You are on page 1of 17

Institute of research, design and tehnologie

“ENERGOPROIECT”
LICENCE seria A MMII Nr. 042209 from 14 june 2013

Оbject № 2498

WORKING DESIGN

Reconstruction of PTL 110 kV Hyncheshty - Kneazevca

2. Drawings

Pylons and foundations


(2498-302-25)

Principal engineer of institute Carmanskiy S.

Principal engineer of project Chabanov D.

city Chishinau
2014 year
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

List of common data sheets


Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

Sheet Name Note

20.1 List of common data sheets

20.2 List of the main set of drawings

The project is designed in accordance with the applicable rules and regulations,
compliance with measures ensuring the explosion and fire in buildings and structures..

Chief specialist Chabanov


Signature and date Mutual inv. No.

Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
2498-302-25-20.1
Reconstruction of PTL 110 kV
A
Rev. Sheet Docum. № Signature Data
Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Pylons and foundations 1
Inv. No. Sign

WD 16
Approved Chabanov 16.06.14

Common data (beginning) ENERGOPROIECT


The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

List of the main set of drawings


Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

Sheet Name Notes


20.1-
Common data
20.2
21 List of pylons and foundations
22 Common list of pylons and foundations
23 List of grounding devices
24 Fastening of R/C pylons in the soil
25 The same
26 The same
Adjusting drawing of the foundations under intermediate
27
metal tower №64
Adjusting drawing of the foundations under intermediate
28
metal tower №65
29 Grounding device of vertical grounders for R/C pylons
Grounding device of longitudinal grounders for R/C
30
pylons
31 Connecting of the grounders to R/C pylons
32 Scheme of rejectors installation for intermediate pylons
33 Scheme of rejectors installation for angle-tension pylons
34 Rejectors constructions. Attachment points.
Signature and date Mutual inv. No.

Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
2498-302-25-20.1
Reconstruction of PTL 110 kV
A
Rev. Sheet Docum. № Signature Data
Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Pylons and foundations
Inv. No. Sign

WD 2 16
Approved Chabanov 16.06.14

Common data (end) ENERGOPROIECT


The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

Code 145 146 147 148 265 283 285 286 287 288
Code foundat № of the
Qt. 289 291 292 293 294 295 296 297 298 299
pylon ion per adjusting Pylon number
pyl.
one drawing 300 301 302 303 304 305 306 307 308 309
pylon
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

310 311 312 314 315 316 317 318 319 320
2 3 5 6 7 8 10 11 12 13
321 322 323 324 325 326 327 328 329 330
14 20 21 22 23 24 25 26 27 28
АII - 2498-302- АII - 2498-302-
АР5 25-24,25,26 36 ПБ110-15 25-24,25,26
331 332 333 334 335 337 338 339 340 341 109
АР5
ПБ110-8 30 31 32 33 34 35 36 37 38 39
342 343 344 345 346 347 348 349 350 351
40 41 42 43 44 45
352 354 355 356 357 358 359 360 361 362

AI -«- 16 17 18 19 4 363 364 365 366 367 368 369 370 371 372

48 49 50 51 52 53 54 56 57 58 374 375 377 378 379 380 381 382 383 384

59 60 61 62 66 67 68 70 71 72 387 388 389 390 391 392 393 394 395


АII -
73 74 75 76 78 79 80 81 82 83 63 227 233 250 251 254 256 258 282 278 10
АР5
ПСБ110-1 -«-
АII –
АР6
264 1
84 85 86 87 88 89 90 91 92 95
AII-
УБ110-7 -«- 115 136 271 313 4
96 97 98 99 100 101 102 103 104 105 AP6-1
2498-302-
П110-5В+4 Ф1-2 25-27
64 1
106 107 108 109 110 111 112 113 114 116
П110-5В+4 Ф2-2 -«- 65 1
117 118 119 120 121 122 123 124 125 126

ПБ110-15 127 128 129 130 131 132 133 134 135 137

138 139 140 141 142 143 144 149 150 151

152 153 154 155 157 158 159 160 161 162
AI -«- 198
163 164 165 166 167 168 169 170 171 172

173 174 175 176 177 178 179 180 181 182

183 184 186 187 188 190 191 192 194 195
Mutual inv. No.

196 197 198 199 200 202 203 204 205 206

208 209 210 211 212 213 215 216 217 218
Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
219 220 221 222 223 225 226 228 229 230 License: Seria A MMII Nr 042209 from 14 June 2013
Signature and date

231 232 234 235 236 237 238 239 240 242
2498-302-25-21
A
Reconstruction of PTL 110 kV
243 244 245 246 247 249 252 253 255 259
Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
260 261 262 263 266 267 268 269 270 272 Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Pylons and foundations
Inv. No. Sign

WD 3 16
273 274 275 276 277 279 280 281 Approved Chabanov 16.06.14

List of pylons and foundations ENERGOPROIECT


The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
Common list of pylons

Name Code № drawing Qt., pcs.


