10
10SAR01AA502_XB01

11 11

12 12

13 13

14 14

CLOSE FEEDBACK FIRE DMPR1 Any Fire Damper Closed (All Fire
15 FIELD Feedback 10 SHEET 14 15
10SAR01AA501_XB02 Damper not Opened)

16 16

17 17
OR
18 18

19 19

CLOSE FEEDBACK FIRE DMPR2


20 FIELD Feedback 20
10SAR01AA502_XB02

21 21

22 22

23 23
24 24

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 08 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

FIRE DAMPER OPERATION

02 SHEET 06 DDCMIS SOFT SIGNAL OPEN FIRE DAMPER OF AC SYSTEM AUTO ON


1 1

MANUAL START FROM HMI OF AHU


DDCMIS DDCMIS SOFT COMMAND MANUAL ON
ROOM
2 2

3 OPEN 3

4 4

FIRE IN ESP BUILDING PERMISSIVE OPEN FIRE DMPR-1


11 SHEET 06 DDCMIS SOFT SIGNAL NOT FIELD COMMAND
10SAR01AA501_YB01
5 5

OPEN/CLOSE
6 6

MANUAL STOP FROM HMI OF AHU


DDCMIS DDCMIS SOFT COMMAND MANUAL OFF
ROOM
7 7

05 SHEET 06 DDCMIS SOFT SIGNAL CLOSE ALL FIRE DAMPER OF AC SYSTEM AUTO OFF
8 8

9 CLOSE 9

10 10
PROTECTION
FIRE IN ESP BUILDING
11 SHEET 06 DDCMIS SOFT SIGNAL
11 11

12 12
* The same logic shall be applicable for following Fire Damper.
13 13

1)FIRE DMPR-2 ------ 10SAR01AA502

14 14

21 NOTE: THE OPEN COMMAND FOR DAMPER WILL BE OF CONTINOUS TYPE AND DAMPER WILL CLOSE ON REMOVAL OF OPEN COMMAND. 21

22 22

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 09 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS START SEQUENCE OUTPUTS DEST. LINE

1 1

2 2

STEP-1
(AUTO START COMMAND FROM HMI FOR
3 DDCMIS DDCMIS SOFT SIGNAL 3
SEQUENCE START)

4 4

PREV STEP NO: 01 PERM

5 CT -1, FAN AUTOSTART 01 SHEET 11 5


NEXT MT: 90Sec WT: 10Sec CMD

6 6

CT-1, FAN RUN FBK


7 FIELD FEEDBACK 7
10SAR01AN501_XB01

8 PREV STEP NO: 02 PERM 8

9 NEXT MT: 90Sec WT: 10Sec CMD CDWP-1 AUTO START 01 SHEET 16 9

10 10

CDWP-1 RUN FBK


11 FIELD FEEDBACK 11
10SAR01AP001_XB01

12 PREV STEP NO: 03 PERM 12

13 NEXT MT: 90Sec WT: 10Sec CMD PAC-1 AUTO START 01 SHEET 14 13

14 PAC-1 OUTLET DAMPER OPEN 01 SHEET 20 14

PAC-1 RUN FBK


15 FIELD FEEDBACK 15
10SAR01AN001_XG11

16 PREV STEP NO: 04 PERM 16

17 NEXT MT: 90Sec WT: 10Sec CMD START SEQUENCE END 17

18 18

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 10 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE


LOGIC FOR CT FAN
STEP-1
1 05 SHEET 10 DDCMIS SOFT SIGNAL DELAY-10s SEQUENCE ON 1
(CT-1, FAN AUTO START)
2 DDCMIS DDCMIS SOFT COMMAND MANUAL START FROM HMI OF AHU ROOM MANUAL ON 2

3 3

4 4

CT-1, FAN START CMD


5 4 SHEET 12 5

CT-1, FAN START CMD


6 FIELD COMMAND 6
10SAR01AN501_YB01

OPEN FEEDBACK OF CT-1, I/L VLV


7 FIELD FEEDBACK 7
10SAR01AA001_XB01

8 8
START
PERMISSIVE
AND
CT-1,FAN MCC DIST FBK
9 FIELD FEEDBACK NOT 9
10SAR01AN501_XB48

10 10

11 15 SHEET 12 DDCMIS SOFT SIGNAL CT-1 TANK WATER LEVEL LOW NOT 11

12 12

CT-1,FAN STOP FBK


13 FIELD FEEDBACK 13
10SAR01AN501_XB02

14 14
15 DDCMIS DDCMIS SOFT COMMAND MANUAL STOP FROM HMI OF AHU ROOM MANUAL OFF 15

STEP-3
16 12 SHEET 18 DDCMIS SOFT COMMAND SEQUENCE OFF 16
(CT-1, FAN AUTO STOP)

