You are on page 1of 30

CALCULATION SUMMARY

Project Name : FAS Building7 Project Location: Kragujevac, Serbia

Drawing No. : City:

Design Areas
Design Area Calc. Mode Occupancy Area of Total Water Pressure @ Min. Min. Min. Calculated Hose Margin To
Name (Model) Application Source Density Pressure Flow Heads Streams Source

(m²) (l/min) (bar) (l/min/m²) (bar) (l/min) # (l/min) (bar)

Required
3 Demand (HW) extra hazard 231.8 7514.01 24 1.51 198.72 28 1900 0.91
8.05

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : FAS Building7

Contract No. : City:

Project Location: Kragujevac, Serbia Date: 8/9/2014

Contractor Information
Name of Contractor:

Address: City:

Phone Number: E-mail:

Name of Designer:

Authority Having Jurisdiction:

Design
Remote Area Name 3

Remote Area Location Riser3

Occupancy Classification extra hazard

Density (l/min/m²) 24

Area of Application (m²) 231.8

Coverage per Sprinkler (m²) 8.3

Number of Calculated Sprinklers 28

In-Rack Demand (l/min) 0

Special Heads

Hose Streams (l/min) 1900

Total Water Required (incl. Hose Streams) (l/min) 7514.01

Required Pressure at Source (bar) 8.05

Type of System Wet

Volume - Entire System (l) 263375.8 l

Water Supply Information


Date DD/MM/YYYY

Location pump station

Source W1

Notes

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 2
Job : FAS Building7 Node Labels: Node Reference
Pipe Labels: Off

Diagram for Design Area : 3


(Optimized Hydraulic Simplified)

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 3
Job : FAS Building7

Hydraulic Analysis for : 3


Calculation Info
Calculation Mode Demand
Hydraulic Model Hazen-Williams
Fluid Name Water @ 60F (15.6C)
Fluid Weight, (N/m³) N/A for Hazen-Williams calculation.
Fluid Dynamic Viscosity, (Pa·s) N/A for Hazen-Williams calculation.

Water Supply Parameters

Supply 1 : W1 Flow (l/min) Pressure (bar)


0 9.75
7571 8.95
11356 7.64

Hoses
Inside Hose Flow / Standpipe Demand (l/min) 0

Outside Hose Flow (l/min) 1900

Additional Outside Hose Flow (l/min)

Other (custom defined) Hose Flow (l/min) 0

Total Hose Flow (l/min) 1900

Sprinklers
Ovehead Sprinkler Flow (l/min) 5614.01

InRack Sprinkler Flow (l/min) 0

Other (custom defined) Sprinkler Flow (l/min) 0

Total Sprinkler Flow (l/min) 5614.01

Other
Required Margin of Safety (bar) 0

W1 - Pressure (bar) 8.05

W1 - Flow (l/min) 7514.01

Demand w/o System Pump(s) N/A

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 4
Job : FAS Building7

Hydraulic Analysis for : 3

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 5
Job : FAS Building7

Hydraulic Analysis for : 3

Graph Labels
Values
Label Description
Flow (l/min) Pressure (bar)
S1 Supply point #1 - Static 0 9.75
S2 Supply point #2 7571 8.95
S3 Supply point #3 11356 7.64
D1 Elevation Pressure 0 1.25
D2 System Demand 7514.01 8.05

Curve Intersections & Safety Margins


Intersection Safety Margin
Curve Name
Pressure (bar) Flow (l/min) Pressure (bar) @ Flow (l/min)
Supply 8.83 7971.53 0.91 7514.01

Open Heads
Required Calculated
Head Ref. Head Type Coverage K-Factor
Density Flow Pressure Density Flow Pressure

(m²) (lpm/bar½) (l/min/m²) (l/min) (bar) (l/min/m²) (l/min) (bar)

Overhead
S1 8.3 161.4 24 198.72 1.51 24.1 199.8 1.53
Sprinkler

Overhead
S10 8.3 161.4 24 198.72 1.51 24.1 199.24 1.52
Sprinkler

Overhead
S11 8.3 161.4 24 198.72 1.51 24.1 199.41 1.53
Sprinkler

Overhead
S12 8.3 161.4 24 198.72 1.51 24.2 200.19 1.54
Sprinkler

Overhead
S13 8.3 161.4 24 198.72 1.51 24.4 201.97 1.56
Sprinkler

Overhead
S14 8.3 161.4 24 198.72 1.51 24.8 205.1 1.61
Sprinkler

Overhead
S15 8.3 161.4 24 198.72 1.51 24 199.13 1.52
Sprinkler

Overhead
S16 8.3 161.4 24 198.72 1.51 24 198.74 1.52
Sprinkler

Overhead
S17 8.3 161.4 24 198.72 1.51 24 198.72 1.51
Sprinkler

Overhead
S18 8.3 161.4 24 198.72 1.51 24 198.89 1.52
Sprinkler

Overhead
S19 8.3 161.4 24 198.72 1.51 24.1 199.68 1.53
Sprinkler

Overhead
S2 8.3 161.4 24 198.72 1.51 24.1 199.43 1.53
Sprinkler

Overhead
S20 8.3 161.4 24 198.72 1.51 24.3 201.47 1.56
Sprinkler

Overhead
S21 8.3 161.4 24 198.72 1.51 24.7 204.62 1.61
Sprinkler

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 6
Overhead
S22 8.3 161.4 24 198.72 1.51 24.1 199.16 1.52
Sprinkler

