Project: Tai Wai Station Property Development

WAH 華東幕牆工程有限公司 in STTL No. 520


Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page:

Design scope
This report is checking about the curtain wall system at podium. It is composed of 19mm thk. tempered glass
panel, 100 x 100 x 5mm thk. GMR SHS transom, 150 x 100 x 12.5mm thk. GMS RHS mullion and cast-in
embed.

Generally, wind load is acting on the glass panel first. Then the load is transferred to the GMS transom /
mullion by 2sides structural sealant and 2sides pressure plate. After that, the wind load and dead load from the
GMS transom is to be transferred to the GMS mullion by 60x60x8 mm thk. GMS fixing braket with 6nos. M8
bolts. Finally, all the loads are transferred to the RC structure by passing through GMS cast-in embed.
Project: Tai Wai Station Property Development
WAH 華東幕牆工程有限公司 in STTL No. 520
Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page:

TABLE OF CONTENTS
1.0 DESIGN CRITERIA ------------------------------------------------------------------------------------------- 1

2.0 GLASS PANEL DESIGN ------------------------------------------------------------------------------------- 4

2.1 CHECK FOR 19mm THK. TEMPERED GLASS PANEL -------------------------------------- 4

3.0 CHECK FOR STRUCTURAL SEALANT ----------------------------------------------------------------- 16

4.0 TRANSOM DESIGN ------------------------------------------------------------------------------------------ 17

4.1 CHECK FOR 100X100X5mm THK. GMS SHS TRANSOM ----------------------------------- 17

4.2 CHECK FOR 100X100X5mm THK. GMS SHS TRANSOM ----------------------------------- 21

4.3 CHECK FOR 100X100X5mm THK. GMS SHS TRANSOM ----------------------------------- 25

4.4 CHECK FOR 100X100X5mm THK. GMS SHS TRANSOM ----------------------------------- 29

4.5 COMPUTER ANALYSIS OF 100 X 100 X 5mm THK. GMS SHS --------------------------- 33

4.6 CHECK FOR 100X100X5mm THK. GMS SHS TRANSOM ----------------------------------- 39

5.0 MULLION DESIGN ------------------------------------------------------------------------------------------- 43

5.1 COMPUTER ANALYSIS OF 150X100X12.5mm THK. GMS RHS (CW01)----------------- 43

5.2 CHECK FOR 150X100X12.5mm THK. GMS RHS ---------------------------------------------- 48

5.3 COMPUTER ANALYSIS OF 150X100X12.5mm THK. GMS RHS (CW02)----------------- 51

5.4 CHECK FOR 150X100X12.5mm THK. GMS RHS ---------------------------------------------- 56

5.5 COMPUTER ANALYSIS OF 150X100X12.5mm THK. GMS RHS (CW03)----------------- 59

5.6 CHECK FOR 150X100X12.5mm THK. GMS RHS ---------------------------------------------- 65

5.7 COMPUTER ANALYSIS OF 150X100X12.5mm THK. GMS RHS (CW03)----------------- 68

5.8 CHECK FOR 150X100X12.5mm THK. GMS RHS ---------------------------------------------- 74

5.9 CHECK FOR 150X100X12.5mm THK. GMS RHS ---------------------------------------------- 77


Project: Tai Wai Station Property Development
WAH 華東幕牆工程有限公司 in STTL No. 520
Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page:

