You are on page 1of 2

CALC0003

Revision: 5
Revised: 12/16/2014
Effective: 1/1/2015
Page 1 of 2
Purge Volume Calculation Worksheet
H&P Project:

Probe ID:

Soil Vapor Probe Construction Specifications


Sand Pack Height 0.00 inches *Tubing Chart (Nylaflow)
Sand Pack Diameter 0.000 inches Outer Diameter Inner Diameter
Dry Bentonite Zone Height 0.00 inches 1/4" 0.177"
Dry Bentonite Zone Diameter 0.000 inches 1/8" 0.078"
Tubing Length 0.00 feet
Tubing Inner Diameter* 0.000 inches

1PV 3PV 10PV


Volume of Tubing: 0 0 0
Volume of Sand Pack (40% porosity): 0 0 0
Volume of assumed Dry Bentonite Zone (50% porosity): 0 0 0
Total System Volume (tubing + sand + bentonite): 0 0 0

Purge Time Calculations (for using a pump)

Collection Volume 0 cc
Pump Flow Rate 0 mL/min

Pump Time Calculations Pump Time For Difference of Volumes


Min Sec Volume Diff. Min Sec
1PV #DIV/0! #DIV/0! 1PV N/A #DIV/0! #DIV/0!
3PV #DIV/0! #DIV/0! 3PV-1PV Collection Vol. 0 #DIV/0! #DIV/0!
CALC0003
Revision: 5
10PV #DIV/0! #DIV/0! 10PV-3PV Collection Vol. 0 #DIV/0! #DIV/0!
Revised: 12/16/2014
Effective: 1/1/2015
Page 2 of 2

You might also like