This report is checking about the curtain wall system at podium. It is composed of 19mm thk. tempered glass
panel, 100 x 100 x 5mm thk. GMR SHS transom, 150 x 100 x 12.5mm thk. GMS RHS mullion and cast-in
embed.
Generally, wind load is acting on the glass panel first. Then the load is transferred to the GMS transom /
mullion by 2sides structural sealant and 2sides pressure plate. After that, the wind load and dead load from the
GMS transom is to be transferred to the GMS mullion by 60x60x8 mm thk. GMS fixing braket with 6nos. M8
bolts. Finally, all the loads are transferred to the RC structure by passing through GMS cast-in embed.
Project: Tai Wai Station Property Development
WAH 華東幕牆工程有限公司 in STTL No. 520
Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page:
TABLE OF CONTENTS
1.0 DESIGN CRITERIA ------------------------------------------------------------------------------------------- 1
4.5 COMPUTER ANALYSIS OF 100 X 100 X 5mm THK. GMS SHS --------------------------- 33
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
APPENDIX E
APPENDIX F
Project: Tai Wai Station Property Development
WAH 華東幕牆工程有限公司 in STTL No. 520
Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page:
APPENDIX G
APPENDIX H
APPENDIX I
Project: Tai Wai Station Property Development
WAH 華東幕牆工程有限公司 in STTL No. 520
Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page: 1
1. LOADING DATA
Case 1: Line load to be applied at a height of 1.1m above the floor leve = 3.0kN/m
Case 2: Uniformly distributed load to be applied on the infill between floor and top rail = 1.5kPa
Case 3: Concentrated load to be applied on any part of the infill between floor and top rail = 1.5kN
2. MATERIAL
2.1 Mild Steel (Gr. S275) (H.K.Steel Code. - 2011, table 3.9)