INSPECTION AND TEST PLAN

Project: LMNHP -EW II (WB-4


Client: National Highways Authority of India
Engineer: RI & CEG JV.
Contractor: Hindustan Construction Co. Ltd.

ACTIVITY: ITP For Inspection of Embankment with Pond Ash


Inspec.Category
Frequency of
S.No. Inspection and Testing Description Controlling Specification. Verifying Document Remarks
Inspec./Testing HCC Engineer

MORT&H
Identification of Sources for Embankment
1 Clause-117, 118, As per test plan As per test plan H R
Materials, Selection, Testing and getting approval
Section- 900, 1000

Submission of Methodology and Sequence of MORT&H Relevant Segment Quality


2 Before start of Activity H R
Construction Clause-115 Plan

Survey,Setting Out and Control of Alignment Before start of Activity and


3 MORT&H Cl.109 As per survey records W S
Works etc. later as and when required

Deployment and Setting-Up of Plant /


Approved Construction
Equipment / Machinery and Manpower at
4 progranmme / Resources NA NA NA NA
appropriate Locations / Spreads for start of
Deployment Schedules
Earthwork Activity

MORT&H Before start of activity at New


5 Site Clearance NA W R
Section- 200 Location

Relevant Construction
6 Checking of finished levels As per survey records Top layer W R
Drawing

LEGEND: W: Witness; H: Hold Point; S: Surviellance Inspection; R: Review of Reports; MORT&H: Ministry of Road Transport & Highways

Format No: HCC T 40 17 03, Rev No: 00, Rev Date: 28.08.06