BILL OF QUANTITIES

NEW PICKET FENCING TO FISHERIES AND


MARINE RESOURCES AT KUKUM- HONIARA

MINISTRY OF FISHERIES AND MARINE RESOURCES

HONIARA

2017
OF FISHERIES AND MARINE RESOURCES
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
ABSTRACT

Item Description Quantity Unit Rate $

1 Amount of Preliminaries $6,900.00

2 Amount of Demolition $15,000.00

3 Amount of Excavation $8,500.00

4 Amount of Concrete Work $34,000.00

5 Amount of Reinforcement $0.00

6 Amount of Blockwork $0.00

7 Amount of Metal Work $0.00

8 Amount of Painting $0.00

Cost of Materials $57,500.00

Labour and Profit $24,725.00

Transportation $9,867.00

Amount of Preliminaries $6,900.00

WHT $7,424.40

AMOUNT OF TENDER $ $106,416.40


NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
PRELIMINARIES

Item Description Quantity Unit Rate $

1 The Tenderer shall observe that throughout


this Bill of Quantities, all items, with the
exception as noted, are measured net as fixed
in position and no allowance has been made
for waste

2 Unit rates are deemed to include all labour


and materials, cartage, cutting and waste,
hoisting, setting, fixing in position, return of
packagings, etc

3 The Tenderer, in all trades without exception,


is referred to the Specification for further
particulars of the methods and other
instructions not particularly described herein.

B The following are the abbreviations used in


this Bill of Quantities:-

mm millimetres
m metres
m2 square metres
m3 cubic metres
kg kilograms
no number

4 Dimesions are generally given in millimetres,


without the following mm

5 Allow to maintain the works in their entirety


for a period of 6 calender months Note

COLLECTION
Page 1/1
Page 1/2

Total Preliminaries carried to Abstract $


Preliminaries 1/3
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
DEMOLITION
Item Description of Work Quantity Unit Rate Amount

General :

1 The Tenderer is referred to the Specification


and Drawings for all conditions, contract
requirements, descriptions, etc., relating to this
Section, and is also referred to the Preliminaries
Section of this Bill. All of which will apply as if
herein written.

2 The Tenderer is referred to NZS 4202 : 1995


with particular reference to the General Rules
Section, for principles and details of
measurement of this Section.

3 Notwithstanding the reference in NZS 4202 to


'Schedule(s) Quantities', such reference shall be
deemed to mean also 'Bill(s) of Quantities' and
the phrase 'scheduled in the description' or
similar shall mean 'billed' or 'given in the
description' as appropriate.

Rates to Include :
In pricing this Section the rates shall include
for:-

4 Removing all demolished materials, rubbish


and debris, temporary shoring and the like

5 Temporary support of adjoining structures


or embankments.

6 Demolition and subsequent renewal of


adjoining structures as necessary

7 Cutting all reinforcing encountered


Demolition 2/2 $
Item Description of Work Quantity Unit Rate Amount

Screens, etc :

8 Allow to provide all screens and temporary


protection to all areas affected by the
demolition works, maintain and remove on
completion. Allow also to carry out work to
provide minium inconvenience to existing
building areas, etc.

Staging :

9 Allow to carry out work in stages as required or


specified to suit building sequence and
Employer's, adjoining Owner's and Local
Authority requirements and restrictions and
reduce noise, nuisance, etc., to an acceptable
minium.

10 Also make full allowance for normal Employer


operations which will continue during this
contract with all requirements for safety
measures, restricted work areas and time
frames, noise avoidance, vehicle movements
and the like.

Inspections or Reports :
11 Allow to carry out all inspections or reports on
the existing premises and/or on adjoining
properties to the site.

Permits etc :
12 Allow to give all notices, obtain permits and pay
all fees.

Demolition

13 Allow to remove old existing picket fencing


around the fisheries and marine resources
of approx- 210 perimeter and disposed as 1 item 15,000.00 15,000.00
directed.
Total Demolition carried to Abstract $ $15,000.00
Demolition 2/3
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
EXCAVATION

Item Description Quantity Unit Rate $

General:
1 The Tenderer is referred to the specification
and Drawings for all conditions, contract
requirements, descriptions, etc., relating to
this section, and is also referred to the
Preliminaries Section of this Bill. All of which
will apply as if herein written.

2 The Tenderer is referred to NZS 4202: 1986


with particular reference to the General
Rules Section, for principles and details of
measurement of this Section.

3 Notwithstanding the reference in NZS 4202


to 'Schedule(s) Quantities', such reference
shall be deemed to mean also 'Bill(s) of
Quantities' and the phrase 'scheduled in the
description' or similar shall mean 'billed' or
'given in the description' as appropriate.

