You are on page 1of 1

Performance Criteria Checklist 2.

1-3
Trainee’s Name: Date:

During the performance of the task, did you consider the following criteria?

Grade Point
Equivalent NO
CRITERIA YES Highest Possible
Score = 5
Lowest Possible
score = 0

Did the trainee…


1. Created a straight through cable
(T568A) according to the given
task?
2. Created a straight through cable
(T568B) according to the given
task?
3. Configured crossover cable
according to the given task?
4. Used tools and equipment
carefully?
5. Planned prepared required tools
materials and equipment
according to job requirements?
6. Performed and followed
completely the given tasks?
7. Observed and performed 5S and
occupational health and safety?

Feedback

Name and Signature of Trainer

You might also like