17 17

CT-1,FAN MCC DIST FBK


18 FIELD FEEDBACK 18
10SAR01AN501_XB48

CLOSE FEEDBACK OF CT-1, I/L VLV


19 FIELD FEEDBACK 19
10SAR01AA001_XB02
STOP
20 20
PROTECTION
21 3 SHEET 12 COMMAND CT-1,FAN FAILED TO START 21
OR
CT-1, FAN STOP CMD
22 10SAR01AN501_YB02 FIELD COMMAND 22

23 23

24 15 SHEET 12 DDCMIS SOFT SIGNAL CT-1 TANK WATER LEVEL LOW 24

25 25

26 26

27 27
* The same logic shall be applicable for following CT.
28 28
1) CT-1,FAN ---- TAG NO (10SAR01AN502).
29 29
30 30

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 11 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

1 1
CT-1, FAN RUN FBK
Delay=
2 FIELD FEEDBACK 10SAR01AN501_XB01 NOT 2
10 sec

3 *CT-1,FAN FAILED TO START 21 SHEET 11 3


AND

CT-1,FAN STOP FBK


DDCMIS SOFT
4 FIELD 10SAR01AN501_XB02 4
SIGNAL

5 *CT-1,FAN FAILED TO START DDCMIS ANNUNCIATION 5

6 6

TT AT HEADER OF CONDENSER WATER


HEADER TEMPERATURE OF CONDENSER
7 FIELD FEEDBACK FROM COOLING TOWER TO PAC Setpoint= 33 DEGREE C DDCMIS ANNUNCIATION 7
WATER FROM COOLING TOWER TO PAC
10SAR01CT001_XQ01

8 8
TT AT HEADER OF CONDENSER WATER
FROM PAC TO COOLING TOWER HEADER TEMPERATURE OF CONDENSER
10SAR01CT002_XQ01 Setpoint= 38 DEGREE C DDCMIS ANNUNCIATION 9
WATER FROM PAC TO COOLING TOWER
9 FIELD FEEDBACK

FS AT CNDSR WTR O/L OF PAC-1


10SAR01CF081_XG01 LOW WATER FLOW AT CNDSR WTR O/L OF
10 FIELD FEEDBACK Setpoint=7CMH DDCMIS ANNUNCIATION 10
PAC-1

11 11
FS AT CNDSR WTR O/L OF PAC-2
10SAR01CF082_XG01
LOW WATER FLOW AT CNDSR WTR O/L OF
12 FIELD FEEDBACK Setpoint=7CMH DDCMIS ANNUNCIATION 12
PAC-2

13 13

CT TANK-1 LT
CT-1 TANK WATER LEVEL LOW
14 FIELD FEEDBACK 10SAR01CL001_XQ01 LVM < 350 mmWC DDCMIS ANNUNCIATION 14

15 CT-1 TANK WATER LEVEL LOW 11 SHEET 11 15

CT TANK-2 LT
16 FIELD FEEDBACK LVM < 350 mmWC CT-2 TANK WATER LEVEL LOW DDCMIS ANNUNCIATION 16
10SAR01CL002_XQ01

17 * The same logic shall be applicable for following CT FAN. 17


1) CT-2,FAN --- TAGNO. ( 10SAR01AN501).
18 18

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 12 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUTS INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

1 1

PS AT PAC-1 INSUFFICIENT PRESSURE AT PAC-1


2 FIELD FEEDBACK Setpoint=70 Pa NOT DDCMIS ANNUNCIATION 2
10SAR01CP081_XG01 OUTLET

3 3

PS AT PAC-2 INSUFFICIENT PRESSURE AT PAC-2


4 FIELD FEEDBACK Setpoint=70 Pa NOT DDCMIS ANNUNCIATION 4
10SAR01CP082_XG01 OUTLET

5 5

RTS FOR ESP BUILDING -


RTS FOR ESP BUILDING - CONTROL
6 FIELD FEEDBACK CONTROL ROOM DDCMIS INDICATION 6
ROOM
10SAR01CU001_XQ01

7 7

RHS FOR ESP BUILDING -


RHS FOR ESP BUILDING - CONTROL
8 FIELD FEEDBACK CONTROL ROOM DDCMIS INDICATION 8
ROOM
10SAR01CU001_XQ02

9 9

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 13 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