Rates to Include:
In pricing this Section the rates shall include
for:-

4 Bulking of excavated materials

5 Consolidation of fill

6 Excavation in any material encountered,


other than solid rock

7 Planking, strutting and shoring as


necessary to excavations not exceeding
1.5 metres in depth

8 Trimming sides and forming batters

9 Levelling off, consolidating bottoms and


any staging required

10 Multiple handling if required

Excavation 3/1 $
Item Description Quantity Unit Rate $

Working Space:

11 Measurement allowances are basically in


accordance with Section 3 of NZS 4202:
1986. Should the Tenderer consider such
allowance inadequate he shall include for
any additional deemed necessary in his
rates.

Pumping etc:

12 Allow to perform all pumping and bailing as


required to keep all excavations free from
water. (See also Preliminaries Section of this
Bill)

Existing Services:

13 Allow to protect and maintain all existing


drains, water and gas services, electrical and
telephone mains which pass through the
site. Allow for any re-routing of same,
provision of temporary services and ensure
continuity of supplies at all times.

Excavation

14 Excavate 400mm strip footing, 0-0.450m


deep, commencing from ground level. 14.0 m3 $500.00 $7,000.00

Excavation 3/2 $
Item Description Quantity Unit Rate $

15 Excavate 350 x 350 post footing 0-0.500m


deep, commencing from ground level. 3.0 m3 $500.00 $1,500.00

COLLECTION

Page 3/1
Page 3/2

Total Excavation carried to Abstract $ $8,500.00


Excavation 3/3
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
CONCRETE WORK
Item Description Quantity Unit Rate $

General:
1 The Tenderer is referred to the specification
and Drawings for all conditions, contract
requirements, descriptions, etc., relating to
this section, and is also referred to the
Preliminaries Section of this Bill. All of which
will apply as if herein written.

2 The Tenderer is referred to NZS 4202: 1986


with particular reference to the General Rules
Section, for principles and details of
measurement of this Section.

3 Notwithstanding the reference in NZS 4202 to


'Schedule(s) Quantities', such reference shall
be deemed to mean also 'Bill(s) of Quantities'
and the phrase 'scheduled in the description'
or similar shall mean 'billed' or 'given in the
description' as appropriate.

Rates to Include:
In pricing this Section the rates shall include
for:-

4 Formwork waling battens, struts, bolts,


ties etc., fillets less than 50 on face for
easing, striking and removal

5 Forwork finish of at least F1 (NZS 3114)

6 Vibrating where required

7 Screeding all slabs, pads, footings, and


finish off tops of all exposed walls, beams
and the like

8 Forming stopwork pour joints

9 Curing concrete generally


Concrete Work 6/1 $
Item Description Quantity Unit Rate $

10 Hand finishing areas inaccessible to power


float

Attendance, etc.

11 Allow to confer with other sections and


properly build in or assist to build in all
structural and reinforcing steel anchors, bolts,
sleeves and fixings of all descriptions, so as to
avoid all hacking and plugging after
completion

12 In the following sections except for sundry


requirements not detailed, items as generally
mentioned above have been enumerated as
encountered and described as "Built into
Concrete".

Tests :

13 Allow to supply all equipment, labour and


material for the carrying out of all tests as Note
specified

FOOTING
20 mpa strength concrete as specified in:

14 400mm wide x 600 deep strip footing 13.5 m3 $1,700.00 $22,950.00

15 350 x 350 x 500 deep post footing 3.0 m3 $1,700.00 $5,100.00

Columns
25 mpa strength concrete as specified in:

16 300x200 fencing columns to front 3.5 m3 $1,700.00 $5,950.00

COLLECTION
page 6/1
page 6/2
Total Concrete Work carried to Abstract $ $34,000.00
Concrete Work 6/2
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
REINFORCING STEEL
Item Description Quantity Unit Rate $

A General:
1 The Tenderer is referred to the specification and
Drawings for all conditions, contract
requirements, descriptions, etc., relating to this
section, and is also referred to the Preliminaries
Section of this Bill. All of which will apply as if
herein written.

2 The Tenderer is referred to NZS 4202: 1986 with


particular reference to the General Rules Section,
for principles and details of measurement of this
Section.

3 Notwithstanding the reference in NZS 4202 to


'Schedule(s) Quantities', such reference shall be
deemed to mean also 'Bill(s) of Quantities' and the
phrase 'scheduled in the description' or similar
shall mean 'billed' or 'given in the description' as
appropriate.

B Rates to Include:
In pricing this Section the rates shall include for:-

4 Bending and cranking bars as required

5 Hoisting and placing into position including


maintaining whilst concrete is being poured

6 Materials and labours requiring for securing


the reinforcing including chairs, tie wire,
spacers and the like

7 Supporting bars required but not shown

8 Rolling margins

9 Laps in fabric reinforcement


Reinforcement 3/1 $
Item Description Quantity Unit Rate $

Strip Footing
10 D12 bars. m

11 R6 ties m

Column
12 D12 hori bars m

13 R6 stirrups. m

14 Tiewire kg

Collection

Page
Page

Total of Reinforcement carried to Abstract


Reinforcement 3/2 $ $0.00
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
BLOCKWORK
Item Description Quantity Unit Rate $

General:
1 The Tenderer is referred to the specification
and Drawings for all conditions, contract
requirements, descriptions, etc., relating to
this section, and is also referred to the
Preliminaries Section of this Bill. All of which
will apply as if herein written.

