You are on page 1of 1

Amps 230-XFR-002/2 (Nom. kV=4.16, Plot Ref. kV=4.

16)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 630-ACO-004-PDP-100% 230SUB001B2
1K

Ampacity
500 294MCC001P1/P2/P3 294 - MCC - 001 500
Ampacity
300 CB7 300
Allen Bradley
630-ACO-004-PDP 140U-K6
Size = 150 Amps
Thermal Trip = Fixed
100 Magnetic Trip = 10 100

Fuse7 230-SUB-001B
50 50
Cutler-Hammer
RDB-400 (77)
30 Time Lag 15.5 kV 30
40E
OL20 - OL
CB24 Allen Bradley
General Electric Power+ (MCCB) 193-EA
10 10
Sensor = 150 Plug = 0.5X Class 20 (Hot)
LT Pickup = Fixed (75 Amps) Pickup = 85 (26 - 85 Primary)
LT Band = 1
5 ST Pickup = 2 (150 Amps) 5

Seconds
Seconds

ST Band = Min (1) (I^x)t = OUT


3 Inst. Pickup = 1.5 (225 Amps) 230SUB001B2 - P 3
Override = 2250 Amps

630-ACO-004-PDP-Hot
1 CB6 1
General Electric Spectra RMS SK
Frame = 500 Plug = 500 Amps 294MCC001P1/P2/P3 - P
.5 LT Pickup = Fixed (500 Amps) .5
LT Band = Fixed Cable3 - P
ST Pickup = Fixed (1506 Amps)
.3 .3
ST Band = Fixed (I^x)t = IN Cable3
Inst. Pickup = 3 (2410 Amps) Ampacity

294 - MCC - 001 - Source PD Ia


.1 .1
230-SUB-001B
Inrush
.05 .05
49 OL20
CB24 - 3P
230SUB001B2

CB7 - 3P
1-3/C 500

Fuse7

.03 .03
230-SUB-001B
2.5 MVA

230 - SUB - 001

CB6

294MCC001P1/P2/P3
1-3/C 500
CB7

294 - MCC - 001

CB24
OL9

.01 .01
630-ACO-004-PDP

.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K


40 HP

Amps 230-XFR-002/2 (Nom. kV=4.16, Plot Ref. kV=4.16) ETAP Star 16.0.0C

Vargas G. Ana&Jove C.Boris Coordinacion 630-ACO-004- TECSUP

Project: Date: 08-13-2020


Location: SN: 4359168
Contract: Rev: Base
Engineer: Fault: Phase
Filename: C:\ETAP 1600\UNIFILAR_01\UNIFILAR_01.OTI

You might also like