LOGIC FOR PAC

STEP-3
1 13 SHEET 10 DDCMIS SOFT SIGNAL DELAY-10s SEQUENCE ON 1
(PAC-1 AUTO START)

2 DDCMIS DDCMIS SOFT COMMAND MANUAL START FROM HMI OF AHU ROOM MANUAL ON 2

CDWP-1 RUN FBK


3 FIELD FEEDBACK 3
10SAR01AP001_XB01

OR

CDWP-2 RUN FBK


4 FIELD FEEDBACK 4
10SAR01AP002_XB01

AND

5 04 SHEET 08 DDCMIS SOFT SIGNAL ALL FIRE DAMPERS OPENED 5


START

PERMISSIVE

CT-1,FAN RUN FBK PAC-1 START CMD


5a FIELD FEEDBACK FIELD COMMAND 5a
10SAR01AN501_XB01 10SAR01AN001_YG11

OR

CT-2,FAN RUN FBK


6 FIELD FEEDBACK 6
10SAR01AN502_XB01

7 7

PAC-1 START CMD


8 DDCMIS DDCMIS SOFT COMMAND MANUAL STOP FROM HMI OF AHU ROOM MANUAL OFF 4 SHEET 15 8

STEP-1
9 5 SHEET 18 DDCMIS SOFT COMMAND SEQUENCE OFF 9
(PAC-1 AUTO STOP)

Any Fire Damper Closed (All Fire Damper


10 15 SHEET 08 FEEDBACK 10
not Opened)

STOP

11 11

PROTECTION

CT-1,FAN STOP FBK PAC-1 STOP CMD


11a FIELD FEEDBACK AND FIELD COMMAND 11a
10SAR01AN501_XB02 10SAR01AN001_YG12

12 03 SHEET 15 DDCMIS SOFT SIGNAL PAC-1 FAILED TO START OR 12

CDWP-1 STOP FBK


13 FIELD FEEDBACK 13
10SAR01AP001_XB02

14 14
The same logic shall be applicable for following PAC.
15 1) PAC-2 ----- TAG NO. (10SAR01AN002). 15

16 16
17 17

18 18

19 THE ACCU WILL BE RUNNING IF ITS CORRESPONDING AHU IS RUNNING 19

20 20

Rev. 00
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 14 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUTS INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

1 1

PAC-1 START FBK


2 FIELD FEEDBACK Delay=10 sec 2
10SAR01AN001_XB01

3 PAC-1 FAILED TO START 12 SHEET 14 3


AND

PAC-1 STOP FBK


4 05 SHEET 14 DDCMIS SOFT SIGNAL 4
10SAR01AN001_XB02

5 PAC-1 FAILED TO START DDCMIS ANNUNCIATION 5

6 6

7 7

The same logic shall be applicable for following PAC.


8 8
1) PAC-2 ----- TAG NO. (10SAR01AN002).

9 9

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 15 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE


DDCMIS LOGIC FOR CONDENSER WATER PUMP

STEP-2
1 09 SHEET 10 DDCMIS SOFT SIGNAL DELAY-10s SEQUENCE ON 1
(CDWP-1 AUTO START)

2 DDCMIS DDCMIS SOFT COMMAND MANUAL START FROM HMI OF AHU ROOM MANUAL ON 2

3 3

4 4

CT-1,FAN RUN FBK CDWP-1 START CMD


5 FIELD FEEDBACK 04 SHEET 17 5
10SAR01AN501_XB01

OR

CDWP-1 START CMD


CT-2,FAN RUN FBK
6 FIELD FEEDBACK 10SAR01AP001_YB01 FIELD COMMAND 6
10SAR01AN502_XB01

START
7 7
PERMISSIVE
CDWP-1 MCC DIST FBK AND
8 FIELD FEEDBACK NOT 8
10SAR01AP001_XB48

9 9

FIRE SIGNAL
10 FIELD FEEDBACK NOT 10
90AYE19GH001_XG61

11 11

CDWP-1 STOP FBK


12 FIELD FEEDBACK 12
10SAR01AP001__XB02

13 13

14 DDCMIS DDCMIS SOFT COMMAND MANUAL STOP FROM HMI OF AHU ROOM MANUAL OFF 14

STEP-2
15 09 SHEET 18 DDCMIS SOFT COMMAND SEQUENCE OFF 15
(CDWP-1 AUTO STOP)

