Supplier´s logo
Test voltage and time: __1___ kVDC for _1__ min Acceptance criteria: I. R. > ___1___ MΩ
NOTHING FOLLOWS
SIGNATURE:
DATE: 19-Dec-19
Document Nº:
ABENER CONSTRUCTION OF Waad Al-Shamal ISCCPP
Contract No.: 4400006770
Supplier´s logo
LV Cable Pulling,Termination & Testing : RSI No. : 4011-RSI-CGA-078-425- 3195 Date : 02-May-2019
Inspection Description : IR & Continuity test .
Reference Documents/Drawing Details : 4011-DRA-ABE-000-000-
0006
Test voltage and time: __1___ kVDC for _1__ min Acceptance criteria: I. R. > ___1___ MΩ
SIGNATURE:
DATE: 2-May-19 2-May-19