Professional Documents
Culture Documents
“ENERGOPROIECT”
LICENCE seria A MMII Nr. 042209 from 14 june 2013
Оbject № 2498
WORKING DESIGN
2. Drawings
city Chishinau
2014 year
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
The project is designed in accordance with the applicable rules and regulations,
compliance with measures ensuring the explosion and fire in buildings and structures..
Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
2498-301-26-10.1
Reconstruction of PTL 110 kV
A
Rev. Sheet Docum. № Signature Data
Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 The arrangement of pylons
Inv. No. Sign
WD 1 13
Approved Chabanov 16.06.14
10.1-
Common data 2 sheets
10.2
11 Plan of right-of-way
Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
2498-301-26-10.2
Reconstruction of PTL 110 kV
A
Rev. Sheet Docum. № Signature Data
Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 The arrangement of pylons
Inv. No. Sign
WD 2 13
Approved Chabanov 16.06.14
Corn. 4 Right 2°
№29(254) ex. R/C
PK 28+14
PK 56+83
Crossing №4
Crossing №3
over overhead line 0.4 kV
over overhead line 0.4 kV
Crossing №5
over overhead line 10 kV
Corn. 12 Right 88°
Corn. 9 Right 57°
№155(166) ex.
№77(216) ex.
Corn. 8 Left 52° PK 166+73
PK 81+24
№69(222) ex. Corn. 31 Left 31°
PK 72+57 №401(2) ex.
PK 425+14
Corn. 30 Right 21°
Crossing №22
Corn. 18 Right 67° №397(5) ex. over highway
№214(130) ex. PK 421+04 Crossing №23
Corn. 10 Left 70° №136 УБ 110-7 PK 227+78 Crossing №7 over overhead line 10 kV
№93(206) ex. PK 144+60 over overhead line 10 кV Corn. 29 Right 42°
Corn. 20 Right 84° Cro №396(6) ex.
PK 98+45 s
№241(112) ex. ove sing № PK 419+40 Crossing №24
№115 УБ 110-7 r ov 21
PK 121+51 Corn. 16 Left 14° PK 256+80 №3 erhead lin over highway,
8
Corn. 11 Left 24° №201(137) ex. PK 6(12) e e 10 kV overhead line 10 kV
Corn. 21 Left 32° 4
09+ x. and highway
№94(205) ex. PK 214+31 35
№248(108) ex. Corn. 28 Right 42° №402(1) ex.
PK 99+88 Corn. 19 Left 14° PK 263+89
Corn. 13 Left 58° №224(124) ex. №376(19) ex. PK 426+64
№185(147) ex. PK 238+92 PK 398+82 Substation 110/10 kV
Crossing №19 Hyncheshty
PK 198+46 Corn. 17 Left 16° over overhead line 10 kV
Corn. 14 Left 28° №207(133) ex. Crossing №9 Crossing №18
Crossing №6 over overhead line 0.4 kV
№189(145) ex. PK 220+83 Crossing №17 over overhead line 10 kV
Crossing №20
over overhead
PK 202+14 line 10 kV Crossing №8 Crossing №14 Crossing №15 over overhead line 10 kV over overhead line 35 kV
over overhead line 10 kV over overhead line 10 kV over overhead Corn. 27 Left 44° №385(13) ex.
Corn. 15 Left 21°
Crossing №13 line 10 kV №373(21) ex. PK 408+55
№193(142) ex. Corn. 22 Right 2° over overhead line 0.4 kV PK 395+59
PK 206+26 №257(102) ex. Crossing №11
over overhead line 10 kV Corn. 25 Right 21° Corn. 26 Left 19°
PK 271+93
№336(47) ex. №353(34) ex.
PK 355+59 PK 373+34
№271 УБ 110-7
PK 287+26 Crossing №10
over highway Crossing №16
Crossing №12 over overhead line 10 kV
over overhead line 10 kV,
air communic. cable and
Corn. 23 Left 10° №313 УБ 110-7 highway
№284(84) ex. PK 332+31
PK 301+04
Signature and date Mutual inv. No.
- soil-vegetation Borehole's
layer section
6АС-120/27 6АС-120/27
230 - loam established level of subsurface water
OPGW OPGW 1,5
225 Annex №12 Annex №12 sampling point of monolith ground
220 - clay
sampling point of disturbed ground
215 23
22 24
21 ПБ110-8 ПБ110-8 25
ПБ110-8 26 27 water sample
210 19 20 ПБ110-8 ПБ110-8
ПБ110-8 28 - silt
ПБ110-8 ПБ110-8 ПБ110-8
ПБ110-8
205
18 base of layer, hole bottom
ПБ110-8 115 110 110 115 29(254) 30 5,0
PK 21+40
PK 22+50
200 110
PK 20+30
115 ex. ПБ110-8
PK 23+65
115 114
PK 19+15
PK 24+75
115
PK 25+89
PK 18+00
PK 16+85
31
PK 27+04
195 17 87 110 degree of humidity
ПБ110-8
PK 28+14
ПБ110-8 32 36 37 of sand
PK 15+98
190 115 35 ПБ110-8 ПБ110-8 38 solid
ПБ110-8
PK 29+29
0,5
16 81 0,5 33 34 ПБ110-8 ПБ110-8 39 26 - Borehole, number
185 116 ПБ110-8 40 semisolid
ПБ110-8 0,5 ПБ110-8 ПБ110-8 41 Crossing №2
ПБ110-8 42 1 - layer's number
PK 30+45
115
PK 15+17
115 ПБ110-8 43
180 81 115 116 ПБ110-8 ПБ110-8 44 45 low-plasticity
III number EGE
PK 37+37
15(264)
PK 36+22
PK 31+60
EGE II 115 ПБ110-8 ПБ110-8
ex. EGE II 116 116 high-plastic,
PK 38+53
PK 35+07
175 115 116 46(240)
border of EGE
PK 39+68
115 plastic for sandy loam
PK 33+91
81
PK 14+36
PK 32+76
116 ex.
PK 40+84
14 115 established level
115
PK 41+99
170 extremely high liquid limit soil
PK 13+55
114
PK 43+15
ПБ110-8 90
PK 44+30
0,5 of underground waters
PK 45+45
PK 46+59
PK 47+49
90 0,5 EGE III 5,0
165 water-saturated flow rock
5,0 0,5
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
5,0 0,5
160 13
PK 12+65
ПБ110-8 0,5
155 EGE II
Table - characteristics of EGE ground
96 EGE III
150 12 EGE II
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.
ПБ110-8
deformation E, MPa
Plasticity index, Ip
Internal
of ground, ρ, g/cm³
5,0 Specific
number of ground
145
Porosity factor, e
friction
density of arid
cohesion,
Convenantion
11
Flow index, IL
humidity, W
№№ EGE
96
Modulus of
5,0 kPa angle, grades
ПБ110-8
density
140 5,0
Nature
kPa
10 0,5
EGE II 5,0 Name of ground Cн φн
PK 10+73
135
ПБ110-8
94 φI
5,0 CI
130 CII φ II
PK 9+79
8 90
ПБ110-8 9(268) I
Silty clay
1.84 1.46 0.26 0.22 0.20 0.957 41 17.1 16 14 15 300 45
125
PK 8+89
7 ex.