CT-1,FAN STOP FBK


16 FIELD FEEDBACK 16
10SAR01AN501_XB02
AND
CT-2,FAN STOP FBK
17 FIELD FEEDBACK 17
10SAR01AN502_XB02
STOP
18 18

PROTECTION
19 19

OR
03 SHEET 17 CDWP-1 STOP CMD
20 COMMAND CDWP-1 FAILED TO START FIELD COMMAND 20
10SAR01AP001_YB02

21 21

FIRE SIGNAL
22 FIELD FEEDBACK 22
90AYE19GH001_XG61

23 08 SHEET 17 DDCMIS SOFT SIGNAL INSUFFICIENT PRESSURE AT OUTLET OF CDWP-1 23

24 24

25 25
* The same logic shall be applicable for following CDWP.
26 26
1) CDWP-2 ---- TAG NO (10SAR01AP002).
27 27
28 28

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 16 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS DDCMIS LOGIC FOR CONDENSER WATER PUMP OUTPUTS DEST. LINE

1 1

CDWP-1 RUN FBK


Delay=
2 FIELD FEEDBACK 10SAR01AP001_XB01 NOT 2
10 sec

3 CDWP-1 FAILED TO START 20 SHEET 16 3


AND

CDWP-1 STOP FBK


4 FIELD DDCMIS SOFT SIGNAL 10SAR01AP001_XB02 4

CDWP-1 RUN FBK


DELAY-
5 FIELD DDCMIS SOFT SIGNAL 10SAR01AP001_XB01 CDWP-1 FAILED TO START DDCMIS ANNUNCIATION 5
30s

6 6

CDWP-1 OUTLET PRESSURE AND


LVM< 1.5 INSUFFICIENT PRESSURE AT OUTLET DDCMIS ANNUNCIATION
7 FIELD FEEDBACK TRANSMITTER 7
Kg/Cm2 OF CDWP-1
10SAR01CP001_XQ01

INSUFFICIENT PRESSURE AT OUTLET


8 23 SHEET 16 8
OF CDWP-1

CDWP-2 OUTLET PRESSURE


LVM< 1.5 INSUFFICIENT PRESSURE AT OUTLET
9 FIELD FEEDBACK TRANSMITTER DDCMIS ANNUNCIATION 9
Kg/Cm2 OF CDWP-2
10SAR01CP002_XQ01

10 10

11 11

* The same logic shall be applicable for following CDWP.


12 12
1) CDWP-2 ---- TAG NO (10SAR01AP002).

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 17 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS STOP SEQUENCE OUTPUTS DEST. LINE

1 1

2 2

STEP-1
(AUTO STOP COMMAND FROM HMI FOR
3 DDCMIS DDCMIS SOFT SIGNAL 3
STOP SEQUENCE)

4 4

PREV STEP NO: 01 PERM


5
PAC-1 AUTO STOP 09 SHEET 14 5
NEXT MT: 90Sec WT: 10Sec CMD

6 6

PAC-1 STOP FBK


7 FIELD FEEDBACK 7
20SAR01AN001_XG12

8 PREV STEP NO: 02 PERM 8

9 NEXT MT: 90Sec WT: 10Sec CMD CDWP-1 AUTO STOP 15 SHEET 16 9

10 10

CDWP-1 STOP FBK


11 FIELD FEEDBACK 11
20SAR01AP001_XB02

PREV STEP NO: 03 PERM

12 CT-1, FAN AUTO STOP 16 SHEET 11 12


NEXT MT: 90Sec WT: 10Sec CMD

13 13

CT-1, FAN STOP FBK


14 FIELD FEEDBACK 20SAR01AN501_XB02 14

PREV STEP NO: 04 PERM

15 STOP SEQUENCE END 15


NEXT MT: 90Sec WT: 10Sec CMD

16 16

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 18 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

LOGIC FOR CONDENSER WATER PUMP OUTLET VALVE

STEP-2
1 09 SHEET 10 DDCMIS SOFT SIGNAL AUTO ON 1
(Working CDWP Valve to be opened)

2 N/A MANUAL ON 2

3 3
OPEN

4 4

PERMISSIVE
OPEN CDWP-1, O/L VLV
5 FIELD COMMAND 5
10SAR01AA003_YB01

6 6

7 N/A MANUAL OFF 7

CLOSE CDWP-1, O/L VLV


8 AUTO OFF FIELD COMMAND 8
10SAR01AA003_YB02

9 9
CLOSE

10 10

PROTECTION

CDWP-1 RUN FBK OFF


10 FIELD FEEDBACK 10
10SAR01AP001_XB01 DELAY-5s

AND

CDWP-1 STOP FBK


11 FIELD FEEDBACK 11
10SAR01AP001_XB02

12
* The same logic shall be applicable for following Condenser Water Pump O/L Valves.
12
S.No DESCRIPTION TAG NO.

