You are on page 1of 1

Amps X 10 ESPSS2-11kVSWBD-01- BUS-B (Nom. kV=11, Plot Ref.

kV=11)

.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K


1K 1K
R-11kV SS-2 SWBD B/C-1 - P
OC1
500 ABB REF 615 - Copy 500
CT Ratio 1250:1
IEC Normal Inverse ESPSS2-11kVSWBD-01- BUS-A
300 Pickup = 0.47 Time Dial = 0.3 300 ESPSS2-11kVSWBD-01- BUS-B
Inst = 2 Time Delay = 0.45 s
CB91 CT5
R-11kV O/G TO SS2 TRF-1 - P
1250/1 CB49

R-11kV O/G TO SS2 TRF-1


ABB REF 615 - Copy ±

CT Ratio 200:1
±
100 OC1 100 CT4
R
IEC Normal Inverse 200/1
Pickup = 0.45 Time Dial = 0.9
the Arc Energy curve crosses Inst = 1.4 Time Delay = 1.1 s R R-11kV SS-2 SWBD B/C-1
50 50
the Source PD curve at low fault OC2

AUX TRFO-1 FDR CABLE


Group 1
current at operating
30
time more Inst = 6.2 (0.05 - 40 xCT Sec) 30
than 6 seconds, which is Time Delay = 0.05 s

1-3/C 240
unrequired to show, so whether R-440V SS-2 SWBD I/C-1 - P
OC1
energy curve clipping is
ABB REF 615 - Copy
possible? 10 CT Ratio 2000:1 10
IEC Extremely Inverse
Pickup = 1.04 Time Dial = 0.15
R-440V SS-2 SWBD BC - P Inst = 2.37 Time Delay = 0.9 s ESPSS2-TR-01
5 OC1 5
11/0.457 kV

Seconds
Seconds

ABB REF 615 - Copy


CT Ratio 2000:1 1.25 MVA
3 20 cal/cm² 3
IEC Extremely Inverse
PPE Level = Level 3 6.25 %Z
Pickup = 0.73 Time Dial = 0.25
Inst = 1.66 Time Delay = 0.7 s Dyn11

CT6
±

R-51G-440V-I/C-1-SS-2
R-440V OG TO SS-2 HVAC DB - P R
1 0.2 s 1 2000/1

440V SWBD I/C-1 CABLE


OC1
ABB REF 615 - Copy
0.2 s
CT Ratio 1000:1 0.2 s ESPSS2-TR-01

6-4/C 300
.5 IEC Extremely Inverse .5
Pickup = 0.51 Time Dial = 1 890.4 A, 0.9 s
Inst = 2.3 Time Delay = 0.5 s
.3 890.4 A, 0.7 s .3

890.4 A, 0.5 s
17079 A, 0.45 s
We consider that the operator 0.4 s
CT3
±

ESPSS2-TR-01 R R-440V SS-2 SWBD I/C-1


escapes from.1arcing fault after Inrush 17079 A, 0.05 s .1
2000/1
2 sec. so we need this curve
to be plotted upto 2 seconds CB66
only. whether.05clipping is .05

possible.
.03 .03

ESPSS2-440VSWBD-01-BUS-A ESPSS2-440VSWBD-01-BUS-B
R-440V SS-2 SWBDESPSS2-440VSWBD-01-BUS-A
I/C-1 - 3P - Source PD Ia
R-11kV O/G TO SS2 TRF-1 - 3P
R-440V SS-2 SWBD BC - 3P R-11kV SS-2 SWBD B/C-1 - 3P CB84
R-440V OG TO SS-2 HVAC DB - 3P
.01 .01 CT2

R-440V OG TO SS-2 HVAC DB


.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K 2000/1 CB68 ±
±
CT1 R
Amps X 10 ESPSS2-11kVSWBD-01- BUS-B (Nom. kV=11, Plot Ref. kV=11) 1000/1
ETAP Star 20.0.0C

Cable70
R R-440V SS-2 SWBD BC
2-4/C 300
Project: CONSTRUCT OF ESP AREA SS-1,2&3 Date: 27-09-2020
Location: SOUTH & EAST KUWAIT AREA SN: GULF-SPIC1
Contract: 19053812 Rev: Base
Engineer: GOKULNATH Fault: Phase
Filename: \\193.1.1.173\rfp-2037664\ELECTRICAL\3.ESP AREA-SS2\Documents\Calculations HVAC MCC SUPPLY-2
293.1 kVA