kV=11)
CT Ratio 200:1
±
100 OC1 100 CT4
R
IEC Normal Inverse 200/1
Pickup = 0.45 Time Dial = 0.9
the Arc Energy curve crosses Inst = 1.4 Time Delay = 1.1 s R R-11kV SS-2 SWBD B/C-1
50 50
the Source PD curve at low fault OC2
1-3/C 240
unrequired to show, so whether R-440V SS-2 SWBD I/C-1 - P
OC1
energy curve clipping is
ABB REF 615 - Copy
possible? 10 CT Ratio 2000:1 10
IEC Extremely Inverse
Pickup = 1.04 Time Dial = 0.15
R-440V SS-2 SWBD BC - P Inst = 2.37 Time Delay = 0.9 s ESPSS2-TR-01
5 OC1 5
11/0.457 kV
Seconds
Seconds
CT6
±
R-51G-440V-I/C-1-SS-2
R-440V OG TO SS-2 HVAC DB - P R
1 0.2 s 1 2000/1
6-4/C 300
.5 IEC Extremely Inverse .5
Pickup = 0.51 Time Dial = 1 890.4 A, 0.9 s
Inst = 2.3 Time Delay = 0.5 s
.3 890.4 A, 0.7 s .3
890.4 A, 0.5 s
17079 A, 0.45 s
We consider that the operator 0.4 s
CT3
±
possible.
.03 .03
ESPSS2-440VSWBD-01-BUS-A ESPSS2-440VSWBD-01-BUS-B
R-440V SS-2 SWBDESPSS2-440VSWBD-01-BUS-A
I/C-1 - 3P - Source PD Ia
R-11kV O/G TO SS2 TRF-1 - 3P
R-440V SS-2 SWBD BC - 3P R-11kV SS-2 SWBD B/C-1 - 3P CB84
R-440V OG TO SS-2 HVAC DB - 3P
.01 .01 CT2
Cable70
R R-440V SS-2 SWBD BC
2-4/C 300
Project: CONSTRUCT OF ESP AREA SS-1,2&3 Date: 27-09-2020
Location: SOUTH & EAST KUWAIT AREA SN: GULF-SPIC1
Contract: 19053812 Rev: Base
Engineer: GOKULNATH Fault: Phase
Filename: \\193.1.1.173\rfp-2037664\ELECTRICAL\3.ESP AREA-SS2\Documents\Calculations HVAC MCC SUPPLY-2
293.1 kVA