You are on page 1of 1

DOCUMENT /ISSUE SAS-QA-PCS-AL-05

SWARAN AUTO SYSTEMS HARIDWAR( A Unit of Swaran Enterprises)


REVISION NO. 0.00/--
MODEL Plate Terminal Assy.(AAFF) INPROCESS CHECKSHEET W.E.F.DATE 1.3.2020
REVISION NO. & DATE A/ 1.2.2019 OBSERVATION
Date &
MONITORING Time Time Time Time
PROCESS CONTROL VALUE/SPE. Evaluation Non-conformities observed
ITEM
Technique
Deflashing Base Plate i)*Free from moulding defects Visually
ii)*Should not be crack/ broken Visually
iii)*Flesh should be remove properly. Visually
Rivet Insertion Rivet Surface i)*Free from dent/scretch,uneven shape of rivet. Visually
Rivet Insertion ii)Should be smooth. Manual
Rivet Punching Punching i) Loose rivet not allowed. Manual
ii) Proper flaring as per limit sample. Visually
iii)Base plate should not be crack/ broken. Visually
Rivet Height iv) *±0.10 mm HG
Pressure v) *2.5~3.5 Kg/cm² PG
Bead Forming Bead Shape i)Bead shape should be as per limit sample. Visually
Solder ii)Solder should not be overheat/ spread. Visually
Flux Oxidation iii) Should not be flux oxidation. Visually
Wire Soldering Soldering defects i)No soldering defects allowed like as blow
Visually
hole,spatter,wire lifting, bridging etc.
Soldering Strength ii) *10 kgf min Push & Pull Gauge
Iron Temprature iii) *380°~430° C Pyrometer
Painting Painting i) Should be proper. Visually

Continuty Testing Wire Location i) Beep sound with red light indicstion during
CTF
testing for OK Part.
Coupler Matching ii)*Matching with femail coupler/ fixture should be
proper. Manual

Visual Inspection (100%) Soldering Joint i) Should be free from soldering defects Visually
Moulding Parts ii) Should be free from moulding defects Visually
Back Out iii) Should not be come out from coupler Manual

Tape availability/ iv) Gray & Green, Location should be as per drg/
sample. Visually
colour/ position
Packing Mix-up i) No mix-up of Material Visually
ii) Date,qty,part name & operator sign should be
Sticker mention on sticker. Visually

Qty. iii) 100 no's /pckt. DWB

Inspected By:
SAS/QA/F-13 ; 0.00/-- ;Issue No-01 ; Issue Dt. 01.04.2018

Review By: Approved By:

You might also like