5.10 COMPUTER ANALYSIS OF STEEL CHANNEL ----------------------------------------------- 81

5.11 CHECK FOR 30X50X5mm THK. GMS CHANNEL -------------------------------------------- 85

6.0 CONNECTION DESIGN ------------------------------------------------------------------------------------- 89

6.1 CHECK FOR CONNECTION 1---------------------------------------------------------------------- 89

6.2 CHECK FOR CONNECTION 2---------------------------------------------------------------------- 95

6.3 CHECK FOR CONNECTION 3---------------------------------------------------------------------- 101

6.4 CHECK FOR CONNECTION 4---------------------------------------------------------------------- 104

6.5 CHECK FOR CONNECTION 5---------------------------------------------------------------------- 109

6.6 CHECK FOR CONNECTION 6---------------------------------------------------------------------- 115

6.7 CHECK FOR CONNECTION 7---------------------------------------------------------------------- 121

6.8 CHECK FOR CONNECTION 8---------------------------------------------------------------------- 125

6.9 CHECK FOR CONNECTION 9---------------------------------------------------------------------- 128

6.10 CHECK FOR CONNECTION 10--------------------------------------------------------------------- 132

6.11 CHECK FOR CONNECTION 11--------------------------------------------------------------------- 136

6.12 CHECK FOR CONNECTION 12--------------------------------------------------------------------- 139

6.13 CHECK FOR CONNECTION 13--------------------------------------------------------------------- 143

6.14 CHECK FOR CONNECTION 14--------------------------------------------------------------------- 147

6.15 CHECK FOR CONNECTION 15--------------------------------------------------------------------- 152

6.16 CHECK FOR CONNECTION 16--------------------------------------------------------------------- 158

6.17 CHECK FOR CONNECTION 17--------------------------------------------------------------------- 162

6.18 CHECK FOR CONNECTION 18--------------------------------------------------------------------- 166

6.19 CHECK FOR CONNECTION 19--------------------------------------------------------------------- 175


Project: Tai Wai Station Property Development
WAH 華東幕牆工程有限公司 in STTL No. 520
Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page:
6.20 CHECK FOR CONNECTION 20--------------------------------------------------------------------- 181

7.0 CAST-IN EMBED DESIGN----------------------------------------------------------------------------------- 184

7.1 CHECK FOR CAST-IN EMBED E-01-------------------------------------------------------------- 184

7.2 CHECK FOR CAST-IN EMBED E-01-------------------------------------------------------------- 190

7.3 CHECK FOR CAST-IN EMBED E-01-------------------------------------------------------------- 194

7.4 CHECK FOR CAST-IN EMBED E-04-------------------------------------------------------------- 200

7.5 CHECK FOR CAST-IN EMBED E-05-------------------------------------------------------------- 203

8.0 COMPUTER ANALYSIS OF STEEL FRAME------------------------------------------------------------ 208

8.1 CHECK FOR 100X100X5mm THK. GMS SHS----------------------------------------------------------- 234

8.2 CHECK FOR 150X100X12.5mm THK. GMS RHS------------------------------------------------------- 239

8.3 CHECK FOR WELDING OF STEEL FRAME------------------------------------------------------------ 245

8.4 CHECK FOR EMBED EM01--------------------------------------------------------------------------------- 255

8.5 CHECK FOR EMBED EM01--------------------------------------------------------------------------------- 262

8.6 CHECK FOR EMBED EM02--------------------------------------------------------------------------------- 269

8.7 CHECK FOR EMBED EM02--------------------------------------------------------------------------------- 275

8.8 CHECK FOR EMBED EM03--------------------------------------------------------------------------------- 281

8.9 CHECK FOR ALUMINIUM STIFFENERS @250C/C--------------------------------------------------- 287

APPENDIX A

APPENDIX B

APPENDIX C

APPENDIX D

APPENDIX E

APPENDIX F
Project: Tai Wai Station Property Development
WAH 華東幕牆工程有限公司 in STTL No. 520
Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page:

APPENDIX G

APPENDIX H

APPENDIX I
Project: Tai Wai Station Property Development
WAH 華東幕牆工程有限公司 in STTL No. 520
Wah Tung facade Company
T&N Limited
Prepared: Date: 19-Jul-18
Checked: File: Page: 1

1.0 Design criteria

1. LOADING DATA

1.1 Wind Load (COP Wind Effect in Hong Kong 2004)

Height Above Site-Ground Level = 43.6 m


Artificial base level, = 5.5 m
Net height, = 43.6 - 5.5
= 38.1 m
Basic wind pressure, = 2.45 kPa
Coefficient of wind pressure, = 1.00 / -1.40
Design wind pressure, = 2.45 kPa / -3.43 kPa

1.2. Dead load

Alum. Extrusion 2710 kg/m³ 26.6 kN/m³


Alum. Cladding 2710 kg/m³ 26.6 kN/m³
Steel 7850 kg/m³ 77.0 kN/m³
Glass panel 2650 kg/m³ 26.0 kN/m³

1.3. Imposed load (Areas susceptible to overcrowding)


(COP Dead and imposed load 2011, table 3.13)

Case 1: Line load to be applied at a height of 1.1m above the floor leve = 3.0kN/m
Case 2: Uniformly distributed load to be applied on the infill between floor and top rail = 1.5kPa
Case 3: Concentrated load to be applied on any part of the infill between floor and top rail = 1.5kN

2. MATERIAL

2.1 Mild Steel (Gr. S275) (H.K.Steel Code. - 2011, table 3.9)

Modulus of Elasticity 205000 N/mm²


Coefficient of Thermal Expansion 1.20x10-5 / ° C
G - Modulus of Rigidity 79000 N/mm²
(Thickness <= 16mm)
Minium Yield Strength ( Ys ) 275 N/mm²
Bending stregth 275 N/mm²
Shear strength (py / 3^0.5) 158.8 N/mm²
(Thickness <= 40mm)
Minium Yield Strength ( Ys ) 265 N/mm²
Bending stregth 265 N/mm²
Shear strength (py / 3^0.5) 153.0 N/mm²