Bed width = 3m Discharge per unit width 'q' = 0.664 / 3 = 0.221 Cumecs/met As per Clause 8.5.2 of I.S. 7784 (Part-I) 1993 Assuming silt factor 'f' = 1 Normal scour depth = R = 1.35 x (q2 / f)1/3 = 1.35 x (0.221² / 1)^(1/3) R = 0.493 m
Maximum scour depth on U / S side = 1.5 x R
= 1.5 x 0.493 = 0.74 m
F S L on U/S side = 89.934
Up stream cut off level = 89.934 - 0.74
= 89.194 There fore provide U / S cut off level = 84.460
Down stream side:
Canal Discharge = 0.664 Cumecs
Bed width = 3m Discharge per unit width 'q' = 0.664 / 3 = 0.221 Cumecs/met As per Clause 8.5.2 of I.S. 7784 (Part-I) 1993 Assuming silt factor 'f' = 1 Normal scour depth = R = 1.35 x (q2 / f)1/3 = 1.35 x (0.221² / 1)^(1/3) R = 0.493 m
Maximum scour depth on D / S = 2.0 x R
= 2 x 0.493 = 0.986 m
F S L on D/S of canal = 89.934
Down stream cut off level = 89.934 - 0.986
= 88.948 There fore provide D / S cut off level = 84.214