FOUNDATION BEAM DESIGN : C16 & C17 checked

Grade of Concrete, Fck = 20 Mpa


Grade of Steel, Fy = 415 Mpa
Width of the Beam, b = 700 mm
Overall depth of the Beam, D = 1300 mm
Clear Cover to reinforcement = 50 mm
Diameter of Bar used (in other direction) = 20 mm 314
Diameter of Bar used (Main reinforcement) = 20 mm 314
Diameter of Stirr up used = 10 mm 79

Bottom Ast Required = 5886 mm²


Top Ast Required = 4200 mm²

Provide Bottom Reinforcement : 7-25T (ALTH.) + 5-25T (EXT.) 5892 mm²


Provide Top Reinforcement : 7-25T + 2-25T (ALTH.) 2729 mm²
Provide Shear Reinforcement : 4L-12T @ 150mm C/C.
FOUNDATION BEAM DESIGN : C35 & C36 checked

Grade of Concrete, Fck = 20 Mpa


Grade of Steel, Fy = 415 Mpa
Width of the Beam, b = 600 mm
Overall depth of the Beam, D = 1300 mm
Clear Cover to reinforcement = 50 mm
Diameter of Bar used (in other direction) = 20 mm 314
Diameter of Bar used (Main reinforcement) = 20 mm 314
Diameter of Stirr up used = 10 mm 79

Bottom Ast Required = 5467 mm²


Top Ast Required = 3913 mm²

Provide Bottom Reinforcement : 6-25T (ALTH.) + 6-25T (EXT.) 5892 mm²


Provide Top Reinforcement : 6-25T + 2-25T (ALTH.) 3928 mm²
Provide Shear Reinforcement : 4L-12T @ 150mm C/C.
FOUNDATION BEAM DESIGN : C57 & C60 checked

Grade of Concrete, Fck = 20 Mpa


Grade of Steel, Fy = 415 Mpa
Width of the Beam, b = 900 mm
Overall depth of the Beam, D = 1300 mm
Clear Cover to reinforcement = 50 mm
Diameter of Bar used (in other direction) = 20 mm 314
Diameter of Bar used (Main reinforcement) = 20 mm 314
Diameter of Stirr up used = 10 mm 79

Bottom Ast Required = 4354 mm²


Top Ast Required = 2313 mm²

Provide Bottom Reinforcement : 9-20T (ALTH.) + 8-16T (EXT.) 4434 mm²


Provide Top Reinforcement : 5-20T + 4-16T (ALTH.) 2374 mm²
Provide Shear Reinforcement : 7L-12T @ 150mm C/C.
FOUNDATION BEAM DESIGN : C57 & C60 checked

Grade of Concrete, Fck = 20 Mpa


Grade of Steel, Fy = 415 Mpa
Width of the Beam, b = 950 mm
Overall depth of the Beam, D = 1350 mm
Clear Cover to reinforcement = 50 mm
Diameter of Bar used (in other direction) = 20 mm 314
Diameter of Bar used (Main reinforcement) = 20 mm 314
Diameter of Stirr up used = 10 mm 79

Bottom Ast Required = 3274 mm²


Top Ast Required = 2382 mm²

Provide Bottom Reinforcement : 10-20T (ALTH.) + 2-16T (EXT.) 3542 mm²


Provide Top Reinforcement : 10-16T + 2-16T (ALTH.) 2412 mm²
Provide Shear Reinforcement : 7L-12T @ 150mm C/C.