ПБ110-8 140
6 II Loam 2.04 1.78 0.15 <0 0.13 0.511 37 15.4 25 23 27 300 25
120
PK 7+49
ПБ110-8 92
5 Neogene clay
PK 6+57
115 5,0 III 2.05 1.74 0.18 <0 0.20 0.566 81 33.8 21 19 28 600 41
Crossing №1 ПБ110-8 95 1,0
PK 5+62
110 2 4(272)
ex. 109
ПБ110-8
PK 4+52
ПБ110-8 0,5
+17.5 overhead line10кV 3wires, Нl.wire=93,42.Нh.wire=94,41
100
50 40 100
PK 0+50
PK 2+32
on the sheet
90
0,8
+89Communication cable"Moldtelecom"
85
+0 End tower№273 Нl.crossarm=98.11
5,0
5,0
en forest belt
10K
rd forest belt
ga
72
forest belt
71
en
N2
forest belt
70
3
27 ch forest belt 2. All existing intermediate pylons must be dismantled.
N2
kit
N2
N
68
SKETCH
N2
110KV
3. Suspension of hawser to watch the section №2498-305-26.
forest
belt
69
N2
le
le
ab
le
ab
ab
le
4. On crossarms and ground wire peaks of all R/C pylons must be mounted bird rejector .
ar
ab
ar
ar
ar
PTL 110kV at Substation Leova,3wires 5. In case of non-compliance during construction dimensions of structures intersected or
STATIONING OF inconsistency soil characteristics and terrain parameters specified in the project builder is obliged to
LANDS inform the design organization to verify or modify the design decision.
100.47
101.37
101.74
103.80
105.82
107.22
108.96
110.60
111.86
111.32
111.90
111.53
110.86
112.93
116.30
116.89
117.27
118.93
120.76
121.53
123.37
125.22
127.45
129.68
132.72
136.72
141.04
143.80
148.37
156.66
158.59
162.05
162.32
163.25
164.41
167.94
170.68
180.31
184.94
187.04
188.09
188.69
188.64
188.82
189.95
190.94
191.75
193.18
193.35
191.83
190.95
189.82
189.78
188.79
188.06
187.13
186.35
185.35
183.33
181.10
178.94
175.24
172.69
171.94
169.86
167.57
166.21
164.67
164.41
164.82
165.47
166.27
167.16
167.73
167.85
168.87
169.76
171.50
170.95
170.05
168.22
167.16
165.39
164.37
163.18
162.70
161.99
161.50
160.99
160.18
159.61
158.74
158.40
158.80
158.84
158.96
158.46
6. Design climatic conditions (DCC) with repetition 1 time in 25 years:
76.88
77.30
92.95
92.95
94.48
94.75
94.44
94.88
95.70
98.00
99.11
86.73
87.35
88.64
87.50
86.55
84.62
87.19
88.52
MARK ON AXIS
sleet-V(30 mm), wind - IV (800Pa, 36m/s).
16 2
46.5
46.5
42.5
46.5
35.5
26.5
20.5
28.5
25.5
20.5
21.5
26.5
51.5
62.5
75.5
57.5
78.5
56.5
91.5
62.5
77.5
61.5
90.5
39.5
75.5
51.5
64.5
31.5
68.5
65.5
70.5
94.5
59.5
75.5
74.5
70.5
53.5
85.5
85.5
89.5
89.5
89.5
17.5
23.5
69.5
57.5
10.5
17.5
18.5
13.5
16.5
18.5
36.5
2.5
6.5
3.5
8.5
95
98
PICKETAGE ON AXIS
40
49
44
47
49
23
27
25
23
77
32
59
32
76
55
65
71
95
38
56
56
55
30
94
63
62
74
59
55
93
57
65
34
34
94
50
38
73
31
80
87
86
84
89
34
67
14
16
11
53
14
24
9
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49
MARKS OF LEFT
PROFILE
MARKS OF RIGHTT Contractor: SE ENERGOPROIECT
PROFILE Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
CORNERS, End tower Corn.1 right8 Corn.2 left15 Corn.3 right57 Corn.4 right2 Corn.5 left15
517м 606м 1459м 1935м 2498 -301-26-12
DISTANCES,km PK0+00 232м PK 2+32 PK 7+49 PK 13+55 PK 28+14 PK 47+49
REDUCED SPAN 115 105 106 107 114
LENGTH OF ANCHOR SPAN 232 A
Reconstruction of PTL 110 kV
517 606 1459 1935
Borehole ●26 ●27 ●25 ●28 ●17 ●29 ●30 ●18 ●19 ●31 ●32 ●33 Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
Level of groundwater SURFACE WATER ARE NOT MET Water are not met SURFACE WATER ARE NOT MET Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Arrangement of pylons
EGE III - Approved Chabanov 16.06.14
WD 4 13
Engineering- Conventional number of ground 41 Arrangement of pylons
geology EGE II - Conventional number of ground 25 - Loam Neogene clay EGE II - Conventional number of ground 25 - Loam on the profile of the right-of-way from
pylon №1(273) to pylon №46(240) ENERGOPROIECT
Scale h. 1:5000, v. 1:500
3АС-120/27
OPGW
220
3АС-120/27
OPGW Annex №12
215
Annex №12
93(206)
210 ex. 94(205)
84 85 86 ex.
205 83 ПБ110-15 ПБ110-15 ПБ110-15 87 88
ПБ110-15 ПБ110-15 ПБ110-15
PK 98+45
200 82 89 143
92
PK 99+88
ПБ110-15 ПБ110-15
107 ПБ110-15
PK 89+80
PK 88+73
PK 90+88
195 107 108 108
81 116 109
PK 91+96
PK 87+66
PK 93+12
ПБ110-15 107 101 90 91
PK 94+13
190 77(216) 78 80 ПБ110-15 ПБ110-15
PK 86+59
0,5
PK 97+36
ex. ПБ110-15 79 ПБ110-15 107
185 ПБ110-15 107 108
PK 85+52
0,5 108
PK 96+28
76 107
PK 95+20
47(239) 0,5
180 107 107 107
PK 82+31
PK 84+45
PK 81+24
ex. ПБ110-15
PK 83+38
175 46(240) 75
ex. 48 74 ПБ110-15 111
EGE II
ПБ110-15
PK 80+13
170 42 ПБ110-15
49 71 72 73 0,5
PK 47+91
70 108 5,0
PK 47+49
PK 79+05
ПБ110-15
ПБ110-15 EGE II
112 ex. 108
PK 49+03
PK 77+97
160 51 5,0
112 ПБ110-15 108
PK 50+15
108 5,0
PK 74+73
PK 76+89
PK 75+81
52 108
0,5 108 0,5
PK 73+65
155 112 ПБ110-15
PK 51+27
53 108
PK 72+57
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
PK 53+51
0,5 5,0
145 112 ex. 0,5
56
PK 54+63
112 5,0
0,5 EGE II
140 ПБ110-15
PK 71+54
PK 55+75
108
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.
EGE II 57
PK 56+83
135
ПБ110-15
109 58 102
ПБ110-15 59 67 5,0
PK 57+92
5,0 109 ПБ110-15 ПБ110-15
130
109 Crossing №3
PK 59+01
0,5 EGE II
60
125
ПБ110-15
PK 60+10
109 5,0
PK 70+52
61
120 100 ПБ110-15 62
Crossing №5 5,0 Summary list of pylons
PK 61+19
5,0 66
ПБ110-15 Crossing №4 on the sheet
PK 62+19
115 ПБ110-15
95 63 102
64 65
PK 63+14
EGE II 0,5 95 ПCБ110-1
110 П110-5В+4 П110-5В+4 Name of pylon Qt.