CDWP-1, O/L VLV


13 1 10SAR01AA004 13

14 14

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 19 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

LOGIC FOR FIRE DAMPER( DISCH. OF PAC)

1 14 SHEET 10 DDCMIS SOFT SIGNAL STEP-3 AUTO ON 1

2 N/A MANUAL ON 2

3 3

4 OPEN 4

OPEN/ CLOSE FIRE DMPR-3


PERMISSIVE
5 ( DISCH. OF PAC-1) FIELD COMMAND 5
10SAR01AA401_YB01
OPEN/CLOSE
6 6

7 N/A MANUAL OFF 7

8 N/A AUTO OFF 8

9 9
OFF CLOSE
PAC-1 RUN FBK
10 FIELD FEEDBACK DELAY- 10
10SAR01AN001_XB01
5s PROTECTION
11 11
AND
PAC-1 STOP FBK
12 FIELD FEEDBACK 12
10SAR01AN001_XB02

The same logic shall be applicable for following FIRE DAMPER( DISCH. OF PAC).

13 13
1)FIRE DMPR-4 ( DISCH. OF PAC-2) ------ 10SAR01AA402

14 14

NOTE: THE OPEN COMMAND FOR DAMPER WILL BE OF CONTINOUS TYPE AND DAMPER WILL CLOSE ON REMOVAL OF OPEN COMMAND.
21 21

22 22

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 20 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LOGIC DIAGRAM FOR ESP BUILDING VENTILATION SYSTEM

LIST OF REFERENCE DOCUMENTS


S.NO DOCUMENT TITLE DOCUMENT NO.

SINGLE LINE FLOW DIAGRAM FOR UAF UNIT FOR ESP CONTROL BUILDING FOR
1 DP-16004-XG08-90SAR-111001
UNIT-1 & 2.

DDCMIS DRIVE LIST AND IO LIST FOR ESP


2 DP16004‐YL01‐90SAR‐115001
BUILDING

WRITE UP & CONTROL PHILOSOPHY FOR A/C SYSTEM FOR CCB, ESP control
3 building # 1 & 2 AND DM PLANT BUILDING (INCL. CHEMICAL STORAGE & CPU DP16004‐XS00‐90SAA‐111001
REGEN.)

NOTE: (1) SAME VENTILATION LOGIC SHALL BE APPLICABLE FOR UAF OF ESP CONTROL BUILDING UNIT#2.

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 21 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE


WORKING STANDBY SELECTION
1 1

UAF-1, PUMP-1 (Main


DDCMIS SOFT SELECTION
2 DDCMIS Selected) UAF-1, PUMP-1 Working Mode Selected 2
SIGNAL
10SAR01AP101

3 3

SEL-2
UAF-1, PUMP-2 Standby Mode
4 4
10SAR01AP101

DDCMIS
5 Note:- The Configuration 1 X 100% configuration and 5
Autochangeover to be taken care.

UAF-1, PUMP-2 ( Main


DDCMIS SOFT SELECTION UAF-1, PUMP-2 Working Mode Selected
6 DDCMIS Selected) 6
SIGNAL
10SAR01AP102

7 7

UAF-1, PUMP-1 Standby Mode


8 10SAR01AP102

8
9 9

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 22 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

FUNCTIONAL GROUP FOR FIRE DAMPER

1 1

FUNCTIONAL GROUP START OPEN FIRE DAMPERS OF VENTILATION 01 SHEET 24


2 DDCMIS OPEN ALL FIRE DAMPERS 2
(DDCMIS SOFT COMMAND SIGNAL) SYSTEM

START
3 NOT 3

4 4

OR
5 11 SHEET 22 DDCMIS SOFT SIGNAL FIRE IN ESP BUILDING CLOSE ALL FIRE DAMPERS 08 SHEET 24 5

STOP
6 6

7 7

8 8

9 9

10 10

05 SHEET 22
FIRE SIGNAL
11 FIELD FEEDBACK FIRE IN ESP BUILDING 05 SHEET 24 11
90AYE19GH001_XG61
11 SHEET 24

12 12

FIRE ALARM
13 DDCMIS ANNUNCIATION 13
(Fire in ESP Building)