Overhead
S23 8.3 161.4 24 198.72 1.51 24 198.78 1.52
Sprinkler

Overhead
S24 8.3 161.4 24 198.72 1.51 24 198.76 1.52
Sprinkler

Overhead
S25 8.3 161.4 24 198.72 1.51 24 198.94 1.52
Sprinkler

Overhead
S26 8.3 161.4 24 198.72 1.51 24.1 199.74 1.53
Sprinkler

Overhead
S27 8.3 161.4 24 198.72 1.51 24.3 201.54 1.56
Sprinkler

Overhead
S28 8.3 161.4 24 198.72 1.51 24.7 204.71 1.61
Sprinkler

Overhead
S3 8.3 161.4 24 198.72 1.51 24.1 199.41 1.53
Sprinkler

Overhead
S4 8.3 161.4 24 198.72 1.51 24.1 199.6 1.53
Sprinkler

Overhead
S5 8.3 161.4 24 198.72 1.51 24.2 200.41 1.54
Sprinkler

Overhead
S6 8.3 161.4 24 198.72 1.51 24.4 202.24 1.57
Sprinkler

Overhead
S7 8.3 161.4 24 198.72 1.51 24.8 205.43 1.62
Sprinkler

Overhead
S8 8.3 161.4 24 198.72 1.51 24.1 199.66 1.53
Sprinkler

Overhead
S9 8.3 161.4 24 198.72 1.51 24.1 199.26 1.52
Sprinkler

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 7
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
S17 Overhead Sprinkler 161.4 198.72 8.3 1.51 1.51
11.5 HEAD Open 0 24 -1.25 198.72
S16 Overhead Sprinkler 161.4 198.74 8.3 1.52 1.51
11.5 HEAD Open 0.02 24 -1.25 198.72
S24 Overhead Sprinkler 161.4 198.76 8.3 1.52 1.51
11.5 HEAD Open 0.04 24 -1.25 198.72
S23 Overhead Sprinkler 161.4 198.78 8.3 1.52 1.51
11.5 HEAD Open 0.06 24 -1.25 198.72
S18 Overhead Sprinkler 161.4 198.89 8.3 1.52 1.51
11.5 HEAD Open 0.17 24 -1.25 198.72
S25 Overhead Sprinkler 161.4 198.94 8.3 1.52 1.51
11.5 HEAD Open 0.22 24 -1.25 198.72
S15 Overhead Sprinkler 161.4 199.13 8.3 1.52 1.51
11.5 HEAD Open 0.41 24 -1.25 198.72
S22 Overhead Sprinkler 161.4 199.16 8.3 1.52 1.51
11.5 HEAD Open 0.44 24.1 -1.25 198.72
S10 Overhead Sprinkler 161.4 199.24 8.3 1.52 1.51
11.4 HEAD Open 0.53 24.1 -1.24 198.72
S9 Overhead Sprinkler 161.4 199.26 8.3 1.52 1.51
11.4 HEAD Open 0.54 24.1 -1.24 198.72
S11 Overhead Sprinkler 161.4 199.41 8.3 1.53 1.51
11.4 HEAD Open 0.69 24.1 -1.24 198.72
S3 Overhead Sprinkler 161.4 199.41 8.3 1.53 1.51
11.4 HEAD Open 0.69 24.1 -1.24 198.72
S2 Overhead Sprinkler 161.4 199.43 8.3 1.53 1.51
11.4 HEAD Open 0.71 24.1 -1.24 198.72
S4 Overhead Sprinkler 161.4 199.6 8.3 1.53 1.51
11.4 HEAD Open 0.88 24.1 -1.24 198.72
S8 Overhead Sprinkler 161.4 199.66 8.3 1.53 1.51
11.4 HEAD Open 0.94 24.1 -1.24 198.72
S19 Overhead Sprinkler 161.4 199.68 8.3 1.53 1.51
11.5 HEAD Open 0.96 24.1 -1.25 198.72
S26 Overhead Sprinkler 161.4 199.74 8.3 1.53 1.51
11.5 HEAD Open 1.02 24.1 -1.25 198.72
S1 Overhead Sprinkler 161.4 199.8 8.3 1.53 1.51
11.4 HEAD Open 1.08 24.1 -1.24 198.72
S12 Overhead Sprinkler 161.4 200.19 8.3 1.54 1.51
11.4 HEAD Open 1.47 24.2 -1.24 198.72
S5 Overhead Sprinkler 161.4 200.41 8.3 1.54 1.51
11.4 HEAD Open 1.69 24.2 -1.24 198.72
S20 Overhead Sprinkler 161.4 201.47 8.3 1.56 1.51
11.5 HEAD Open 2.75 24.3 -1.25 198.72
S27 Overhead Sprinkler 161.4 201.54 8.3 1.56 1.51
11.5 HEAD Open 2.82 24.3 -1.25 198.72
S13 Overhead Sprinkler 161.4 201.97 8.3 1.56 1.51
11.4 HEAD Open 3.25 24.4 -1.24 198.72
S6 Overhead Sprinkler 161.4 202.24 8.3 1.57 1.51
11.4 HEAD Open 3.52 24.4 -1.24 198.72
S21 Overhead Sprinkler 161.4 204.62 8.3 1.61 1.51
11.5 HEAD Open 5.9 24.7 -1.25 198.72
S28 Overhead Sprinkler 161.4 204.71 8.3 1.61 1.51
11.5 HEAD Open 5.99 24.7 -1.25 198.72
S14 Overhead Sprinkler 161.4 205.1 8.3 1.61 1.51
11.4 HEAD Open 6.38 24.8 -1.24 198.72

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 8
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
S7 Overhead Sprinkler 161.4 205.43 8.3 1.62 1.51
11.4 HEAD Open 6.71 24.8 -1.24 198.72
130 Node 1.86
11.2 NODE -1.23
129 Node 1.86
11.2 NODE -1.23
220 Node 1.86
11.2 NODE -1.23
221 Node 1.86
11.2 NODE -1.23
131 Node 1.87
11.2 NODE -1.23
219 Node 1.87
11.2 NODE -1.23
128 Node 1.87
11.2 NODE -1.23
001 Node 1.87
11.2 NODE -1.23
162 Node 1.87
11.1 NODE -1.22
161 Node 1.87
11.1 NODE -1.22
163 Node 1.88
11.1 NODE -1.22
252 Node 1.88
11.1 NODE -1.22
253 Node 1.88
11.1 NODE -1.22
251 Node 1.88
11.1 NODE -1.22
160 Node 1.88
11.1 NODE -1.22
132 Node 1.88
11.2 NODE -1.23
218 Node 1.88
11.2 NODE -1.23
002 Node 1.88
11.1 NODE -1.22
164 Node 1.89
11.1 NODE -1.22
250 Node 1.89
11.1 NODE -1.22
133 Node 1.91
11.2 NODE -1.23
217 Node 1.92
11.2 NODE -1.23
165 Node 1.92
11.1 NODE -1.22
249 Node 1.93
11.1 NODE -1.22
134 Node 1.97
11.2 NODE -1.23
216 Node 1.97
11.2 NODE -1.23

