Document Title:
Project Name:
TABLE OF CONTENTS
SECTION 1: INTRODUCTION 3
Section 1.1 - Introduction 4
SECTION 2: QUOTATION 5
Section 2.1 - Equipment Supply Price 6
Section 2.2 - Main Components of Equipment 7
SECTION 3: EQUIPMENT DESIGN INFORMATION 11
Section 3.1 - Equipment Technical Specifications 12
Section 3.2 - Equipment Flow Chart 12
Section 3.3 - Main Configuration of Equipment 12
SECTION 4: EQUIPMENT QUALITY CONTROL PLAN 12
Section 4.1 - Equipment Fabrication Quality Control Plan 13
PHOTOS 14
SECTION 1: INTRODUCTION
CONTENT
SECTION 1. 1 INTRODUCTION
Zhengzhou, China
14 June 14, 2020
In this file, we have presented quotations for Automatic Dry Mortar Plant (hereinafter collectively
refer to equipment).
Firstly, our quotation of prices for supply of Automatic Dry Mortar Plant is stated in section 2.1
Yours sincerely,
Selina Zhang
Senior Project Manager
Tel: +86 138 3802 6486
Email: vip@dry-mortar-plant.com
BH Mortar Industrial Co., Ltd
www.dry-mortar-plant.com www.bhmatech.com
SECTION 2: QUOTATION
CONTENT
1) Supply Price
Our price is to supply the Automatic Dry Mortar Plant including equipment design,
manufacturing:.
Unit Price Amount
SN Description Qty
(US$) (US$)
Remarks:
1. Price include package fee.
2. Spare parts in wooden case, main parts covered by plastic film, anti-moisture proof.
3. Price exclude on-site installation and commissioning. If required, we can send 1~2
engineers (salary: $130/day/person) for guiding installation on site.Client will in charge of
round tickets, visa charge, local accommodation.
4. Loading port: Qingdao port, China
a) Price term for supplying the equipment quoted herein is based on CIF Karachi, Pakistan
INCOTERMS® 2010.
b) The equipment quoted herein is based on the equipment technical proposal including
equipment specifications, major configuration of equipment, design drawings, and
quality control plan specified in SECTION 3 and SECTION 4 in this file.
3) Payment Terms
- 30% by T/T as deposit.
- 70% by T/T before delivery the goods.
4) Warranty Period
5) After-sale service
100% brand new when leaving the factory. The seller guarantee quality of the machines for a
period of one year from the date of trial run finish. If any parts (excluding wearing parts) are
found defective (exclude that caused by person’s wrong usage) in quality in the first year,
BH should replace free-of-cost. After one year, parts can be replaced on favorable payment
basis.
6) Validity of Quotation
Section 2.2 - Main Components of Three Cylinder Sand Dry BH6210 (10TPH)
Total
Item Name Spc Qty power Picture
(KW)
500X9000mm,
3 Belt conveyor 2 sets 6
500X6500mm
9 Control cabinet 1
Total
Item Spc Qty Reference Photo
Power (KW)
Outer
1.1 3
ladders
Dust
1.2 3
collector
Storage silo Level
1 1.3 6
100T regular
Elevator
3
bucket 3.2 Motor 2 4+5.5
Weighing
4.1 2.5m³ 1
hopper
Conveying
4.4 1 7.5
auger
Pre-mix
5.1 3m³ 1
tank
Pneumatic
Premix 5.2 butterfly Φ300 1
5 valve
system
Arc
5.3 breaking 1
device
Principal
6.3 108×10mm 1
Null gravity axis
paddle
6
mixer 6.4 Wallboard 10mm 1
3m³
6.5 Reducer XWD8 1
6.6 Motor 1 22
6.7 Cylinder 2
Cylindrical
7.1 A3 1
shell
End
7 7.2 Wallboard 8mm 2
product silo
Principal
7.3 108×10mm 1
axis
Automatic
Auto 8.1 2
metering
8 packing
machine 8.2 Air cylinder 2
Impluse
9.1 dust BH12 3 6.6
collector
Dust
9
collector 9.2 Dust pipe 2
Pneumatic
11 Air compressor 0.9m³ 1 15
system
Stair and
12.4 30*30mm
railing
Control
13.1 panel and 1
box
PLC
Electric
automatic 13.2 1
13 components
control
system 13.3 Push button 1
13.4 Alarm 1
13.5 Computer 1
CONTENT
Item Parameter
Capacity 20~25t/h
Total power 100.5kw
Occupation area 180~200m2
Total weight 45ton
Item Configuration
Motor CE certified
Electric component Schneider/Siemens
CONTENT
www.dry-mortar-plant.com www.bhmatech.com 12 / 19 2020-06-14
Project Name : Dry Mix Plant
Doc. Title : Automatic Dry Mortar Plant (20~25TPH) Quotation
Doc. No. : BHS20200614
Email/Tel : vip@dry-mortar-plant.com / +86 138 3802 6486
Fabrication quality of the equipment is controlled using the Steel Fabrication Control Plan which
has been developed and used by BH for different projects.
The Steel Fabrication Quality Plan mainly covers:
Material (Purchase, Receipt, Marking, Inspection and Checking)
Welding (Welder Qualifications, Welder Procedures, Weld Inspection)
BH of steel plate and welded sections (Operator Qualification, Extent of
Testing, Repair Welding, Dimensional Survey)
Surface Preparation for Painting (Blasting, Visual Inspection)
Trial Assembly (After all welding has been completed) and Tolerances
Based upon the Steel Fabrication Control Plan, a workshop specific Inspection and Test Plan (ITP)
for the equipment is established. If the equipment is being fabricated in several workshops then a
separate ITP will be develop for each workplace.
The Inspection and Test Plan shows the requirements for inspection points and quality checks at
various stages throughout the manufacturing procedure, and further shows who has
responsibility for carrying out the inspections and checks.
Each of the workshops used by BH has a QA/QC system that has been established in accordance
with ISO9001-2008 .
The workshop QA/QC managers carry out the inspection and testing required, and generate the
necessary documentation required by the Steel Fabrication Control Plan and Inspection and Test
Plan.
4) BH QA/QC Department
BH’s fabrication QA/QC department consists of a number of highly experienced Engineers and
operates independently from the workshop.
BH QA/QC team has total control over the quality and eventual acceptance of the equipment.