2 The Tenderer is referred to NZS 4202: 1986


with particular reference to the General Rules
Section, for principles and details of
measurement of this Section.

3 Notwithstanding the reference in NZS 4202 to


'Schedule(s) Quantities', such reference shall
be deemed to mean also 'Bill(s) of Quantities'
and the phrase 'scheduled in the description'
or similar shall mean 'billed' or 'given in the
description' as appropriate.

Rates to Include:
B In pricing this Section the rates shall include
for:-

4 Use of frictional size bricks for bonding


purposes

5 Vertical straight cutting

6 Horizontal raking cutting

7 Protection from weather and staining

8 Cleaning down on completion

Preambles
9 Refer to preamble clauses of all other relevant
Sections which shall as of here in written

Reinforced Masonry 4/1 $


Item Description Quantity Unit Rate $

SUBSTRUCTURE

10 200mm thick reinforced blockwork below


ground level m2

11 Fill in all cells of 200mm thick blockwork wall


with 20Mpa concrete m3

SUPERSTRUCTURE

12 200mm thick reinforced blockwork with


plastered finish m2

13 Fill in all cells of 200mm thick blockwork wall


with 20Mpa concrete m3

14 D12 vertical bars m

15 D12 horizontal bars m

COLLECTION
page 4/1

Page
Total of Reinforced Masonry carried to
Abstract $ $0.00
Reinforced Masonry 4/2 $
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
METAL WORK

Item Description Quantity Unit Rate $

General:
1 The Tenderer is referred to the specification
and Drawings for all conditions, contract
requirements, descriptions, etc., relating to
this section, and is also referred to the
Preliminaries Section of this Bill. All of which
will apply as if herein written.

2 The Tenderer is referred to NZS 4202: 1986


with particular reference to the General Rules
Section, for principles and details of
measurement of this Section.

3 Notwithstanding the reference in NZS 4202 to


'Schedule(s) Quantities', such reference shall
be deemed to mean also 'Bill(s) of Quantities'
and the phrase 'scheduled in the description'
or similar shall mean 'billed' or 'given in the
description' as appropriate.

Rates to Include:
B In pricing this Section the rates shall include
for:-

4 Rolling Margin

5 Supply, fabrication and delivery

6 Hoisting and erection

7 Temporary bracing, supports, erection


cleats, and the like

8 Cutting plates etc, to shape

9 Welding preparation, backing plates, and


the like

10 Nuts, washers, tampered washers,


templates and the like to all screws &
bolts
Metal Work 15/1 $
Item Description Quantity Unit Rate $

PICKET FENCING

11 75 x 75 galv square tube posts to fencing. M

12 50 x 30 galv square tube. M

13 25 x 25 galv square tube. M

Sliding Gate
14 100x50 galv square tubes to gates M

15 50x50 galv square tubes to gates M

16 Allow for sliding irons and rollers to new gate


item

17 Allow for metal decorations to picket fencing


tops item

COLLECTION

page 15/1
page 15/2

Total of Metal Work carried to Abstract $0.00


Metal Work 15/2
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
PAINTING

Item Description Quantity Unit Rate $

General:
1 The Tenderer is referred to the specification and
Drawings for all conditions, contract
requirements, descriptions, etc., relating to this
section, and is also referred to the Preliminaries
Section of this Bill. All of which will apply as if
herein written.

2 The Tenderer is referred to NZS 4202: 1986 with


particular reference to the General Rules Section,
for principles and details of measurement of this
Section.

3 Notwithstanding the reference in NZS 4202 to


'Schedule(s) Quantities', such reference shall be
deemed to mean also 'Bill(s) of Quantities' and the
phrase 'scheduled in the description' or similar
shall mean 'billed' or 'given in the description' as
appropriate.

Rates to Include:
In pricing this Section the rates shall include for:-

4 All preparatory work, including sanding


between coats

5 Cutting - in

6 Masking

Removal of Hardware, etc :

7 Allow to remove all window, door and fittin prior


to painting or vanishing and securely replace.
Remove all electrical fittings, etc., prior to
commencement of painting and replace on
completion
Painting 35/1 $
Item Description Quantity Unit Rate $

Protection :

8 Allow to protect and cover all other surfaces and


finishes adjoining the area of operations and fully
clean down same on completion. Any damage or
disfigurement caused to the work of this or other
Sections shall be made good at no cost to the
Employer

GROUND FLOOR
PAINTING
External
Apply one coat etch primer and two coats full
gloss on

9 100 x 50 galv square tubes M

10 75 x 75 galv square tubes M

11 50 x 30 galv square tubes M

12 25 x 25 galv square tubes M

13 Allow for re-paint of existing concrete wall m2

COLLECTION

page 35/1
page 35/2

Total Painting carried to Abstract $0.00


Painting 35/2