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 9
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
126 Node 1.98
10.9 NODE -1.2
003 Node 1.98
10.9 NODE -1.2
125 Node 1.98
10.9 NODE -1.2
004 Node 1.98
10.9 NODE -1.2
166 Node 1.98
11.1 NODE -1.22
124 Node 1.98
10.9 NODE -1.2
005 Node 1.98
10.9 NODE -1.2
248 Node 1.99
11.1 NODE -1.22
111 Node 4.41
10.9 NODE -1.2
110 Node 4.41
10.9 NODE -1.2
109 Node 4.42
10.9 NODE -1.2
108 Node 4.44
10.9 NODE -1.2
107 Node 4.46
10.9 NODE -1.2
038 Node 4.51
10.9 NODE -1.2
043 Node 6.39
5.5 NODE -0.67
044-O Node 6.51
4.41 NODE -0.56
044-I Node 6.66
4.105 NODE -0.53
045-O Node 6.67
4.067 NODE -0.53
045-I Node 6.71
3.8 NODE -0.5
H1 Outside Hose 6.82
1900
1.7 HOSE -0.29 1900
046 Node 6.89
3.5 NODE -0.47
053 Node 7.19
1.7 NODE -0.29
054 Node 7.21
1.7 NODE -0.29
056 Node 7.44
1.7 NODE -0.29
072 Node 7.98
-1.3 NODE 0
071 Node 7.98
-1.3 NODE 0
078 Node 7.98
-1.3 NODE 0

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 10
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Node Data
Node# Type K-Fact. Discharge Coverage Tot. Pres. Req. Pres.
Elev Hgroup Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
l/min m² bar bar
lpm/bar½
m l/min l/min/m² bar l/min
065 Node 7.98
-1.3 NODE 0
075 Node 7.98
-1.3 NODE 0
061 Node 7.98
-1.3 NODE 0
059 Node 7.98
-1.3 NODE 0
074 Node 7.98
-1.3 NODE 0
073 Node 7.98
-1.3 NODE 0
W1 Supply 8.05
-7514.01
-1.3 SUPPLY 0

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 11
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
1 Sprig 40 120 1(us.Tee-Br); 0.3 198.72 0.1752 0.18 130
1151 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 S17
1 Brline 10 120 155.42 0.0013 0.00 131
1(us.Tee-Run); 2.5
604 PIPE 2.5 0.1016 0.74 0.00 0 130
1 Brline 10 120 354.31 0.0058 0.01 132
1(us.Tee-Run); 2.5
605 PIPE 2.5 0.1016 1.68 0.01 0 131
1 Brline 10 120 553.99 0.0132 0.03 133
1(us.Tee-Run); 2.5
606 PIPE 2.5 0.1016 2.62 0.03 0 132
1 Brline 10 120 755.46 0.0234 0.06 134
1(us.Tee-Run); 2.5
607 PIPE 2.5 0.1016 3.58 0.06 0 133
1(us.Tee-Br);23(us.Tee-Run);1(us.
1 Brline 10 120 58.758 960.08 0.0365 0.1 109
90);
632 PIPE 2.5 0.1016 66.29 4.55 2.42 0.03 134
7.532
1 Brline 40 120 2792.09 0.0045 0.03 108
1(us.Tee-Run); 2.9
528 PIPE 6 0.1016 2.5 0.01 0 109
1 Brline 40 120 3754.63 0.0079 0.06 107
1(us.Tee-Run); 3.7
527 PIPE 6 0.1016 3.36 0.03 0 108
1 Brline 40 120 4723.37 0.012 0.09 038
1(us.Tee-Run); 3.5
526 PIPE 6 0.1016 4.22 0.04 0 107
1 Brline 40 120 5(us.90); 60.093 5614.01 0.0166 0.13 043
040 PIPE 6 0.1016 21.336 81.429 5.02 1.35 0.53 038
1 Brline 10 120 1(coupling); 1.09 5614.01 0.0132 0.1 044-O
041 PIPE 6 0.1016 0.383 1.473 4.57 0.02 0.11 043
1 VALVE AV-1 Check 0 5614.01 0.401 0 044-I
0.305
1239 VALVE 6 0 0 0.12 0.03 044-O
1 Cmain 10 120 1(coupling); 0.038 5614.01 0.0132 0.1 045-O
042 PIPE 6 0.1016 0.383 0.421 4.57 0.01 0.00 044-I
1 VALVE Gate A2360 0 5614.01 0.0193 0 045-I
0.267
1238 VALVE 6 0 0 0.01 0.03 045-O
1 Cmain 10 120 1(us.Tee-Br); 0.3 5614.01 0.0132 0.1 046
043 PIPE 6 0.1016 11.497 11.797 4.57 0.16 0.03 045-I
1 Cmain 40 120 1(us.Tee-Br);6(us.90); 32.475 5614.01 0.0014 0.02 053
483 PIPE 10 0.1016 55.473 87.948 1.8 0.12 0.18 046
1 Cmain 40 120 1(us.Tee-Run);2(us.45);2(us.90); 578.896 3015.29 0.0004 0.00 056
519 PIPE 10 0.1016 20.117 599.013 0.96 0.26 0 053
1 Cmain 40 120 2(us.90); 90.069 7514.01 0.0023 0.03 059
489 PIPE 10 0.1016 13.411 103.48 2.4 0.24 0.29 056
1 Cmain 40 120 1(us.90); 23.208 7514.01 0.0023 0.03 W1
491 PIPE 10 0.1016 6.706 29.914 2.4 0.07 0 059
2 Sprig 40 120 1(us.Tee-Br); 0.3 198.74 0.1752 0.18 129
1150 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 S16
2 Brline 10 120 242.03 0.0028 0.01 128
1(us.Tee-Run); 2.5
602 PIPE 2.5 0.1016 1.15 0.01 0 129
2 Brline 10 120 1(us.Tee-Br);1(us.90); 1.235 441.16 0.0086 0.02 126
600 PIPE 2.5 0.1016 7.532 8.767 2.09 0.08 0.03 128
2 Brline 40 120 427.18 0.0001 0 125
1(us.Tee-Run); 3.7
564 PIPE 6 0.1016 0.38 0 0 126
2 Brline 40 120 1(us.Tee-Br); 3.5 872.62 0.0005 0.00 124
563 PIPE 6 0.1016 9.144 12.644 0.78 0.01 0 125
2 Brline 10 120 30(us.Tee-Run);1(us.Tee-Br); 74.393 872.62 0.0306 0.09 111
532 PIPE 2.5 0.1016 5.021 79.414 4.13 2.43 0 124
2 Brline 40 120 872.62 0.0005 0.00 110
1(us.Tee-Run); 3.5
530 PIPE 6 0.1016 0.78 0.00 0 111
2 Brline 40 120 1832.01 0.0021 0.01 109
1(us.Tee-Run); 3.7
529 PIPE 6 0.1016 1.64 0.01 0 110

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 12
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.86
198.72 1.51
1.87
1.86
1.88
1.87
1.91
1.88
1.97
1.91

4.42
1.97

4.44
4.42
4.46
4.44
4.51
4.46
6.39
4.51
6.51
6.39
6.66
6.51
6.67
6.66
6.71
6.67
6.89
6.71
7.19
6.89
7.44
7.19
7.98
7.44
8.05
-7514.01
7.98
1.86
198.74 1.52
1.87
1.86
1.98
1.87
1.98
1.98
1.98
1.98
4.41
1.98
4.41
4.41
4.42
4.41

