Zubair Rental Compressor

FLUSHING REPORT

SYSTEM: CONTRACT NO: PAGE : OF

MAIN P&ID No: LOCATION:

FLUSHING CIRCUIT / TEST PACK No: FLUSHING MEDIA:

No Iso Number Sheet Rev Line Number Remarks

10

11

12

Y N/A N

1 Circuit has been hydrotested 1

2 Circuit isolated 2

3 Vents and drains installed 3

4 Adequate flow for flush 4

5 Circuit is clean to acceptable standard 5

6 NDT complete 6

7 Instruments removed 7

8 Fill and flushing connections installed 8

9 Circuit flushed free of debris 9

10 Circuit drained 10

THE ABOVE TEST PACK HAS BEEN FLUSHED AND DRAINED AFTER HYDROTEST.

REMARKS:

COMPLETED BY SAJER BGC

SIGNATURE

NAME

DATE

BGC-TP-FORM-08