14 14

15 15

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 23 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE


FIRE DAMPER LOGIC
1 1

2 2

OPEN FEEDBACK FIRE DMPR5


3 FIELD Feedback 3
10SAR01AA505_XB01

OPEN FEEDBACK FIRE DMPR6


4 FIELD Feedback All Fire Dampers Opened 06 SHEET 26 4
10SAR01AA506_XB01

OPEN FEEDBACK FIRE DMPR7 AND


5 FIELD Feedback 5
10SAR01AA507_XB01

OPEN FEEDBACK FIRE DMPR8


FIELD Feedback
10SAR01AA508_XB01
6 6

7 7

8 8

9 9

10 10

11 11

CLOSE FEEDBACK FIRE DMPR5


12 FIELD Feedback 12
10SAR01AA505_XB02

CLOSE FEEDBACK FIRE DMPR6 Any Fire Damper Closed (All Fire
FIELD Feedback 18 SHEET 26
10SAR01AA506_XB02 Damper not Opened)
13 13

CLOSE FEEDBACK FIRE DMPR7


FIELD Feedback OR
10SAR01AA507_XB02
14 14

CLOSE FEEDBACK FIRE DMPR8


FIELD Feedback
10SAR01AA508_XB02
15 15

16 16
17 17
18 18
19 19

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 24 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

FIRE DAMPER OPERATION

OPEN FIRE DAMPERS OF VENTILATION


02 SHEET 22 DDCMIS SOFT SIGNAL AUTO ON
SYSTEM
1 1

MANUAL START FROM HMI OF AHU


DDCMIS DDCMIS SOFT COMMAND MANUAL ON
ROOM
2 2

3 OPEN 3

4 4

FIRE IN ESP BUILDING PERMISSIVE OPEN FIRE DMPR-5


11 SHEET 22 DDCMIS SOFT SIGNAL NOT
10SAR01AA505_YB01
5 FIELD COMMAND 5

OPEN/CLOSE
6 6

MANUAL STOP FROM HMI OF AHU


DDCMIS DDCMIS SOFT COMMAND MANUAL OFF
ROOM
7 7

CLOSE FIRE DAMPERS OF VENTILATION


05 SHEET 22 DDCMIS SOFT SIGNAL AUTO OFF
SYSTEM
8 8

9 CLOSE 9

10 10
PROTECTION
FIRE IN ESP BUILDING
11 SHEET 22 DDCMIS SOFT SIGNAL
11 11

12 12
* The same logic shall be applicable for following Fire Dampers.
13 S.No DESCRIPTION TAG NO. 13

1 FIRE DMPR-6 10SAR01AA506


2 FIRE DMPR-7 10SAR01AA507
3 FIRE DMPR-8 10SAR01AA508
14 14

21 NOTE: THE OPEN COMMAND FOR DAMPER WILL BE OF CONTINOUS TYPE AND DAMPER WILL CLOSE ON REMOVAL OF OPEN COMMAND. 21

22 22

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 25 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS START SEQUENCE OUTPUTS DEST. LINE

1 1

2 2

STEP-1
(AUTO START COMMAND FROM HMI FOR
3 DDCMIS DDCMIS SOFT SIGNAL 3
SEQUENCE START)

4 4

PREV STEP NO: 01 PERM

5 UAF-1, FAN AUTO START 01 SHEET 26 5


NEXT MT: 90Sec WT: 10Sec CMD

6 6

UAF FAN-1 RUN FBK


7 FIELD FEEDBACK 7
10SAR01AN003_XB01

8 PREV STEP NO: 02 PERM 8

9 NEXT MT: 90Sec WT: 10Sec CMD UAF-1, PUMP-1 AUTO START 01 SHEET 29 9

10 10

14 14

UAF-1, PUMP-1 RUN FBK


15 FIELD FEEDBACK 15
10SAR01AP101_XB01

16 PREV STEP NO: 03 PERM 16

17 NEXT MT: 90Sec WT: 10Sec CMD START SEQUENCE END 17

18 18

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 26 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE


LOGIC FOR UAF FAN
STEP-1
1 05 SHEET 25 DDCMIS SOFT SIGNAL SEQUENCE ON 1
(UAF-1,FAN AUTO START)
2 DDCMIS DDCMIS SOFT COMMAND MANUAL START FROM HMI OF AHU ROOM MANUAL ON 2