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 13
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
3 Sprig 40 120 1(us.Tee-Br); 0.3 198.76 0.1753 0.18 220
1121 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 S24
3 Brline 10 120 157.62 0.0013 0.00 219
1(us.Tee-Run); 2.5
571 PIPE 2.5 0.1016 0.75 0.00 0 220
3 Brline 10 120 356.56 0.0058 0.01 218
1(us.Tee-Run); 2.5
572 PIPE 2.5 0.1016 1.69 0.01 0 219
3 Brline 10 120 556.3 0.0133 0.03 217
1(us.Tee-Run); 2.5
573 PIPE 2.5 0.1016 2.64 0.03 0 218
3 Brline 10 120 757.84 0.0236 0.06 216
1(us.Tee-Run); 2.5
574 PIPE 2.5 0.1016 3.59 0.06 0 217
1(us.Tee-Br);23(us.Tee-Run);1(us.
3 Brline 10 120 58.758 962.55 0.0367 0.1 108
90);
599 PIPE 2.5 0.1016 66.29 4.56 2.43 0.03 216
7.532
4 Sprig 40 120 1(us.Tee-Br); 0.3 198.78 0.1753 0.18 221
1120 PIPE 1 0.1016 1.524 1.824 5.94 0.32 0.03 S23
4 Brline 10 120 239.92 0.0028 0.01 001
1(us.Tee-Run); 2.5
569 PIPE 2.5 0.1016 1.14 0.01 0 221
4 Brline 10 120 1(us.Tee-Br);1(us.90); 1.235 439.08 0.0086 0.02 003
567 PIPE 2.5 0.1016 7.532 8.767 2.08 0.08 0.03 001
4 Brline 40 120 453.06 0.0002 0 004
1(us.Tee-Run); 3.7
566 PIPE 6 0.1016 0.41 0 0 003
4 Brline 40 120 1(us.Tee-Br); 3.5 890.64 0.0005 0.00 005
003 PIPE 6 0.1016 9.144 12.644 0.8 0.01 0 004
4 Brline 10 120 30(us.Tee-Run);1(us.Tee-Br); 74.393 890.64 0.0318 0.09 038
005 PIPE 2.5 0.1016 5.021 79.414 4.22 2.52 0 005
5 Sprig 40 120 1(us.Tee-Br); 0.3 198.89 0.1755 0.18 131
1152 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 S18
6 Sprig 40 120 1(us.Tee-Br); 0.3 198.94 0.1755 0.18 219
1122 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 S25
7 Sprig 40 120 1(us.Tee-Br); 0.3 199.13 0.1758 0.18 128
1149 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 S15
8 Sprig 40 120 1(us.Tee-Br); 0.3 199.16 0.1759 0.18 001
1119 PIPE 1 0.1016 1.524 1.824 5.95 0.32 0.03 S22
9 Sprig 40 120 1(us.Tee-Br); 0.3 199.24 0.176 0.18 162
1181 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 S10
9 Brline 10 120 152.73 0.0012 0.00 163
1(us.Tee-Run); 2.5
637 PIPE 2.5 0.1016 0.72 0.00 0 162
9 Brline 10 120 352.14 0.0057 0.01 164
1(us.Tee-Run); 2.5
638 PIPE 2.5 0.1016 1.67 0.01 0 163
9 Brline 10 120 552.32 0.0131 0.03 165
1(us.Tee-Run); 2.5
639 PIPE 2.5 0.1016 2.62 0.03 0 164
9 Brline 10 120 754.29 0.0234 0.06 166
1(us.Tee-Run); 2.5
640 PIPE 2.5 0.1016 3.57 0.06 0 165
1(us.Tee-Br);23(us.Tee-Run);1(us.
9 Brline 10 120 58.658 959.39 0.0365 0.1 110
90);
665 PIPE 2.5 0.1016 66.19 4.54 2.41 0.02 166
7.532
10 Sprig 40 120 1(us.Tee-Br); 0.3 199.26 0.1761 0.18 161
1180 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 S9
10 Brline 10 120 245.78 0.0029 0.01 160
1(us.Tee-Run); 2.5
635 PIPE 2.5 0.1016 1.16 0.01 0 161
10 Brline 10 120 1(us.Tee-Br);1(us.90); 1.135 445.44 0.0088 0.02 125
633 PIPE 2.5 0.1016 7.532 8.667 2.11 0.08 0.02 160
11 Sprig 40 120 1(us.Tee-Br); 0.3 199.41 0.1763 0.18 163
1182 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 S11

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 14
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.86
198.76 1.52
1.87
1.86
1.88
1.87
1.92
1.88
1.97
1.92

4.44
1.97

1.86
198.78 1.52
1.87
1.86
1.98
1.87
1.98
1.98
1.98
1.98
4.51
1.98
1.87
198.89 1.52
1.87
198.94 1.52
1.87
199.13 1.52
1.87
199.16 1.52
1.87
199.24 1.52
1.88
1.87
1.89
1.88
1.92
1.89
1.98
1.92

