HONIARA
2017
OF FISHERIES AND MARINE RESOURCES
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
ABSTRACT
Transportation $9,867.00
WHT $7,424.40
mm millimetres
m metres
m2 square metres
m3 cubic metres
kg kilograms
no number
COLLECTION
Page 1/1
Page 1/2
General :
Rates to Include :
In pricing this Section the rates shall include
for:-
Screens, etc :
Staging :
Inspections or Reports :
11 Allow to carry out all inspections or reports on
the existing premises and/or on adjoining
properties to the site.
Permits etc :
12 Allow to give all notices, obtain permits and pay
all fees.
Demolition
General:
1 The Tenderer is referred to the specification
and Drawings for all conditions, contract
requirements, descriptions, etc., relating to
this section, and is also referred to the
Preliminaries Section of this Bill. All of which
will apply as if herein written.
Rates to Include:
In pricing this Section the rates shall include
for:-
5 Consolidation of fill
Excavation 3/1 $
Item Description Quantity Unit Rate $
Working Space:
Pumping etc:
Existing Services:
Excavation
Excavation 3/2 $
Item Description Quantity Unit Rate $
COLLECTION
Page 3/1
Page 3/2
General:
1 The Tenderer is referred to the specification
and Drawings for all conditions, contract
requirements, descriptions, etc., relating to
this section, and is also referred to the
Preliminaries Section of this Bill. All of which
will apply as if herein written.
Rates to Include:
In pricing this Section the rates shall include
for:-
Attendance, etc.
Tests :
FOOTING
20 mpa strength concrete as specified in:
Columns
25 mpa strength concrete as specified in:
COLLECTION
page 6/1
page 6/2
Total Concrete Work carried to Abstract $ $34,000.00
Concrete Work 6/2
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
REINFORCING STEEL
Item Description Quantity Unit Rate $
A General:
1 The Tenderer is referred to the specification and
Drawings for all conditions, contract
requirements, descriptions, etc., relating to this
section, and is also referred to the Preliminaries
Section of this Bill. All of which will apply as if
herein written.
B Rates to Include:
In pricing this Section the rates shall include for:-
8 Rolling margins
Strip Footing
10 D12 bars. m
11 R6 ties m
Column
12 D12 hori bars m
13 R6 stirrups. m
14 Tiewire kg
Collection
Page
Page
General:
1 The Tenderer is referred to the specification
and Drawings for all conditions, contract
requirements, descriptions, etc., relating to
this section, and is also referred to the
Preliminaries Section of this Bill. All of which
will apply as if herein written.
Rates to Include:
B In pricing this Section the rates shall include
for:-
Preambles
9 Refer to preamble clauses of all other relevant
Sections which shall as of here in written
SUBSTRUCTURE
SUPERSTRUCTURE
COLLECTION
page 4/1
Page
Total of Reinforced Masonry carried to
Abstract $ $0.00
Reinforced Masonry 4/2 $
NEW PICKET FENCING TO FISHERIES AND MARINE RESOURCES AT KUKUM- HONIARA
MINISTRY OF FISHERIES AND MARINE RESOURCES
METAL WORK
General:
1 The Tenderer is referred to the specification
and Drawings for all conditions, contract
requirements, descriptions, etc., relating to
this section, and is also referred to the
Preliminaries Section of this Bill. All of which
will apply as if herein written.
Rates to Include:
B In pricing this Section the rates shall include
for:-
4 Rolling Margin
PICKET FENCING
Sliding Gate
14 100x50 galv square tubes to gates M
COLLECTION
page 15/1
page 15/2
General:
1 The Tenderer is referred to the specification and
Drawings for all conditions, contract
requirements, descriptions, etc., relating to this
section, and is also referred to the Preliminaries
Section of this Bill. All of which will apply as if
herein written.
Rates to Include:
In pricing this Section the rates shall include for:-
5 Cutting - in
6 Masking
Protection :
GROUND FLOOR
PAINTING
External
Apply one coat etch primer and two coats full
gloss on
COLLECTION
page 35/1
page 35/2