3 3

4 4

5 UAF-1,FAN START CMD 4 SHEET 27 5

UAF-1,FAN START CMD


6 04 SHEET 23 DDCMIS SOFT SIGNAL OPEN FIRE DAMPERS OF VENTILATION SYSTEM FIELD COMMAND 6
10SAR01AN003__YB01

7 7

8 8
START
PERMISSIVE
AND
UAF-1,FAN MCC DIST FBK
9 FIELD FEEDBACK NOT 9
10SAR01AN003_XB48

10 10

11 09 SHEET 27 DDCMIS SOFT SIGNAL UAF-1, TANK WATER LEVEL LOW NOT 11

12 12

UAF-1,FAN STOP FBK


13 FIELD FEEDBACK 13
10SAR01AN003_XB02

14 14
15 DDCMIS DDCMIS SOFT COMMAND MANUAL STOP FROM HMI OF AHU ROOM MANUAL OFF 15

STEP-2
16 09 SHEET 31 DDCMIS SOFT COMMAND SEQUENCE OFF 16
(UAF-1,FAN AUTO STOP)

17 17

18 13 SHEET 23 DDCMIS SOFT SIGNAL Any Fire Damper Closed (All Fire Damper not Opened) 18

UAF-1,FAN MCC DIST FBK


19 FIELD FEEDBACK 19
10SAR01AN003_XB48
STOP
20 20
PROTECTION
21 3 SHEET 27 COMMAND UAF-1,FAN FAILED TO START 21
OR
UAF-1,FAN STOP CMD
22 10SAR01AN003_YB02 FIELD COMMAND 22

23 23

24 09 SHEET 27 DDCMIS SOFT SIGNAL UAF-1, TANK WATER LEVEL LOW 24

25 25

26 26

27 27
* The same logic shall be applicable for following UAF,FAN.
28 28
1) UAF-2,FAN ---- TAG NO (10SAR01AN004).
29 29
30 30

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 27 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

1 1

UAF-1,FAN RUN FBK


Delay=
2 FIELD FEEDBACK 10SAR01AN003_XB01 NOT 2
10 sec

3 *UAF-1,FAN FAILED TO START 21 SHEET 26 3


AND

UAF-1,FAN STOP FBK


DDCMIS SOFT
4 FIELD 10SAR01AN003_XB02 4
SIGNAL

5 *UAF-1,FAN FAILED TO START DDCMIS ANNUNCIATION 5

6 6

LO LVL OF TANK OF UAF-1 LVM < 350 UAF-1, TANK WATER LEVEL LOW
7 FIELD FEEDBACK DDCMIS ANNUNCIATION 7
10SAR01CL080_XG52 mmWC

8 8

UAF-1, TANK WATER LEVEL LOW


9 11 SHEET 26 9

LO LVL OF TANK OF UAF-2 LVM < 350 UAF-2, TANK WATER LEVEL LOW
10 FIELD FEEDBACK DDCMIS ANNUNCIATION 10
10SAR01CL081_XG52 mmWC

11 * The same logic shall be applicable for following UAF FAN. 11


1) UAF-2,FAN ---TAG NO (10SAR01AN004).
12 12

13 13

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 28 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUTS INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE

1 1

PS AT PUMP-1 OF UAF-1 INSUFFICIENT PRESSURE AT O/L OF UAF-


2 FIELD FEEDBACK Setpoint=2.5Kg/cm2 NOT DDCMIS ANNUNCIATION 2
10SAR01CP083_XG52 1,PUMP-1

3 3

UAF-1,FAN RUN FBK


INSUFFICIENT PRESSURE AT OUTLET OF UAF-
4 FIELD DDCMIS SOFT SIGNAL 10SAR01AN003_XB01 DELAY-30s AND 23 SHEET 29 4
1, PUMP-1

5 5

6 6

7 7

PS AT PUMP-1 OF UAF-2 INSUFFICIENT PRESSURE AT O/L OF UAF-


8 FIELD FEEDBACK Setpoint=2.5Kg/cm2 NOT DDCMIS ANNUNCIATION 8
10SAR01CP084_XG52 1,PUMP-2

9 9

10 10

11 11

12 12

13 13

14 14

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 29 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS LOGIC-DDCMIS OUTPUTS DEST. LINE