PK 64+09
PK 69+50
97 0,3
105
5,0
122
210 112
PK 65+06
100
1
95
2
PK 68+38
PK 66+28
90
5,0
85
4.5
5,0
ratica
on the sheet № 2498-301-26-12.
v.Sa
10 KV
KV
kV birch
2. In brackets are given the existing numbering pylon.
10
fruit
10 fallow fruit fallow fallow
N215 N211 N210A wheat
N213 h=5m
N2
N214
N2
N2
N216
N2
10 KV
N2
h=5m N213A Replace.
N2
N234 A Replace. N212 Replace.
3. All existing intermediate pylons must be dismantled.
21
Replace. N210 N208 N207
20
05
N233 N228 N223 Replace.
17
18
N239 N238 N237 N236 SCHIMBAT N226 N225 N224 N222
06
N239 N235 N234 N231 N230A N230 N227 Replace.
SKETCH N229
N240
N232 arable
4. Suspension of hawser to watch the section №2498-305-26.
N2
N2
fruit
h =5
16
19
arable wheat arable
pasture arable
arable arable arable wheat birch
m
arable arable fallow arable
arable
5. On short crossarm of a pylon №93 from outer side of a corner to suspend two suporting
0.
PN fallow fallow wheat
4
0 .4 kV
garlands.
STATIONING OF 6. Fundations of pylon №65 smear them with bitumen.
LANDS 7. On crossarms and ground wire peaks of all R/C pylons must be mounted bird rejector .
8. In case of non-compliance during construction dimensions of structures intersected or
158.46
158.07
155.10
152.33
151.60
150.42
148.07
146.50
144.24
144.17
142.28
140.97
137.99
134.04
132.97
131.66
130.71
129.28
127.12
125.78
123.58
121.32
118.44
116.53
115.01
112.06
111.23
108.88
107.28
105.47
104.91
102.45
101.16
101.24
109.86
111.03
115.98
125.86
128.72
133.91
141.23
144.20
144.66
146.50
147.62
148.58
149.18
149.21
148.73
149.09
149.06
152.14
153.88
156.50
159.61
164.55
169.45
170.93
170.80
170.18
168.50
168.38
170.59
172.56
174.01
175.76
178.06
180.17
182.75
184.40
187.08
187.97
188.16
187.96
188.03
186.97
186.42
185.54
185.80
185.56
185.22
183.71
179.85
172.55
168.29
177.27
176.65
185.05
189.70
192.23
193.25
193.08
190.16
99.57
96.63
94.69
93.12
91.71
90.20
94.09
94.96
98.50
88.48
86.76
84.49
84.49
83.80
83.69
83.42
83.25
83.28
83.39
86.63
87.90
89.91
MARK ON AXIS
inconsistency soil characteristics and terrain parameters specified in the project builder is
obliged to inform the design organization to verify or modify the design decision.
26.5
23.5
47.5
21.5
26.5
47.5
29.5
41.5
20.5
97.5
60.5
37.5
62.5
34.5
91.5
65.5
61.5
31.5
36.5
71.5
71.5
90.5
76.5
68.5
39.5
91.5
73.5
66.5
69.5
76.5
57.5
55.5
59.5
56.5
81.5
88.5
87.5
80.5
84.5
83.5
14.5
13.5
16.5
10.5
PICKETAGE ON AXIS
9.5
9.5
5.5
24
43
26
21
47
20
20
25
40
27
24
48
45
45
91
39
72
39
94
65
72
74
34
32
77
64
69
31
78
64
38
31
39
97
33
36
31
30
64
90
37
30
96
58
50
57
54
54
57
83
81
85
83
89
88
83
85
83
88
9. Design climatic conditions (DCC) with repetition 1 time in 25 years:
12
16
19
13
16
17
49
9
47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 119 sleet-V(30 mm), wind - IV (800Pa, 36m/s).
MARKS OF LEFT
PROFILE
MARKS OF RIGHTT Contractor: SE ENERGOPROIECT
PROFILE Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
CORNERS, Corn.5left15 Corn.6left15 Corn.7 right12 Corn.8 left52 Corn.9 right57 Corn.10 left70 Corn.11 left24
DISTANCES,km PK 47+49 PK 47+91
892м
PK 56+83
1574м
PK 72+57
867м
PK 81+24
1721м PK 98+45 PK 99+88
2498 -301-26-13
REDUCED SPAN 42 112 125 108 108 143
LENGTH OF ANCHOR SPAN 42 892 867 1721 143 A
Reconstruction of PTL 110 kV
1574
Borehole ●20 ●34 ●35 ●36 ●21 ●22 ●23 ●37 ●38 ●24 ●39 ●40 ●41 ●42 ●43 Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
Level of groundwater SURFACE WATER ARE NOT MET Water average agresion - 4.5 m Water average agresion - 0.5 m
SURFACE WATER ARE NOT MET SURFACE WATER ARE NOT MET Drawn Vornic 26.05.14 Stage Sheet Sheets
EGE I - Convential number EGE III - Convential number
Checked Vasilkovskaya 09.06.14 Arrangement of pylons WD 5 13
Approved Chabanov 16.06.14
Engineering- of ground 45 of ground 41 Arrangement of pylons
geology EGE II - Conventional number of ground 25 - Loam Silty clay Neogene clay EGE II - Conventional number of ground 25 - Loam on the profile of the right-of-way from
pylon №46(240) to pylon №94(205) ENERGOPROIECT
Scale h. 1:5000, v. 1:500
280
3АС-120/27 3АС-120/27
OPGW OPGW
275 Annex №12 Annex №12
270
265
260
255
250
156(166)
132 133 135 155
130 131 154 ex.
245 ПБ110-15 ПБ110-15 ПБ110-15 136 137 153 ПБ110-15
129 ПБ110-15 ПБ110-15 ПБ110-15
УБ110-7 ПБ110-15 138 152 ПБ110-15
240
ПБ110-15 ПБ110-15
(look note p.5) ПБ110-15 151 105
PK 166+73
128 113 113 114 139 110
112
PK 165+68
ПБ110-15
PK 141+31
110
PK 140+18
113
PK 143+57
PK 139+05
PK 137+92
ПБ110-15 ПБ110-15
PK 164+58
235 113 103 112 140 141 150
PK 163+48
PK 145+72
110
PK 144+60
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
112
PK 136+79
127 ПБ110-15 ПБ110-15 ПБ110-15
PK 162+38
113
PK 146+84
230 116 ПБ110-15 112 142 110
114 115 117 149
PK 161+28
ПБ110-15 112 ПБ110-15
PK 135+66
PK 147+96
ПБ110-15 УБ110-7 ПБ110-15 113 112 143 ПБ110-15 110
225 113 118 126
PK 160+18
PK 149+08
ПБ110-15
PK 150+20
(look note p.5) ПБ110-15 ПБ110-15 0,5 111 144
ПБ110-15 119 110
PK 134+53
220 ПБ110-15
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.