4.41
1.98

1.87
199.26 1.52
1.88
1.87
1.98
1.88
1.88
199.41 1.53

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 15
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
12 Sprig 40 120 1(us.Tee-Br); 0.3 199.41 0.1763 0.18 252
1236 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 S3
12 Brline 10 120 161.07 0.0013 0.00 251
1(us.Tee-Run); 2.5
695 PIPE 2.5 0.1016 0.76 0.00 0 252
12 Brline 10 120 360.66 0.006 0.01 250
1(us.Tee-Run); 2.5
694 PIPE 2.5 0.1016 1.71 0.01 0 251
12 Brline 10 120 561.07 0.0135 0.04 249
1(us.Tee-Run); 2.5
693 PIPE 2.5 0.1016 2.66 0.03 0 250
12 Brline 10 120 763.3 0.0239 0.07 248
1(us.Tee-Run); 2.5
692 PIPE 2.5 0.1016 3.62 0.06 0 249
1(us.Tee-Br);23(us.Tee-Run);1(us.
12 Brline 10 120 58.658 968.73 0.0371 0.11 107
90);
667 PIPE 2.5 0.1016 66.19 4.59 2.46 0.02 248
7.532
13 Sprig 40 120 1(us.Tee-Br); 0.3 199.43 0.1763 0.18 253
1237 PIPE 1 0.1016 1.524 1.824 5.96 0.32 0.03 S2
13 Brline 10 120 237.77 0.0028 0.01 002
1(us.Tee-Run); 2.5
697 PIPE 2.5 0.1016 1.13 0.01 0 253
13 Brline 10 120 1(us.Tee-Br);1(us.90); 1.135 437.57 0.0085 0.02 004
002 PIPE 2.5 0.1016 7.532 8.667 2.07 0.07 0.02 002
14 Sprig 40 120 1(us.Tee-Br); 0.3 199.6 0.1766 0.18 251
1235 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 S4
15 Sprig 40 120 1(us.Tee-Br); 0.3 199.66 0.1767 0.18 160
1179 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 S8
16 Sprig 40 120 1(us.Tee-Br); 0.3 199.68 0.1768 0.18 132
1153 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 S19
17 Sprig 40 120 1(us.Tee-Br); 0.3 199.74 0.1769 0.18 218
1123 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 S26
18 Sprig 40 120 1(us.Tee-Br); 0.3 199.8 0.177 0.18 002
698 PIPE 1 0.1016 1.524 1.824 5.97 0.32 0.03 S1
19 Sprig 40 120 1(us.Tee-Br); 0.3 200.19 0.1776 0.18 164
1183 PIPE 1 0.1016 1.524 1.824 5.98 0.32 0.03 S12
20 Sprig 40 120 1(us.Tee-Br); 0.3 200.41 0.178 0.18 250
1234 PIPE 1 0.1016 1.524 1.824 5.99 0.32 0.03 S5
21 Sprig 40 120 1(us.Tee-Br); 0.3 201.47 0.1797 0.18 133
1154 PIPE 1 0.1016 1.524 1.824 6.02 0.33 0.03 S20
22 Sprig 40 120 1(us.Tee-Br); 0.3 201.54 0.1798 0.18 217
1124 PIPE 1 0.1016 1.524 1.824 6.02 0.33 0.03 S27
23 Sprig 40 120 1(us.Tee-Br); 0.3 201.97 0.1805 0.18 165
1184 PIPE 1 0.1016 1.524 1.824 6.04 0.33 0.03 S13
24 Sprig 40 120 1(us.Tee-Br); 0.3 202.24 0.181 0.18 249
1233 PIPE 1 0.1016 1.524 1.824 6.05 0.33 0.03 S6
25 Sprig 40 120 1(us.Tee-Br); 0.3 204.62 0.1849 0.19 134
1155 PIPE 1 0.1016 1.524 1.824 6.12 0.34 0.03 S21
26 Sprig 40 120 1(us.Tee-Br); 0.3 204.71 0.1851 0.19 216
1125 PIPE 1 0.1016 1.524 1.824 6.12 0.34 0.03 S28
27 Sprig 40 120 1(us.Tee-Br); 0.3 205.1 0.1857 0.19 166
1185 PIPE 1 0.1016 1.524 1.824 6.13 0.34 0.03 S14
28 Sprig 40 120 1(us.Tee-Br); 0.3 205.43 0.1863 0.19 248
1232 PIPE 1 0.1016 1.524 1.824 6.14 0.34 0.03 S7
29 Cmain 10 120 1(us.Tee-Br); 2.348 1900 0.0458 0.17 054
525 PIPE 3 0.1016 6.145 8.492 5.88 0.39 0 H1
29 Cmain 40 120 1(us.Tee-Br);1(us.90); 241.857 4498.72 0.0009 0.01 056
486 PIPE 10 0.1016 21.946 263.803 1.44 0.24 0 054
30 Brline 10 120 43.3 0.0001 0 129
1(us.Tee-Run); 2.5
603 PIPE 2.5 0.1016 0.21 0 0 130

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 16
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
1.88
199.41 1.53
1.88
1.88
1.89
1.88
1.93
1.89
1.99
1.93

4.46
1.99

1.88
199.43 1.53
1.88
1.88
1.98
1.88
1.88
199.6 1.53
1.88
199.66 1.53
1.88
199.68 1.53
1.88
199.74 1.53
1.88
199.8 1.53
1.89
200.19 1.54
1.89
200.41 1.54
1.91
201.47 1.56
1.92
201.54 1.56
1.92
201.97 1.56
1.93
202.24 1.57
1.97
204.62 1.61
1.97
204.71 1.61
1.98
205.1 1.61
1.99
205.43 1.62
7.21
1900 6.82
7.44
7.21
1.86
1.86

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 17
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Path # Type Schedule HWC Fittings Length Flow Fr.Resist. Vel.Pres. Start
Pipe Ref. Hgroup Size Rough. Eq.Len. Total Len. Velocity Loss Frict. Loss Elev. End
m l/min bar/m bar
mm m m m/s bar bar
31 Cmain 40 120 2598.72 0.0003 0.00 054
1(us.Tee-Run); 60
484 PIPE 10 0.1016 0.83 0.02 0 053
32 Cmain 40 120 1(us.Tee-Br); 232.617 1.9 0 0 074
507 PIPE 10 0.1016 15.24 247.857 0 0 0 059
32 Cmain 40 120 1(us.Tee-Br); 105.403 4.33 0 0 073
506 PIPE 10 0.1016 15.24 120.643 0.00 0 0 074
32 Cmain 40 120 5.11 0 0 072
1(us.Tee-Run); 226.39
504 PIPE 10 0.1016 0.00 0 0 073
32 Cmain 40 120 8.11 0 0 071
1(us.Tee-Run); 8.796
503 PIPE 10 0.1016 0.00 0 0 072
1(us.Tee-Run);4(us.90);1(us.45);1
32 Cmain 40 120 541.579 5.58 0 0 065
(us.Tee-Br);
497 PIPE 10 0.1016 586.994 0.00 0 0 071
45.415
32 Cmain 40 120 1(us.Tee-Br);4(us.90); 1136.821 2.9 0 0 078
514 PIPE 10 0.1016 42.062 1178.883 0 0 0 065
32 Cmain 40 120 1(us.Tee-Run);2(us.90); 472.836 5.42 0 0 075
510 PIPE 10 0.1016 13.411 486.247 0.00 0 0 078
32 Cmain 40 120 2(us.Tee-Br); 101.371 2.99 0 0 072
509 PIPE 10 0.1016 30.48 131.851 0 0 0 075
33 Brline 40 120 13.98 0 0 003
1(us.Tee-Run); 2.9
565 PIPE 6 0.1016 0.01 0 0 126
34 Brline 10 120 41.14 0.0001 0 221
1(us.Tee-Run); 2.5
570 PIPE 2.5 0.1016 0.19 0 0 220
35 Brline 10 120 46.52 0.0001 0 161
1(us.Tee-Run); 2.5
636 PIPE 2.5 0.1016 0.22 0 0 162
36 Brline 10 120 38.35 0.0001 0 253
1(us.Tee-Run); 2.5
696 PIPE 2.5 0.1016 0.18 0 0 252
37 Cmain 40 120 2.52 0 0 078
1(us.Tee-Run); 341.032
513 PIPE 10 0.1016 0 0 0 071
1(us.Tee-Run);2(elbow.22.5);1(us.
38 Cmain 40 120 225.559 2.68 0 0 061
Tee-Br);1(us.90);
493 PIPE 10 0.1016 250.858 0 0 0 065
25.298
38 Cmain 40 120 1(us.Tee-Br); 106.306 1.9 0 0 059
492 PIPE 10 0.1016 15.24 121.546 0 0 0 061
39 Cmain 40 120 1(us.Tee-Br); 227.981 2.43 0 0 074
508 PIPE 10 0.1016 15.24 243.221 0 0 0 075
40 Cmain 40 120 0.79 0 0 073
1(us.Tee-Run); 237.006
505 PIPE 10 0.1016 0 0 0 061