DDCMIS LOGIC FOR UAF PUMP

STEP-2
1 09 SHEET 25 DDCMIS SOFT SIGNAL SEQUENCE ON 1
(UAF-1,PUMP-1 AUTO START)

2 DDCMIS DDCMIS SOFT COMMAND MANUAL START FROM HMI OF AHU ROOM MANUAL ON 2

3 3

4 4

UAF-1,PUMP-1 START CMD


UAF-1,FAN RUN FBK
5 FIELD FEEDBACK 04 SHEET 30 5
10SAR01AN003_XB01

UAF-1,PUMP-1 START CMD


6 10SAR01AP101_YB01 FIELD COMMAND 6

START
7 7
PERMISSIVE
UAF-1,PUMP-1 MCC DIST FBK AND
8 FIELD FEEDBACK NOT 8
10SAR01AP101_XB48

9 9

FIRE SIGNAL
10 FIELD FEEDBACK NOT 10
90AYE19GH001_XG61

11 11

UAF-1,PUMP-1 STOP FBK


12 FIELD FEEDBACK 12
10SAR01AP101__XB02

13 13

14 DDCMIS DDCMIS SOFT COMMAND MANUAL STOP FROM HMI OF AHU ROOM MANUAL OFF 14

STEP-2
15 05 SHEET 31 DDCMIS SOFT COMMAND SEQUENCE OFF 15
(UAF-1,PUMP-1 AUTO STOP)

UAF-1,FAN STOP FBK


16 FIELD FEEDBACK 16
10SAR01AN003_XB02

17 17

STOP
18 18

PROTECTION
19 19

OR
03 SHEET 30 UAF-1,PUMP-1 STOP CMD
20 COMMAND UAF-1,PUMP-1 FAILED TO START FIELD COMMAND 20
10SAR01AP101_YB02

21 21

FIRE SIGNAL
22 FIELD FEEDBACK 22
90AYE19GH001_XG61

INSUFFICIENT PRESSURE AT OUTLET OF UAF-1,


23 04 SHEET 28 DDCMIS SOFT SIGNAL 23
PUMP-1

24 24

25 25
* The same logic shall be applicable for following UAF, PUMP.
26 26
1) UAF-1,PUMP-2 ---- TAG NO (10SAR01AP102).
27 27
28 28

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 30 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS DDCMIS LOGIC FOR UAF PUMP OUTPUTS DEST. LINE

1 1

UAF-1,PUMP-1 RUN FBK


Delay=
2 FIELD FEEDBACK 10SAR01AP101_XB01 NOT 2
10 sec

3 UAF-1,PUMP-1 FAILED TO START 20 SHEET 30 3


AND

UAF-1,PUMP-1 STOP FBK


4 FIELD DDCMIS SOFT SIGNAL 10SAR01AP101_XB02 4

5 UAF-1,PUMP-1 FAILED TO START DDCMIS ANNUNCIATION 5

6 6

7 7

8 8

* The same logic shall be applicable for following UAF PUMP


9 9
1) UAF-1, PUMP-2 ---- TAG NO (10SAR01AP102).

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 31 of 32
CONTROL LOOP LOGIC DIAGRAM FOR DDCMIS OF HVAC SYSTEM FOR ESP BUILDING # 1 2
DP16004-YF00-90SAR-115001

LINE SOURCE TYPE OF INPUT INPUTS STOP SEQUENCE OUTPUTS DEST. LINE

1 1

2 2

STEP-1
(AUTO STOP COMMAND FROM HMI FOR
3 DDCMIS DDCMIS SOFT SIGNAL 3
STOP SEQUENCE)

4 4

PREV STEP NO: 01 PERM


5
UAF-1,PUMP-1 AUTO STOP 15 SHEET 29 5
NEXT MT: 90Sec WT: 2Sec CMD

6 6

UAF-1,PUMP-1 STOP FBK


7 FIELD FEEDBACK 7
10SAR01AN101_XB02

8 PREV STEP NO: 02 PERM 8

9 NEXT MT: 90Sec WT: 2Sec CMD UAF-1,FAN AUTO STOP 16 SHEET 26 9

10 10

11 11

UAF-1,FAN STOP FBK


12 FIELD FEEDBACK 10SAR01AN003_XB02 12

PREV STEP NO: 03 PERM

STOP SEQUENCE END


13 13
NEXT MT: 90Sec WT: 2Sec CMD

14 14

Rev. 01
OBRA “C” 2x660 MW THERMAL POWER EXTENSION PROJECT Page 32 of 32