PK 151+31
91 145 148
PK 122+53
112 102 102 ПБ110-15 120 113
PK 121+51
PK 159+08
90 113
PK 120+60
PK 123+55
ПБ110-15 ПБ110-15 125 ПБ110-15 146 ПБ110-15
PK 152+44
215 105 112 147
PK 124+60
121 EGE II
PK 133+40
ПБ110-15
PK 119+70
0,5 ПБ110-15 110
111 107 ПБ110-15 ПБ110-15
PK 153+56
94(205) 90 112
PK 125+67
210 99 100 ПБ110-15 122 113 EGE II
98
PK 157+98
PK 154+68
ex. ПБ110-15 106 ПБ110-15 123 124 EGE II
PK 118+80
101 110 110
PK 126+73
95 ПБ110-15 ПБ110-15 110
108 ПБ110-15 ПБ110-15
PK 132+27
97 ПБ110-15
PK 155+78
205 96 67 0,5
ПБ110-15
PK 156+88
PK 127+81
ПБ110-15 102 0,5
ПБ110-15 107
PK 118+13
113 113 ПБ110-15 113 5,0
PK 99+88
200 113
PK 105+43
PK 128+88
PK 106+56
108
PK 130+01
PK 131+14
PK 107+57
113 Summary list of pylons
PK 100+96
ПБ110-15 110
PK 108+58
190 ПБ110-15
EGE III
5,0 EGE II
on the sheet
101
185 0,5 0,5 Name of pylon Qt.
PK 109+59
0,5
104 5,0 EGE I
ПБ110-15
PK 117+00
EGE III
180 101 5,0
105 106 EGE II
107 108 109
175 EGE II ПБ110-15 ПБ110-15
ПБ110-15 ПБ110-15 ПБ110-15113
PK 110+60
170 78
113 113
PK 112+51
0,5
PK 111+38
PK 113+64
113
PK 115+87
165 110
+87.5 Corn11 Metal tower №205 Hl.crossarm=204.36
PK 114+77
Field road
pasture pasture
pasture pasture pasture
N199
N203
N181
N183
arable wheat arable
N204
N172
N200
N189
N185
wheat
N173
N205
N182
arable
N187
N179
N175
wheat
N194
N169
N186
arable wheat
N177
arable
N192
N166
N202
N197
N190
N184
N178
arable pasture
N176
arable
N170
N171
N167
N191
N174
wood
N195
N180
N201
N196
N188
fallow fallow
N193
arable wood fallow
plum
wheat
N168
SKETCH
N198
STATIONING OF
LANDS
201.21
203.85
205.94
207.14
209.09
210.13
211.02
210.37
209.20
209.09
208.47
205.25
201.75
201.70
206.60
216.79
202.72
212.25
216.82
187.90
187.80
185.24
190.16
184.42
190.04
190.75
190.74
190.35
188.54
187.39
176.99
172.25
167.49
163.92
155.23
157.30
158.08
157.54
155.90
155.00
156.80
162.16
167.81
170.29
182.11
191.87
194.29
197.55
198.39
194.60
190.58
210.91
156.2
MARK ON AXIS
22.95
47.15
92.75
35.25
95.55
55.30
64.10
61.05
53.85
60.25
60.35
88.60
18.85
18.35
27.9
40.2
42.6
25.7
4.35
21.5
77.9
30.3
73.8
34.5
73.5
32.5
53.5
60.5
65.9
59.4
54.4
63.0
55.9
63.3
62.0
64.5
67.5
64.5
54.5
55.5
56.5
59.5
86.6
89.0
88.5
81.5
84.5
88.5
11.8
15.7
14.5
7.4
6.5
5.5
41
42
49
73
77
31
73
PICKETAGE ON AXIS
68
57
63
65
52
51
88
88
84
19
15
18
9
100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 167 168
MARKS OF LEFT
PROFILE
MARKS OF RIGHTT Contractor: SE ENERGOPROIECT
PROFILE
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
CORNERS, Corn.11 left24 Corn.12 right88
DISTANCES,km PK 99+88
6685м
PK 166+73
2498 -301-26-14
REDUCED SPAN 105 110 111
LENGTH OF ANCHOR SPAN 2163 2309 2213 A
Reconstruction of PTL 110 kV
Borehole ●44 ●45 ●46 ●47 ●15 ●48 ●49 ●16 ●50 ●14 ●51 ●13 ●52 ●12 ●53 ●11 Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
Level of groundwater SURFACE WATER ARE NOT MET GROUND WATER ARE NOT MET SURFACE WATER ARE NOT MET SURFACE WATER ARE NOT MET SURFACE WATER ARE NOT MET Drawn Vornic 26.05.14 Stage Sheet Sheets
EGE I - Conventional number
Checked Vasilkovskaya 09.06.14 Arrangement of pylons WD 6 13
Approved Chabanov 16.06.14
Engineering- of ground 45 Arrangement of pylons
geology EGE II - Conventional number of ground 25 - Loam EGE III - Conventional number of ground 41 - Neogene clay EGE II - Conventional number of ground 25 - Loam Silty clay EGE II - Conventional number of ground 25 - Loam on the profile of the right-of-way from
pylon №94(205) to pylon №156(166) ENERGOPROIECT
Scale h. 1:5000, v. 1:500
3АС 120/27 3АС 120/27
OPGW OPGW
Annex №12 Annex №12
305
300 214(130)
ex.
295
213
ПБ110-15 215
290 212
PK 227+78
211 ПБ110-15 ПБ110-15
285 195 210 ПБ110-15 111
196 99
PK 226+79
194 209 ПБ110-15
ПБ110-15 ПБ110-15 197 Crossing №6 208 216
99
PK 228+89
280 193(142) ПБ110-15 207(133) ПБ110-15
PK 225+80
ПБ110-15 ПБ110-15 ПБ110-15
ex. ex. 99
PK 224+81
275 100 111
PK 223+81
206
PK 208+26
100
PK 209+26
100 99
PK 207+26
100 198 201(137)
PK 230+00
ПБ110-15 100 0,5
PK 210+26
PK 221+82
PK 222+82
270 192 100 ПБ110-15 ex. 202 99 217
PK 220+83
PK 206+27
199 200 203 205
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
PK 219+74
218 224(124)
PK 214+31
PK 211+26
260 185(147) 191 0,5 100 108 109 0,5
105 109 219 220 221 223 ex.
PK 215+39
ПБ110-15 222
PK 205+23
186
PK 231+11
PK 213+26
100
PK 212+26
ex. 108
PK 218+65
ПБ110-15
PK 216+48
PK 217+56
184 ПБ110-15 109 ПБ110-15 ПБ110-15 ПБ110-15 ПБ110-15 ПБ110-15
255 187 EGE II
112
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.
PK 238+92
ПБ110-15 ex.
PK 232+23
250 183 0,5 111 111
PK 204+20
111
PK 233+34
PK 198+46
PK 234+45
112 113
PK 237+79
111
PK 235+56
PK 236+67
156(166) 92
PK 199+38
ПБ110-15 108 0,5 5,0
ex. 92 0,5
103
PK 197+38
0,5
PK 200+30
245 92
PK 203+17
182
PK 201+22
EGE II
PK 202+14
110 92 103
ПБ110-15
240 168 169
PK 196+28
PK 166+73
PK 195+18
113 ПБ110-15 ПБ110-15
0,5
230 180 5,0
PK 179+95
110
PK 180+90
95 ПБ110-15
110
PK 167+86
PK 194+08
158 166 EGE II
225 102 171 179 5,0
ПБ110-15 ПБ110-15 0,5 5,0
PK 178+85
PK 181+92
ПБ110-15 ПБ110-15 110 5,0
113 EGE II
PK 192+98
220 110 178
0,5 113 ПБ110-15 110
159
PK 168+99
165
PK 177+75
215 0,5 172 5,0
PK 191+88
ПБ110-15
PK 183+05
ПБ110-15 ПБ110-15 5,0 5,0
Weight 177
113 113 110 5,0
210 G=50 кg 116
PK 190+78
ПБ110-15
(look note p.4) 173
160
PK 170+12
PK 176+59
PK 184+18
205 ПБ110-15
ПБ110-15 176 110 0,5
113 164 113 5,0
PK 189+68
200 ПБ110-15
ПБ110-15
174
PK 185+31
110 110
PK 171+25
PK 188+58
ПБ110-15 ПБ110-15
PK 175+49
190
EGE II 113 EGE II
101
101 on the sheet
125
PK 186+32
162 85
PK 187+57
185
PK 172+38
Total 68
170
160
5,0
birch
arable wheat wheat N148
wheat wheat wheat
fallow
fallow fallow
arable
arable
wheat wheat wheat fallow
fallow wheat pasture
wheat garlands.
7. On crossarms and ground wire peaks of all R/C pylons must be mounted bird rejector .
8. In case of non-compliance during construction dimensions of structures intersected or
STATIONING OF
LANDS inconsistency soil characteristics and terrain parameters specified in the project builder is
obliged to inform the design organization to verify or modify the design decision.
228.39
228.39
224.23
219.65
212.87
208.67
201.40
200.52
205.89
210.78
213.81
216.06
219.56
221.71
220.93
218.35
213.39
206.52
202.57
200.29
201.69
204.34
207.57
212.60
217.45
222.88
228.13
233.72
237.23
240.25
239.51
239.51
236.02
234.56
233.56
233.51
234.35
234.96
236.74
240.30
245.23
250.46
254.27
259.28
261.77
262.79
264.21
199.28
194.26
187.17
186.02
181.91
178.98
171.26
168.75
160.87
160.10
158.58
158.44
159.12
164.03
172.59
181.13
181.72
186.91
188.53
188.88
192.89
194.26
197.04
197.83
191.37
185.67
183.84
179.34
177.03
171.40
170.91
171.42
176.01
179.73
184.74
186.38
187.81
191.49
193.29
196.39
199.45
264.55
263.89
263.71
262.15
260.52
258.43
255.53
251.76
250.22
249.64
248.71
248.55
248.37
249.58
250.41
251.55
250.55
249.34
248.10
247.19
248.48
251.97
256.06
259.35
259.72
261.07
262.09
263.83
265.78
268.92
270.69
274.83
278.58
273.47
269.63
261.54
254.96
248.28
243.28
239.94
239.51
239.48
239.63
239.73
239.29
239.36
239.89
241.46
240.05
MARK ON AXIS 9. Design climatic conditions (DCC) with repetition 1 time in 25 years:
sleet-V(30 mm), wind - IV (800Pa, 36m/s).
40.5
49.5
47.5
21.5
20.5
25.5
22.5
26.5
24.5
27.5
42.5
43.5
22.5
49.5
23.5
70.5
74.5
72.5
64.5
34.5
69.5
91.5
98.5
33.5
72.5
72.5
71.5
76.5
33.5
92.5
76.5
75.5
36.5
66.5
67.5
71.5
77.5
60.5
31.5
65.5
94.5
62.5
97.5
79.5
59.5
59.5
56.5
56.5
57.5
59.5
57.5
58.5
57.5
81.5
87.5
88.5
85.5
18.5
11.5
14.5
12.5
11.5
17.5
16.5
13.5
4.5
4.5
7.5
6.5
5.5
26
40
28
21
21
24
44
46
27
40
23
24
48
41
73
60
35
77
68
30
98
62
69
61
71
96
36
76
31
74
95
96
78
61
96
63
92
51
54
56
56
51
56
PICKETAGE ON AXIS
82
89
81
84
82
88
86
80
84
83
18
17
16
12
12
14
7
6
166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238
MARKS OF LEFT
PROFILE
MARKS OF RIGHTT Contractor: SE ENERGOPROIECT
PROFILE
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
CORNERS, Corn.12 right88 Corn13 left58 Corn.14 left28 Corn.15 left21 Corn.16 left14 Corn.17 left16 Corn.18 right67 Corn.19 left14
DISTANCES,km PK 166+73 PK 198+46 PK 202+14 PK 206+27 PK 214+31 PK 220+83 PK 227+78 PK 238+92
2498 -301-26-15
REDUCED SPAN 111м 92м 103м 101м 109м 99м 111м
LENGTH OF ANCHOR SPAN 3173м 368м 412м 805м 652м 695м 1114м A
Reconstruction of PTL 110 kV
Borehole ●54 ●55 ●56 ●10 ●57 ●58 ●59 ●60 ●61 ●62 ●63 ●64 ●65 ●66 ●67 ●68 ●9 ●70 Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
Level of groundwater SURFACE WATER ARE NOT MET Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Arrangement of pylons WD 7 13
Approved Chabanov 16.06.14
Engineering- Arrangement of pylons
EGE II - Conventional number of ground 25 - Loam
geology on the profile of the right-of-way from
pylon №156(166) to pylon №224(124) ENERGOPROIECT
Scale h. 1:5000, v. 1:500
3АС 120/27 3АС 120/27
OPGW OPGW
Annex №12 Annex №12
224(124)
ex. 225
ПБ110-15
226
ПБ110-15 Weight
PK 238+92
PK 240+25
133 G=50 kg 241(112)
(look note p.4) ex.
245 93
PK 241+18
242
240 227 ПБ110-15
ПCБ110-1 240 243
PK 256+80
0,5
ПБ110-15 ПБ110-15 244
111
235
239 ПБ110-15 245 275
102
PK 257+82
ПБ110-15 114 ПБ110-15 246 ПБ110-15
230 228 101 274
PK 255+66
PK 242+29
PK 258+83
ПБ110-15 276
ПБ110-15 229 101 247 ПБ110-15
PK 259+84
ПБ110-15
225 EGE II ПБ110-15 230 238 112 101 ПБ110-15
PK 260+85
PK 291+26
PK 254+54
96 ПБ110-15 ПБ110-15 248(108)
101 273
PK 290+26
70
PK 261+86
220 ex. 100
PK 243+25
PK 291+96
0,5 101 ПБ110-15
PK 244+55
130 112 249 252 277
PK 262+87
90 253
215 5,0 ПБ110-15 ПБ110-15
PK 253+42
237 ПБ110-15 ПБ110-15 75
PK 245+45
231 102 251 130
PK 263+89
ПБ110-15
PK 289+51
210
ПБ110-15 0,5 250 ПСБ110-1
Crossing №7 85 ПСБ110-1 254
PK 267+59
0,5
PK 293+26
55
PK 264+74
112
PK 268+55
EGE II 96
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
PK 252+30
PK 246+00
0,5 60 ПБ110-15 130 ПCБ110-1
Weight 236 110
200 Weight
PK 266+99
G=50 kg ПБ110-15 65 100
115 G=50 kg
PK 265+84
(look note p.4) 5,0 271 0,5
112 EGE II (look note p.4)
PK 269+20
195 УБ110-7
PK 288+21
Weight
PK 294+26
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.
PK 251+18
190 EGE II
104 EGE II 95
(look note p.4)
5,0 235 5,0 85
185 0,5 270 112
232 ПБ110-15 EGE II ПБ110-15 279
PK 287+26
ПБ110-15 5,0 255 0,5
112 103 ПБ110-15
180 ПБ110-15
269 5,0
261
PK 250+06
234 Crossing №8 262 ПБ110-15
PK 286+23
175
PK 270+05
ПБ110-15 ПБ110-15
PK 247+04
PK 295+38
233 ПБ110-15
ПСБ110-1 260 268 113
170 0,5 Crossing №9 114
56 ПБ110-15 263 ПБ110-15 280
PK 285+10
ПБ110-15
PK 276+64
PK 277+69
5,0 256
PK 249+50
165 76 105 113 ПБ110-15
ПСБ110-1 95 267 EGE II
PK 275+69
0,5 ПБ110-15
PK 283+97
50 Weight
PK 247+80
160 170 88 259 5,0
PK 278+19
G=50 kg EGE II
PK 296+52
ПБ110-15
155 130 (look note p.4) 113
0,5 281
PK 282+84
0,5 258 266
PK 270+93
257(102) ПБ110-15
150 EGE II ПCБ110-1 ПБ110-15
PK 274+39
ex. 0,5 112
126 113
5,0 96 264
145 100 265 0,5
EGE II
PK 297+64
ПСБ110-1
PK 281+71
ПБ110-15
PK 271+93
PK 273+43
140 5,0
5,0
150
106 114 282
EGE I
ПСБ110-1 Crossing №10 Summary list of pylons
135
PK 280+65
on the sheet
PK 279+45
120
130 0,5 5,0
5,0
283 Name of pylon Qt.
EGE II 5,0 284(84) 285 286 287 289 290(80)
PK 298+78
125 ПБ110-15 288
EGE II ex.
PK 300+10
EGE I ПБ 110-15 50
EGE II 94 100
PK 302+04
100
PK 301+04
100 100
PK 303+04
PK 304+00
PK 307+00
96
+97.5 Overhead line 10кV Нh.wire=154.18
PK 305+00
PK 306+00
115 100
100
Hl.crossarm=119.87
3,0 3,0
Hl.crossarm=119.25
5,0
5,0 5,0
1. The pylon №224(124) is taken in account in summary list of pylons
Hyncheshty
on the sheet № 2498-301-26-15.
2. In brackets are given the existing numbering pylon.
10 K V
wheat
wood wood at t wheat arable wheat
wood wood e ea birch arable wheat fallow arable
3. All existing intermediate pylons must be dismantled.
moldtel
wh wheat
wh arable
N114
N124
N115
N123
fallow
N118
N119
arable
cable
N121
t wheat
N122
N113
N8
N120
N1 b ir N9 N 84
N116
ea N1 N1 N9 N9 N9 fallow N9 N8 arable
N117
fallo
N112 110KV 01 0
SKETCH N9 N9 wastebasket 4. On every insulator string R/C pylons №№228, 232, 255 and 264 to hang up
w
241.46
3 2 N85
0.4K V
ff N 82
pasture wheat
le le
wheat
pasture wood N 81
weigh 50 kg.
10
le wood
pasture arable a rab a rab a rab wheat wheat birch arable wood wood wood wood wood arable arable
KV
pasture arable
Cimishliya
5. Suspension of hawser to watch the section №2498-305-26.
6. Angle-tension pylon №271-УБ110-7 are buried on 4,5 m.
STATIONING OF
LANDS 7. On short crossarm of a pylons №№241 and 290 from outer side of a corner to suspend two
suporting garlands.
241.70
237.40
236.14
233.53
221.95
210.95
209.40
209.05
207.83
209.71
207.72
203.89
200.14
205.63
209.41
213.19
215.43
218.39
220.52
224.60
228.18
222.09
220.66
218.88
217.16
216.20
212.20
210.03
206.51
201.75
200.54
203.96
209.94
215.02
214.31
208.32
201.38
196.01
186.43
177.72
172.09
163.67
154.60
148.33
143.23
143.97
145.67
160.07
167.31
172.96
180.88
185.81
191.47
196.39
198.94
196.90
190.19
181.91
191.97
197.15
198.42
196.26
191.04
180.73
161.20
147.46
142.17
142.65
131.34
130.23
128.89
126.99
126.83
129.91
133.63
139.15
146.92
149.77
152.54
155.89
156.95
154.84
140.46
131.32
122.40
123.13
125.42
129.75
134.41
140.69
144.37
149.50
157.04
161.26
168.71
178.38
185.95
196.06
193.97
182.44
174.05
163.07
149.83
137.58
129.85
126.87
115.91
110.38
108.82
107.47
107.35
107.29
107.29
105.92
105.76
105.67
105.53
105.16
105.28
105.20
105.27
104.35
105.28
105.10
241.46
MARK ON AXIS 8. Racks and crossbars of pylons №№ 264,265,283,285-289 smear them with bitumen.
9. On crossarms and ground wire peaks of all R/C pylons must be mounted bird rejector .
95.37
97.87
42.21
49.35
48.26
45.59
48.62
41.34
42.99
23.55
46.59
42.17
44.24
41.83
42.44
43.36
22.28
41.62
24.19
42.58
48.46
75.09
77.93
73.37
73.33
71.00
70.61
73.03
76.70
66.25
52.98
95.29
93.08
35.79
58.33
34.15
57.22
55.30
57.67
30.09
38.36
54.02
57.13
35.42
69.44
35.78
60.63
91.40
52.06
52.12
91.63
34.60
60.13
51.74
92.54
61.52
50.00
33.07
30.80
54.78
35.33
59.74
53.03
67.15
95.24
91.51
69.03
30.29
95.58
89.88
89.36
89.74
80.92
82.62
89.88
86.98
83.59
85.32
87.37
89.98
82.16
88.56
87.48
37.42
18.59
18.91
11.68
15.06
13.80
18.54
19.89
11.62
19.51
16.37
18.19
16.72
19.41
15.99
19.96
16.86
40.7
4.70
4.00
7.21
10. In case of non-compliance during construction dimensions of structures intersected or
5.74
5.51
97.5
3.12
6.39
5.10
8.76
8.84
18.3
92
93
80
89
PICKETAGE ON AXIS
238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 inconsistency soil characteristics and terrain parameters specified in the project builder is
MARKS OF LEFT
obliged to inform the design organization to verify or modify the design decision.
PROFILE 11. Design climatic conditions (DCC) with repetition 1 time in 25 years:
MARKS OF RIGHTT
sleet-V(30 mm), wind - IV (800Pa, 36m/s).
PROFILE
CORNERS, Corn.19 left14 Corn.20 право84 Corn.21 left32 Corn.22 right4 Corn.23 left10 Corn.24 left79
DISTANCES,km PK 238+92 PK 256+80 PK 263+89 PK 271+93 PK 301+04 PK 307+00 Contractor: SE ENERGOPROIECT
115м
Beneficiary: SE Moldelectrica
REDUCED SPAN 115м 101м 94м 111м 99м License: Seria A MMII Nr 042209 from 14 June 2013
LENGTH OF ANCHOR SPAN 1788м 709м 804м 1533м 1378м 596м
Borehole ●70 ●71 ●72 ●73 ●74 ●75 ●76 ●77 ●78 ●79 ●8 ●7 ●80 ●6 ●5 ●81 ●1 ●82 ●83
2498 -301-26-16
Level of groundwater 0.5 м 3,5 м 2,0 м 2,0 м
A
Reconstruction of PTL 110 kV
Surface water are
EGE I - EGE I - agresive Surface water are agresive Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
Engineering-
Conventional Conventional Drawn Vornic 26.05.14 Stage Sheet Sheets
geology EGE I -
EGE II - Conventional number of ground 25 - Loam number of number of Conventional Checked Vasilkovskaya 09.06.14 Arrangement of pylons
ground 45 EGE II - Conventional number of ground 25 - Loam ground 45 EGE II - Conventional number of ground 25 - Loam EGE II - Conventional number of ground 25 - Loam EGE I - Conventional number of ground 45 WD 8 13
number of ground Approved Chabanov 16.06.14
Silty clay Silty clay Arrangement of pylons
45 Silty clay
Silty clay on the profile of the right-of-way from
pylon №224(124) to pylon №290(80) ENERGOPROIECT
Scale h. 1:5000, v. 1:500
3АС-120/27 3АС-120/27
235
OPGW OPGW
230 Annex №12 Annex №12
225
220
215
210
195
205
190
200
185
180
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
175
170
165
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.
160
155
150
145
PK 373+34
290(80) 291 292 293 295 ПБ110-15 ПБ110-15 ПБ110-15 ПБ110-15 ПБ110-15 ПБ110-15 ПБ110-15
PK 370+69
PK 372+99
125 ПБ110-15 ПБ110-15 ПБ110-15
PK 371+94
ПБ110-15 ПБ110-15 ПБ110-15 ПБ110-15
PK 369+95
105
PK 368+82
ПБ110-15
PK 367+69
ПБ110-15 ПБ110-15
PK 366+56
ex.
PK 365+43
ПБ110-15 ПБ110-15 65 100 125
PK 364+30
74
PK 355+59
PK 363+17
113 113 113 113
PK 360+99
(look note p.5) 108 108 113 113 113
PK 362+04
108
PK 359+91
PK 358+83
112 112 98
PK 357+75
108 108 105
PK 354+61
PK 356+67
112 112 60 70 112 112 112 112 112
PK 353+49
PK 352+37
PK 334+88
112 112 103 93 91
PK 351+25
112
PK 349+01
PK 347+89
PK 350+13
120
PK 345+65
PK 346+77
PK 344+04
PK 344+95
65
PK 340+36
PK 335+88
PK 339+24
PK 342+08
PK 343+11
PK 338+12
113
PK 337+00
113 113 102
PK 333+21
PK 330+73
113 113 113 113 113 113
PK 325+08
PK 331+38
PK 328+47
113 113 113 113 113
PK 323+95
PK 329+60
PK 326+21
113 113 113 113 113 113 90
PK 327+34
PK 321+69
PK 319+43
113
PK 322+82
PK 314+91
93
PK 320+56
PK 317+17
PK 316+04
PK 318+30
PK 332+31
PK 313+78
PK 310+39
PK 312+65
PK 308+13
PK 307+00
PK 309+26
115
105 EGE I
2,0 2,0 EGE I
МoldtransGAS,Cimishliya-Hyncheshty.
3,0
5,0
1. The pylon №290(80) is taken in account in summary list of pylons
5,0
5,0 5,0 on the sheet № 2498-301-26-16.
5,0 5,0
5,0 5,0 2. In brackets are given the existing numbering pylon.
5,0
3. All existing intermediate pylons must be dismantled.
4. Suspension of hawser to watch the section №2498-305-26.
5. Angle-tension pylon №313-УБ110-7 are buried on 4,5 m.
N4
arable
N4
N4
N3
arable
N7
N6
N4
N7
N3
N5
N3
N7
N7
N4
N3
arable
N3
N3
N8
N7
N7
N5
N6
N4
arable
N7
N6
N6
N6
N7
N5
N6
N4
N4
N7
N7
N5
N5
N4
N6
N6
N6
N6
N5
N5
3
4
4
8
5
5
9
3
8
9
5
7
6
0
7
9
0
2
4
1
9
8
8
6
0
5
1
1
5
1
SKETCH
N5
N5
N5
N4
4
11
7
0. 1
9
v.Firladeni
STATIONING OF
LANDS
112.28110.80
107.21
107.34
107.67
108.74
108.71
109.56
109.48
109.61
109.71
110.02
109.49
105.10
105.38
105.65
105.52
105.89
105.83
106.34
105.80
105.99
106.74
107.44
107.38
106.87
106.66
106.94
107.27
107.28
107.17
107.55
107.90
108.04
108.55
107.83
107.90
107.84
108.22
108.21
108.33
108.45
108.81
108.66
108.84
109.83
110.44
109.57
109.38
109.62
109.41
109.82
109.59
110.06
109.65
109.81
109.70
109.64
109.80
110.08
110.22
109.90
109.66
110.33
110.16
110.17
110.26
110.83
110.87
110.86
110.13
110.64
111.26
110.82
111.18
111.29
111.44
111.52
111.41
111.94
112.34
112.52
112.91
112.42
112.56
112.51
112.44
112.48
112.58
112.67
112.58
112.74
112.83
112.84
113.08
112.70
112.77
113.15
113.25
113.20
113.35
113.52
113.49
113.63
113.83
114.06
113.79
114.21
114.53
114.80
115.72
115.20
115.18
115.36
115.93
MARK ON AXIS
110.54
112.70
113.31
113.31
112.78
112.28
110.80
110.65
48.0
47.9
42.6
40.7
47.4
48.0
45.6
42.1
42.3
48.3
45.1
49.0
47.4
79.8
07.6
71.2
62.2
29.6
28.1
58.5
84.2
80.0
82.7
52.8
64.7
69.5
71.5
78.0
54.2
66.4
68.5
30.8
38.6
72.2
90.5
74.8
57.3
96.7
58.7
69.5
53.2
74.6
51.6
58.5
99.0
50.0
81.1
84.4
82.1
84.4
38.7
23.3
40.9
45.5
78.4
21.4
49.6
97.0
92.3
78.5
79.5
72.4
79.3
79.4
77.7
11.5
12.1
16.9
70.5
31.5
55.8
34.0
31.7
35.3
50.0
34.8
96.0
83.1
63.9
16.0
14.6
17.9
13.0
10.5
10.4
15.4
88.4
88.5
89.6
19.7
11.0
12.0
61 62.5
38.7
PICKETAGE ON AXIS
6.9
4.3
2.7
5.3
0.9
3.1
7.1
5.5
5.0
3.1
8.3
7.8
9.2
1.0
59
34
43
79.5
49.0
85.5
34.9
37.6
50.9
63
57.5
66
307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374
MARKS OF LEFT
PROFILE
MARKS OF RIGHTT Contractor: SE ENERGOPROIECT
PROFILE Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
CORNERS, Corn.24 left79 Corn.25 right21 1775м Corn.26 left19
DISTANCES,km PK 307+00
4859м
PK 355+59 PK 373+34
2498 -301-26-17
REDUCED SPAN 111 104 106
LENGTH OF ANCHOR SPAN A
Reconstruction of PTL 110 kV
2531 2328 1775
Borehole ●83 ●84 ●85 ●2 ●87 ●88 ●3 ●86 ●89 ●90 ●91 ●92 ●93 ●94 ●95 ●96 ●97 Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
Level of groundwater 2,0 м 2,0 м 2,0 м Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Arrangement of pylons WD 9 13
Engineering-
SURFACE WATER ARE AGRESIVE Approved Chabanov 16.06.14
Arrangement of pylons
geology EGE I - Conventional number of ground 45 on the profile of the right-of-way from
pylon №290(80) to pylon №353(34) ENERGOPROIECT
Silty clay
Scale h. 1:5000, v. 1:500
3АС-120/27 3АС-120/27+3AC 150/24
OPGW OPGW
Annex №12 Annex №12
235
230
225
220
215
210
205
200
195
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
190
185
180
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.
