You are on page 1of 1

Amps 230-XFR-002/2 (Nom. kV=4.16, Plot Ref. kV=4.

16)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K
230SUB001B2
Ampacity
500 294MCC001P1/P2/P3 294 - MCC - 001 500
Ampacity
300 300
OL20 - OL
294-FAN-005M-100% Allen Bradley
193-EA
Class 20 (Hot)
100 Cable11 - P Pickup = 85 (26 - 85
100Primary)

CB7
Allen Bradley
50 50
140U-K6
Size = 150 Amps
CB6
30 Thermal Trip = Fixed 30
Magnetic Trip = 10 General Electric Spectra RMS SK
Frame = 500 Plug = 500 Amps
LT Pickup = Fixed (500 Amps)
Fuse7 LT Band = Fixed
10 Cutler-Hammer ST Pickup = Fixed (1506 Amps) 10
RDB-400 (77) ST Band = Fixed (I^x)t = IN
Time Lag 15.5 kV Inst. Pickup = 3 (2410 Amps)
5 40E 5

Seconds
Seconds

3 3
230SUB001B2 - P
CB14
ABB
S 700-K (16-50A)
Size = 20 Amps
1 1
Thermal Trip = Fixed
Magnetic Trip = Fixed
294MCC001P1/P2/P3 - P
.5 .5

.3 .3
Cable11
Ampacity
230-SUB-001B
294 - MCC - 001 - Source PD Ia
.1 .1
230-SUB-001B
Inrush
.05 .05
49 OL20
CB14 - 3P
230SUB001B2

CB7 - 3P
1-3/C 500

Fuse7

.03 .03
230-SUB-001B
2.5 MVA

230 - SUB - 001

CB6

294MCC001P1/P2/P3
1-3/C 500
CB7

294 - MCC - 001

CB14
OL3

.01 .01
294-FAN-005M
7.5 HP

.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps 230-XFR-002/2 (Nom. kV=4.16, Plot Ref. kV=4.16) ETAP Star 16.0.0C

Vargas G. Ana&Jove C. Bori Coordinacion 294-FAN-005M TECSUP

Project: Date: 08-13-2020


Location: SN: 4359168
Contract: Rev: Base
Engineer: Fault: Phase
Filename: C:\ETAP 1600\UNIFILAR_01\UNIFILAR_01.OTI