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 18
Job : FAS Building7 Hydraulic Calculations / Fluid Delivery Time Analysis

Pipe Data
Start Disch. Start Tot.Pres.
End Disch. End Tot.Pres.
l/min bar
l/min bar
7.21
7.19
7.98
7.98
7.98
7.98
7.98
7.98
7.98
7.98

7.98
7.98

7.98
7.98
7.98
7.98
7.98
7.98
1.98
1.98
1.86
1.86
1.87
1.87
1.88
1.88
7.98
7.98

7.98
7.98

7.98
7.98
7.98
7.98
7.98
7.98

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 19
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 1
S17 11.5 161.4 198.72 1 1x(us.Tee-Br)=1.524 0.3 120 1.51
130 11.2 198.72 26.6 1.524 0.1752 0.03
1.824 0.32
130 11.2 -43.3 2.5 2.5 120 1.86
131 11.2 155.42 66.9 0 0.0013 0
2.5 0.00
131 11.2 198.89 2.5 2.5 120 1.87
132 11.2 354.31 66.9 0 0.0058 0
2.5 0.01
132 11.2 199.68 2.5 2.5 120 1.88
133 11.2 553.99 66.9 0 0.0132 0
2.5 0.03
133 11.2 201.47 2.5 2.5 120 1.91
134 11.2 755.46 66.9 0 0.0234 0
2.5 0.06
134 11.2 204.62 2.5 1x(us.Tee-Br)=5.021 58.758 120 1.97
109 10.9 960.08 66.9 1x(us.90)=2.511 7.532 0.0365 0.03
66.29 2.42
109 10.9 1832.01 6 2.9 120 4.42
108 10.9 2792.09 154.1 0 0.0045 0
2.9 0.01
108 10.9 962.55 6 3.7 120 4.44
107 10.9 3754.63 154.1 0 0.0079 0
3.7 0.03
107 10.9 968.73 6 3.5 120 4.46
038 10.9 4723.37 154.1 0 0.012 0
3.5 0.04
038 10.9 890.64 6 5x(us.90)=21.336 60.093 120 4.51
043 5.5 5614.01 154.1 21.336 0.0166 0.53
81.429 1.35
043 5.5 0 6 1x(coupling)=0.383 1.09 120 6.39
044-O 4.41 5614.01 161.5 0.383 0.0132 0.11
1.473 0.02
044-O 4.41 0 6 0.305 0 6.51 AV-1 Check
044-I 4.105 5614.01 0 0 0.401 0.03 ***
0.305 0.12
044-I 4.105 0 6 1x(coupling)=0.383 0.038 120 6.66
045-O 4.067 5614.01 161.5 0.383 0.0132 0.00
0.421 0.01
045-O 4.067 0 6 0.267 0 6.67 Gate A2360
045-I 3.8 5614.01 0 0 0.0193 0.03 ***
0.267 0.01
045-I 3.8 0 6 1x(us.Tee-Br)=11.497 0.3 120 6.71
046 3.5 5614.01 161.5 11.497 0.0132 0.03
11.797 0.16
046 3.5 0 10 1x(us.Tee-Br)=15.24 32.475 120 6.89
053 1.7 5614.01 257.6 6x(us.90)=40.233 55.473 0.0014 0.18
87.948 0.12
053 1.7 -2598.72 10 2x(us.45)=6.706 578.89 120 7.19
056 1.7 3015.29 257.6 2x(us.90)=13.411 6 0.0004 0
20.117 0.26
599.01
3

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 20
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 1
056 1.7 4498.72 10 2x(us.90)=13.411 90.069 120 7.44
059 -1.3 7514.01 257.6 13.411 0.0023 0.29
103.48 0.24
059 -1.3 0 10 1x(us.90)=6.706 23.208 120 7.98
W1 -1.3 7514.01 257.6 6.706 0.0023 0
29.914 0.07
W1 8.05

Path No: 2
S16 11.5 161.4 198.74 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
129 11.2 198.74 26.6 1.524 0.1752 0.03
1.824 0.32
129 11.2 43.3 2.5 2.5 120 1.86
128 11.2 242.03 66.9 0 0.0028 0
2.5 0.01
128 11.2 199.13 2.5 1x(us.Tee-Br)=5.021 1.235 120 1.87
126 10.9 441.16 66.9 1x(us.90)=2.511 7.532 0.0086 0.03
8.767 0.08
126 10.9 -13.98 6 3.7 120 1.98
125 10.9 427.18 154.1 0 0.0001 0
3.7 0
125 10.9 445.44 6 1x(us.Tee-Br)=9.144 3.5 120 1.98
124 10.9 872.62 154.1 9.144 0.0005 0
12.644 0.01
124 10.9 0 2.5 1x(us.Tee-Br)=5.021 74.393 120 1.98
111 10.9 872.62 66.9 5.021 0.0306 0
79.414 2.43
111 10.9 0 6 3.5 120 4.41
110 10.9 872.62 154.1 0 0.0005 0
3.5 0.00
110 10.9 959.39 6 3.7 120 4.41
109 10.9 1832.01 154.1 0 0.0021 0
3.7 0.01
109 4.42

