(FORM DE-F-98B)

DAYANG ENTERPRISE SDN. BHD.


(61505-V)

NEAR MISS REPORTING


SERIAL NO.: _________________

LOCATION (TEMPAT) : FABRICATION YARD (BINTULU)


OBSERVATION (ATTACH SKETCH IF NECESSARY) :
(PEMERHATIAN / TINJAUAN)

Lorry crane (sub-con to DESB) was transferring I-beams from BORF to Fabrication Yard. It was noticed that
defective web-slings (5-tonnes) was used for lifting activity.

(Refer to photo attached)

BASIC CAUSE (ROOT CAUSE) :

The lorry crane operator had overlooked on pre-job inspection for the condition of all lifting gears that are used
for routine / daily activities.

IMMEDIATE CAUSE :

Peak period for leased lorry cranes due to the current local demand.

ACTION TAKEN :

The lifting activity was immediately stopped for rectification. The activity was resumed after the damaged web-
sling was replaced. Riggers were advised to double check on length of tag-lines.

RECOMMENDATION :

The lorry crane operator was advised to carry out pre-job inspection prior to any lifting activity. He was also
advised to request for DESB R/S personnel to ‘double-check’, as re-assurance measures.

Both DESB & Sub-con are responsible to ensure the personnel safety while carrying out the job. Therefore, it
is the TEAM effort to reduce risk to personnel injuries.

REPORTED BY : ___________________ CHECKED BY : _________________


DATE : ___________________ DATE : _________________
SIGNATURE : ___________________ SIGNATURE : _________________

REV. 2 SR/HA
JUNE’11 DE-F-98B / NEAR MISS REPORTING
DAMAGED WEB-SLING USED FOR LIFTING:

WEB-SLING REPLACED:

REV. 2 SR/HA
JUNE’11 DE-F-98B / NEAR MISS REPORTING