METHOD STATEMENT OF WATERPROOFING Revision : 0
METHOD STATEMENT OF WATERPROOFING
WORKS Prepared : 1.9.18
3.9.18
PEMBINAAN INFRA E&J WORKS
SDN BHD.
MS/ANNEX/ZDR/008

CADANGAN PEMBANGUNAN PERDANGANGAN YANG MENGANDUNGI 1


BLOK 30 TINGKAT BANGUNAN YANG MENGADUNGI 3 TINGKAT RUANG
PERDANGANGAN DAN 27 TINGKAT 258 UNIT PANGSAPURI SERVIS

METHOD STATEMENT OF WATERPROOFING WORKS

Prepared by: Reviewed by: Accepted by:


Date:

HASREN HASHIM Jason Pang


Project Engineer General Manager Accepted
Accepted with Condition
Date: Date: Reject

CONTENT

1.0 METHOD STATEMENT AT VARIOUS LOCATION

1
E&J
.0
Page No. : 3 of 5
METHOD STATEMENT OF WATERPROOFING Revision : 0
Prepared : 3.9.18
PEMBINAAN INFRA E&J WORKS
SDN BHD.

2.0 MATERIAL DESCRIPTION & TECHNICAL DATA

3.0 SHOP DRAWING

1.0 METHOD STATEMENT AT VARIOUS


LOCATION BY REFER TO CONSTRUCTION
DRAWING.

2
E&J
.0
Page No. : 4 of 5
METHOD STATEMENT OF WATERPROOFING Revision : 0
Prepared : 20.8.18
PEMBINAAN INFRA E&J WORKS
SDN BHD.

2.0 MATERIAL DESCRIPTION AND TECHNICAL


DATA

3
E&J
.0
Page No. : 5 of 5
METHOD STATEMENT OF WATERPROOFING Revision : 0
Prepared : 1.9.18
PEMBINAAN INFRA E&J WORKS
SDN BHD.

3.0 SHOP DRAWING