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 21
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 3
S24 11.5 161.4 198.76 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
220 11.2 198.76 26.6 1.524 0.1753 0.03
1.824 0.32
220 11.2 -41.14 2.5 2.5 120 1.86
219 11.2 157.62 66.9 0 0.0013 0
2.5 0.00
219 11.2 198.94 2.5 2.5 120 1.87
218 11.2 356.56 66.9 0 0.0058 0
2.5 0.01
218 11.2 199.74 2.5 2.5 120 1.88
217 11.2 556.3 66.9 0 0.0133 0
2.5 0.03
217 11.2 201.54 2.5 2.5 120 1.92
216 11.2 757.84 66.9 0 0.0236 0
2.5 0.06
216 11.2 204.71 2.5 1x(us.Tee-Br)=5.021 58.758 120 1.97
108 10.9 962.55 66.9 1x(us.90)=2.511 7.532 0.0367 0.03
66.29 2.43
108 4.44

Path No: 4
S23 11.5 161.4 198.78 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
221 11.2 198.78 26.6 1.524 0.1753 0.03
1.824 0.32
221 11.2 41.14 2.5 2.5 120 1.86
001 11.2 239.92 66.9 0 0.0028 0
2.5 0.01
001 11.2 199.16 2.5 1x(us.Tee-Br)=5.021 1.235 120 1.87
003 10.9 439.08 66.9 1x(us.90)=2.511 7.532 0.0086 0.03
8.767 0.08
003 10.9 13.98 6 3.7 120 1.98
004 10.9 453.06 154.1 0 0.0002 0
3.7 0
004 10.9 437.57 6 1x(us.Tee-Br)=9.144 3.5 120 1.98
005 10.9 890.64 154.1 9.144 0.0005 0
12.644 0.01
005 10.9 0 2.5 1x(us.Tee-Br)=5.021 74.393 120 1.98
038 10.9 890.64 66.9 5.021 0.0318 0
79.414 2.52
038 4.51

Path No: 5
S18 11.5 161.4 198.89 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
131 11.2 198.89 26.6 1.524 0.1755 0.03
1.824 0.32
131 1.87

Path No: 6
S25 11.5 161.4 198.94 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
219 11.2 198.94 26.6 1.524 0.1755 0.03
1.824 0.32
219 1.87

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 22
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 7
S15 11.5 161.4 199.13 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
128 11.2 199.13 26.6 1.524 0.1758 0.03
1.824 0.32
128 1.87

Path No: 8
S22 11.5 161.4 199.16 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
001 11.2 199.16 26.6 1.524 0.1759 0.03
1.824 0.32
001 1.87

Path No: 9
S10 11.4 161.4 199.24 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
162 11.1 199.24 26.6 1.524 0.176 0.03
1.824 0.32
162 11.1 -46.52 2.5 2.5 120 1.87
163 11.1 152.73 66.9 0 0.0012 0
2.5 0.00
163 11.1 199.41 2.5 2.5 120 1.88
164 11.1 352.14 66.9 0 0.0057 0
2.5 0.01
164 11.1 200.19 2.5 2.5 120 1.89
165 11.1 552.32 66.9 0 0.0131 0
2.5 0.03
165 11.1 201.97 2.5 2.5 120 1.92
166 11.1 754.29 66.9 0 0.0234 0
2.5 0.06
166 11.1 205.1 2.5 1x(us.Tee-Br)=5.021 58.658 120 1.98
110 10.9 959.39 66.9 1x(us.90)=2.511 7.532 0.0365 0.02
66.19 2.41
110 4.41

Path No: 10
S9 11.4 161.4 199.26 1 1x(us.Tee-Br)=1.524 0.3 120 1.52
161 11.1 199.26 26.6 1.524 0.1761 0.03
1.824 0.32
161 11.1 46.52 2.5 2.5 120 1.87
160 11.1 245.78 66.9 0 0.0029 0
2.5 0.01
160 11.1 199.66 2.5 1x(us.Tee-Br)=5.021 1.135 120 1.88
125 10.9 445.44 66.9 1x(us.90)=2.511 7.532 0.0088 0.02
8.667 0.08
125 1.98

Path No: 11
S11 11.4 161.4 199.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
163 11.1 199.41 26.6 1.524 0.1763 0.03
1.824 0.32
163 1.88

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 23
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION

Path No: 12
S3 11.4 161.4 199.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
252 11.1 199.41 26.6 1.524 0.1763 0.03
1.824 0.32
252 11.1 -38.35 2.5 2.5 120 1.88
251 11.1 161.07 66.9 0 0.0013 0
2.5 0.00
251 11.1 199.6 2.5 2.5 120 1.88
250 11.1 360.66 66.9 0 0.006 0
2.5 0.01
250 11.1 200.41 2.5 2.5 120 1.89
249 11.1 561.07 66.9 0 0.0135 0
2.5 0.03
249 11.1 202.24 2.5 2.5 120 1.93
248 11.1 763.3 66.9 0 0.0239 0
2.5 0.06
248 11.1 205.43 2.5 1x(us.Tee-Br)=5.021 58.658 120 1.99
107 10.9 968.73 66.9 1x(us.90)=2.511 7.532 0.0371 0.02
66.19 2.46
107 4.46

Path No: 13
S2 11.4 161.4 199.43 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
253 11.1 199.43 26.6 1.524 0.1763 0.03
1.824 0.32
253 11.1 38.35 2.5 2.5 120 1.88
002 11.1 237.77 66.9 0 0.0028 0
2.5 0.01
002 11.1 199.8 2.5 1x(us.Tee-Br)=5.021 1.135 120 1.88
004 10.9 437.57 66.9 1x(us.90)=2.511 7.532 0.0085 0.02
8.667 0.07
004 1.98

Path No: 14
S4 11.4 161.4 199.6 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
251 11.1 199.6 26.6 1.524 0.1766 0.03
1.824 0.32
251 1.88

Path No: 15
S8 11.4 161.4 199.66 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
160 11.1 199.66 26.6 1.524 0.1767 0.03
1.824 0.32
160 1.88

Path No: 16
S19 11.5 161.4 199.68 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
132 11.2 199.68 26.6 1.524 0.1768 0.03
1.824 0.32
132 1.88

Path No: 17
S26 11.5 161.4 199.74 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
218 11.2 199.74 26.6 1.524 0.1769 0.03
1.824 0.32
218 1.88

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 24
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION
Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt)
Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per m elev (Pe) NOTES
T frict (Pf)

(m) (lpm/bar½) (l/min) (mm) (m) (m) (bar) (bar)

Path No: 18
S1 11.4 161.4 199.8 1 1x(us.Tee-Br)=1.524 0.3 120 1.53
002 11.1 199.8 26.6 1.524 0.177 0.03
1.824 0.32
002 1.88

Path No: 19
S12 11.4 161.4 200.19 1 1x(us.Tee-Br)=1.524 0.3 120 1.54
164 11.1 200.19 26.6 1.524 0.1776 0.03
1.824 0.32
164 1.89

