Professional Documents
Culture Documents
METHOD STATEMENT
FOR
REPAIRS OF CRACKS ACROSS THE WALL AT CONTROL MONITORUING BASIN
DATE
BGR ENERGY SYSTEM LIMITED Page 2 of 5
POWER PROJECTS DIVISION
DOCUMENT NO.: GID-253-CV-GTPP-SITE-012 Rev. 0
METHOD STATEMENT FOR REPAIRS Dated 27.10.2018
OF CRACKS ACROSS THE WALL AT CONTROL MONITORUING
BASIN
Contents:
Sl No. Description
1. Scope.
2. Purpose.
3. General Requirements.
4. Material Description.
5. Equipment, Machines & Tools.
6. Procedure.
7. Quality Assurance, & Quality Control.
8. Safety Concerns.
BGR ENERGY SYSTEM LIMITED Page 3 of 5
POWER PROJECTS DIVISION
DOCUMENT NO.: GID-253-CV-GTPP-SITE-012 Rev. 0
METHOD STATEMENT FOR REPAIRS Dated 27.10.2018
OF CRACKS ACROSS THE WALL AT CONTROL MONITORUING
BASIN
1. Scope:
2. Purpose:
3. General Requirements:
4. Material Description.
Chisel
Hammer
Plumb bob
Drilling machine
Form work
Mortar pan, trowel
Trowel
Finishing plates
Measuring jar
BGR ENERGY SYSTEM LIMITED Page 4 of 5
POWER PROJECTS DIVISION
DOCUMENT NO.: GID-253-CV-GTPP-SITE-012 Rev. 0
METHOD STATEMENT FOR REPAIRS Dated 27.10.2018
OF CRACKS ACROSS THE WALL AT CONTROL MONITORUING
BASIN
6. Procedure:
f) Fixing of Nozzles.
PVC Nozzles of 10mm dia shall be fixed on both side surface and top of the
wall for a depth of 100-150mm and sealed with M- seal. Nozzles shall be
fixed top surface of wall exactly on crack.
8. Safety concerns: