- Pending basin
installation
4
- Pending basin
installation
2
Leaking founded at
nearby toilet / corridor
back entrance due to
roof installation fault
Skim/plaster/paint Ceiling
chipped at plaster Installer
ceiling Team /
Painter
Team
5
11
12
Folding door /
partition –
Uncomplete work at
both side
Rough plaster at
above door frame
jams
STAIRCASE 1
No Picture Description PIC Remark
Need plaster touch Plaster
up Team
Termination between
plaster ceiling and
plaster at beam need
touch up
STAIRCASE 2
No Picture Description PIC Remark
Need plaster touch Plaster
up Team
10
STAIRCASE 3
No Picture Description PIC Remark
Pain need touch up Painter
EXTERNAL AREA
No Picture Description PIC Remark
Sump not alligned
at Staircase 3 area
Pending staircase
and wall painting
touch up
Apron surface
rough – Finishing to
make good
Pending louvers
installation
11
11
Ramp imprint to
make good
12
EXTERNAL AREA
No Picture Description PIC Remark
Fencing to be tighten
/ to make good