Path No: 20
S5 11.4 161.4 200.41 1 1x(us.Tee-Br)=1.524 0.3 120 1.54
250 11.1 200.41 26.6 1.524 0.178 0.03
1.824 0.32
250 1.89

Path No: 21
S20 11.5 161.4 201.47 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
133 11.2 201.47 26.6 1.524 0.1797 0.03
1.824 0.33
133 1.91

Path No: 22
S27 11.5 161.4 201.54 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
217 11.2 201.54 26.6 1.524 0.1798 0.03
1.824 0.33
217 1.92

Path No: 23
S13 11.4 161.4 201.97 1 1x(us.Tee-Br)=1.524 0.3 120 1.56
165 11.1 201.97 26.6 1.524 0.1805 0.03
1.824 0.33
165 1.92

Path No: 24
S6 11.4 161.4 202.24 1 1x(us.Tee-Br)=1.524 0.3 120 1.57
249 11.1 202.24 26.6 1.524 0.181 0.03
1.824 0.33
249 1.93

Path No: 25
S21 11.5 161.4 204.62 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
134 11.2 204.62 26.6 1.524 0.1849 0.03
1.824 0.34
134 1.97

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 25
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION

Path No: 26
S28 11.5 161.4 204.71 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
216 11.2 204.71 26.6 1.524 0.1851 0.03
1.824 0.34
216 1.97

Path No: 27
S14 11.4 161.4 205.1 1 1x(us.Tee-Br)=1.524 0.3 120 1.61
166 11.1 205.1 26.6 1.524 0.1857 0.03
1.824 0.34
166 1.98

Path No: 28
S7 11.4 161.4 205.43 1 1x(us.Tee-Br)=1.524 0.3 120 1.62
248 11.1 205.43 26.6 1.524 0.1863 0.03
1.824 0.34
248 1.99

Path No: 29
H1 1.7 1900 3 1x(us.Tee-Br)=6.145 2.348 120 6.82
054 1.7 1900 82.8 6.145 0.0458 0
8.492 0.39
054 1.7 2598.72 10 1x(us.Tee-Br)=15.24 241.85 120 7.21
056 1.7 4498.72 257.6 1x(us.90)=6.706 7 0.0009 0
21.946 0.24
263.80
3
056 7.44

Path No: 30
130 11.2 0 2.5 2.5 120 1.86
129 11.2 43.3 66.9 0 0.0001 0
2.5 0
129 1.86

Path No: 31
053 1.7 0 10 60 120 7.19
054 1.7 2598.72 257.6 0 0.0003 0
60 0.02
054 7.21

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 26
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION

Path No: 32
059 -1.3 0 10 1x(us.Tee-Br)=15.24 232.61 120 7.98
074 -1.3 1.9 257.6 7 0 0
15.24 0
247.85
7
074 -1.3 2.43 10 1x(us.Tee-Br)=15.24 105.40 120 7.98
073 -1.3 4.33 257.6 3 0 0
15.24 0
120.64
3
073 -1.3 0.79 10 226.39 120 7.98
072 -1.3 5.11 257.6 0 0 0
226.39 0
072 -1.3 2.99 10 8.796 120 7.98
071 -1.3 8.11 257.6 0 0 0
8.796 0
071 -1.3 -2.52 10 4x(us.90)=26.822 541.57 120 7.98
065 -1.3 5.58 257.6 1x(us.45)=3.353 9 0 0
1x(us.Tee-Br)=15.24 45.415 0
586.99
4
065 -1.3 -2.68 10 1x(us.Tee-Br)=15.24 1136.8 120 7.98
078 -1.3 2.9 257.6 4x(us.90)=26.822 21 0 0
42.062 0
1178.8
83
078 -1.3 2.52 10 2x(us.90)=13.411 472.83 120 7.98
075 -1.3 5.42 257.6 6 0 0
13.411 0
486.24
7
075 -1.3 -2.43 10 2x(us.Tee-Br)=30.48 101.37 120 7.98
072 -1.3 2.99 257.6 1 0 0
30.48 0
131.85
1
072 7.98

Path No: 33
126 10.9 0 6 2.9 120 1.98
003 10.9 13.98 154.1 0 0 0
2.9 0
003 1.98

Path No: 34
220 11.2 0 2.5 2.5 120 1.86
221 11.2 41.14 66.9 0 0.0001 0
2.5 0
221 1.86

Path No: 35
162 11.1 0 2.5 2.5 120 1.87
161 11.1 46.52 66.9 0 0.0001 0
2.5 0
161 1.87

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 27
Job : FAS Building7 Hydraulic Calculations

PIPE INFORMATION

Path No: 36
252 11.1 0 2.5 2.5 120 1.88
253 11.1 38.35 66.9 0 0.0001 0
2.5 0
253 1.88

Path No: 37
071 -1.3 0 10 341.03 120 7.98
078 -1.3 2.52 257.6 2 0 0
0 0
341.03
2
078 7.98

Path No: 38
065 -1.3 0 10 2x(elbow.22.5)=3.353 225.55 120 7.98
061 -1.3 2.68 257.6 1x(us.Tee-Br)=15.24 9 0 0
1x(us.90)=6.706 25.298 0
250.85
8
061 -1.3 -0.79 10 1x(us.Tee-Br)=15.24 106.30 120 7.98
059 -1.3 1.9 257.6 6 0 0
15.24 0
121.54
6
059 7.98

Path No: 39
075 -1.3 0 10 1x(us.Tee-Br)=15.24 227.98 120 7.98
074 -1.3 2.43 257.6 1 0 0
15.24 0
243.22
1
074 7.98

Path No: 40
061 -1.3 0 10 237.00 120 7.98
073 -1.3 0.79 257.6 6 0 0
0 0
237.00
6
073 7.98

* Pressures are balanced to a high degree of accuracy. Values may vary by 0.01 bar due to display rounding.

* Maximum Velocity of 6.14 m/s occurs in the following pipe(s): (248-S7)

*** Device pressure loss (gain in the case of pumps) is calculated from the device’s curve. If the device curve is printed with
this report, it will appear below. The length of the device as shown in the table above comes from the CAD drawing. The friction
loss per unit of length is calculated based upon the length and the curve-based loss/gain value. Internal ID and C Factor values
are irrelevant as the device is not represented as an addition to any pipe, but is an individual item whose loss/gain is based
solely on the curve data.

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 28
Job : FAS Building7 Device Graphs

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 29
Job : FAS Building7 Device Graphs

File: Building7.sprinkCAD_1_1_0838.sv$
Date 8/9/2014 Copyright © 2002-2012 Tyco Fire Protection Products Page 30