175
170
PK 423+79
140 362 ПБ110-15 374 381 387
363 375 378 ПБ110-15 ПБ110-15 ПБ110-15 ПБ110-15 123 on the sheet
ПБ110-15
PK 422+56
354 ПБ110-15
PK 393+38
358
PK 394+49
135 ПБ110-15 111 109
ПБ110-15 ПБ110-15 164 152
PK 392+26
112 108 123 97 98 97 Name of pylon Qt.
PK 414+51
98
PK 418+41
103 97 99
PK 410+58
PK 413+54
PK 415+49
PK 412+74
112 112 111 108 109 113 80
PK 396+67
80
PK 383+31
PK 404+22
130 108
PK 384+43
112 108 108 108 108 108 108
PK 385+55
PK 397+47
112 112 135
PK 400+98
112 112 112 112
PK 381+07
PK 374+57
123 103
PK 379+09
120 EGE II
115
+34 Corn.26 Metal tower №34 Hl.crossarm=130.03
+47Highway Нl.wire110кV=145.2
100 on the sheet № 2498-301-26-17.
5,0
2. In brackets are given the existing numbering pylon.
STATIONING OF
LANDS
115.93
117.04
117.29
116.06
116.07
116.17
116.94
118.25
120.60
121.85
121.84
120.49
120.49
119.75
119.46
119.92
120.07
120.97
121.78
122.62
121.97
123.15
122.75
124.08
125.76
127.55
124.67
124.03
120.60
120.04
119.90
119.94
118.96
119.02
119.39
119.53
119.40
119.77
120.85
120.50
120.69
121.23
121.51
133.29
121.90
121.12
122.67
125.90
125.95
133.01
132.78
130.41
17.39
MARK ON AXIS
128.51
129.75
129.56
130.50
130.90
131.15
134.76
134.96
134.91
133.28
133.70
119.91
118.78
119.57
119.57
119.30
120.86
121.83
119.84
121.60
121.95
120.20
121.16
56.551
29.5
44.5
26.5
48.5
41.5
27.5
76.5
73.5
72.5
78.5
71.5
95.5
65.5
56.5
31.5
55.5
50.5
90.5
98.5
39.5
69.0
96.5
57.5
55.5
81.5
84.5
10.5
15.5
13.5
16.5
PICKETAGE ON AXIS
0.5
5.5
8.5
8.5
36
63
23
21
46
40
23
47
79
71
74
79
73
34
64
93
69
34
91
92
59
32
59
59
34
93
33
55
90
35
94
59
99
30
39
92
34
94
52
82
82
20.5
14
10
14
89.5
80.5
89.5
46.5
27.5
34.5
5.5
5.5
96
99
79
28
37
46
85
7.5
15
9
64
27
95
22
53
18
39
19
373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429
MARKS OF LEFT
PROFILE
MARKS OF RIGHTT
PROFILE
CORNERS, Corn.26 left19 Corn.27 left44 Corn.28 right42 Corn.29 right42 Corn.30 right21 Corn.31 left31 End tower
DISTANCES,km PK 373+34 PK 395+59 PK 398+82 PK 419+40 PK 421+04 PK 425+14 PK 426+64 Contractor: SE ENERGOPROIECT
REDUCED SPAN 112
Beneficiary: SE Moldelectrica
112 108 164 138 150 License: Seria A MMII Nr 042209 from 14 June 2013
LENGTH OF ANCHOR SPAN 2225 323 2058 164 410 150
Borehole ●98 ●99 ●100 ●101 ●102 ●103 ●4 ●106 ●107
2498 -301-26-18
Level of groundwater 2,0 м 2,0 м 2,0 м 2,0 м 2,0 м 2,0 м 2,0 м 2,0 м 2,0 м
A
Reconstruction of PTL 110 kV
ПОДЗЕМНЫЕ ВОДЫ АГРЕССИВНЫ SURFACE WATER ARE NOT MET Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
Engineering-
Drawn Vornic 26.05.14 Stage Sheet Sheets
geology EGE I - Conventional number of ground 45
EGE II - Conventional number of ground 25 - Loam Checked Vasilkovskaya 09.06.14 Arrangement of pylons WD 10 13
Silty clay Approved Chabanov 16.06.14
Arrangement of pylons
on the profile of the right-of-way from
pylon №353(34) to pylon №401(1) ENERGOPROIECT
Scale h. 1:5000, v. 1:500
The reproductio n, distribution and u tilization of this document as well as the communication of its contents to others without express auth orization are prohibited.
№№
in Unit 1 2 3 4
Works name Quantity
or. measure Mounting of wires 3АС-120/27+3АС-150/24( wire АС-150/24
it is reused) 0,560
1 2 3 4 including at the crossings:
Offenders will be held liable for the payment of damages. All rig hts reserved in the event of the g ran t of the patent, utility mo del or design.
Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
2498-301-26-19.2
A
Reconstruction of PTL 110 kV
Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Arrangement of pylons
Inv. No. Sign
WD 12 13
Approved Chabanov 16.06.14
PTL 110 kV
2
1 Cutting down bushes around foundation 100m 5,6
Offenders will be held liable for the payment of damages. All rig hts reserved in the event of the g ran t of the patent, utility mo del or design.
m3
2 Completing work with soil manually 120,4
m3
3 Putting back soil 70
m2
4 Hewing off the concrete chips and cleaning the surface 112
m2
5 Cleaning rust from the fittings 8,4
m2
6 Treating with the rust convertor 8,4
m2
7 Covering the fittings with special coating 8,4
m2
8 Treating the coating with composition like Sopro 134,4
m2
9 Making and installing the timbering 25,2
10 Installing the mesh reinforcement kg 154
m3
11 Making the concrete adding special additives for increasing durability 28
m3
12 Putting the concrete 28
m2
13 Treating new concrete surface with composition like Sopro 252
m2
14 Covering the surface with polyethylene film 201,6
m2
15 Water proofing of concrete surface by smearing 201,6
m2
16 Cleaning the tower’s end cap of rust 539
m2
17 Treating the end cap with rust convertor 539
m2
18 Covering the end cap with special coating and painting it 539
19 Cleaning the end cap’s body pcs. 140
Mutual inv. No.
Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
Signature and date
2498-301-26-20
Reconstruction of PTL 110 kV
A
Rev. Sheet Docum. № Signature Data
Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Arrangement of pylons
Inv. No. Sign
WD 13 13
Approved Chabanov 16.06.14
Sсope of work
ENERGOPROIECT
for foundation reparation