A lot of people were asking how much is the average construction cost of a house and we see
that the internet does not give exact answer to this concern. If you are one of the non-
technical person who wants bulls eye answer, then you are reading the right article.

The sample floor plan below comes with its own simplified Bill of Quantity. Check this
average construction cost of 2-story house too!

Get the updated complete list in excel file for a reasonable price HERE!

https://philconprices.com/category/cost-of-house-construction/ 1/6
2/3/2020 cost of house construction | PHILCON PRICES

Sample Floor Plan

Description % Total Total Cost

Earthworks

Excavation & Embankment including Gravel Fill 6.93%


86,978.28

Structural Works

Structural Concrete (class A, 28 days) 19.93%


250,203.44

Reinforcing Bars 14.15%


177,668.24

Formworks and Falseworks 6.49%


81,450.71

Architectural Works

Cost of Ceiling – Fiber Cement Board 4.02%


50,506.60

Wooden Door (Flush and Solid Panel) 2.66%

https://philconprices.com/category/cost-of-house-construction/ 2/6
2/3/2020 cost of house construction | PHILCON PRICES

33,436.31

Aluminum Glass Window (Awning and Fixed) 4.12%


51,751.60

Water Proofing, Cement Base 0.09%


1,138.37

Glazed Tiles and Trim 3.36%


42,187.80

Unglazed Tiles 0.66%


8,264.51

Cement Plaster Finish 2.64%


33,189.70

Masonry Works (including reinforcing steel) 6.58%


82,577.76

Interior and Exterior Painting Works 5.75%


72,145.15

Structural Steel (for Truss Works) 5.79%


72,631.78

Roofing Works (Around 124 sq.m.) 7.25%


91,046.59

Sanitary and Plumbing Works

Sewer Line Works 1.09%


13,733.08

Plumbing Fixtures 2.24%


28,068.08

Cold Water Lines 0.66%


8,239.08

Storm Drainage and downspout 0.67%


8,451.14

Electrical Works

Conduits,Boxes & Fittings 0.87%


10,868.08

Wires and Wiring Devices 1.85%


23,196.84

Panel Board with Main & Branch Breakers 0.50%


6,310.80

Lighting Fixtures and Lamps 1.70%


21,289.04

>>> Grand Total 100.00%


1,255,332.98

The prices comes with its corresponding labor and equipment costs. The materials used are
for medium-cost house construction. The average timeline for this type of house is around

https://philconprices.com/category/cost-of-house-construction/ 3/6

You might also like