3.407-131-10
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

Intermediate R/C pylon ПБ110-15 9495-т1-7 307


Annex N 1.1
11520тм-т1 л.15,16
Intermediate metal tower П110-5В+4 2
Annex N 4.2
3082тм-т2-7б
Intermediate R/C pylon ПБ110-8 9561тм-т1-25 40
Annex N 1.2
3083тм-т2-27а,32
Intermediate R/C pylon ПСБ110-1 9561-тм-т1-10 11
Annex N 1.3
9474тм т1-4,27
Angle-tension R/C pylon УБ110-7 9561тм-1-29 4
Annex N 2.1

Common list of foundation and elements

Name Code № drawing Qt., pcs.


7271тм –т5-22
Girth rail АР 5 155
Annex N 5.1
7271тм –т5-23
The same АР 6 1
Annex N 5.1
7271тм –т5-24
The same АР 6-1 4
Annex N 5.1
7271тм-т2-40
Foundation Ф1-2 4
2498-302-25-27
7271тм-т2-41
The same Ф2-2 4
2498-302-25-28
Fixture element КР 5 7271тм – т5-43 155

The same КР 6 -«- 5


Mutual inv. No.

Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
Signature and date

2498-302-25-22
Reconstruction of PTL 110 kV
A
Rev. Sheet Docum. № Signature Data
Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14 Pylons and foundations
Inv. No. Sign

WD 4 16
Approved Chabanov 16.06.14

Common list of pylons


and foundations ENERGOPROIECT
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
Type and 1 4 15 46 47 55
(264)
16 17 18 19 (240) (239) (233)
№ (273) (272)
Pylon number drawing Diame 69 77 93 94
of
Qt.
-ter,
Mass 64 65 66 110 111 112
(222) (216) (206) (205)
pcs. metal, kg
growding mm 156
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

device 113 114 115 116 117 118 119 120 147
(166)
of pylon 185 189 193 201 207 214 224 241 248 257
9 (147) (145) (142) (137) (133) (130) (124) (112) (108) (102)
2 3 5 6 7 8 10 11 12
(268)
284
258 264 265 283 285 286 287 288 289
13 14 20 21 22 23 24 25 26 27 2498-302- (84)
25-30 38 16 1720,4 290
29 Type 2 25.2 291 292 293 294 295 296 297 298 299
28 30 31 32 33 34 35 36 37 (80)
(254)
38 39 40 41 42 43 44 45 300 301 302 303 304 305 306 307 308 309

48 49 50 51 52 53 54 56 57 58 310 311 112 313 314 315 316 317 318 319
Normalized resistance is provided by
59 60 61 62 63 67 68 70 71 72 320 321 322 323 324 325 326 327 328 329 foundation and pylon without
earthing device
73 74 75 76 78 79 80 81 82 83
336
330 331 332 333 334 335 337 338 339
(47)
84 85 86 87 88 89 90 91 92 95 340 341 342 343 344 345 346 347 348 349

96 97 98 99 100 101 102 103 104 105 353


350 351 352 354 355 356 357 358 359
(34)
106 107 108 109 121 122 123 124 125 126
360 361 362 363 364 365 366 367 368 369
127 128 129 130 131 132 133 134 135 136 373 376
370 371 372 374 375 377 378 379
(21) (19)
137 138 139 140 141 142 143 144 145 146 385 386
380 381 382 383 384 387 388 389
(13) (12)
148 149 150 151 152 153 154 155 157 158 396 397 398 399
390 391 392 393 394 395
(6) (5) (4) (3)
159 160 161 162 163 164 165 166 167 168
400 401
2498-302- (2) (1)
169 170 171 172 173 174 175 176 177 178 25-29 201 16 4502,4
Type 1 22.4 Total 16 6204,8
179 180 181 182 183 184 186 187 188 190

191 192 194 195 196 197 198 199 200 202

203 204 205 206 208 209 210 211 212 213
Signature and date Mutual inv. No.

215 216 217 218 219 220 221 222 223 225

226 227 228 229 230 231 232 233 234 235
Contractor: SE ENERGOPROIECT
236 237 238 239 240 242 243 244 245 246 Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
247 249 250 251 252 253 254 255 256 259 2498-302-25-23
260 261 262 263 266 267 268 269 270 271 Reconstruction of PTL 110 kV
A
272 273 274 275 276 277 278 279 280 281 Rev. Sheet Docum. № Signature Data
Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
282 Checked Vasilkovskaya 09.06.14 Pylons and foundations
Inv. No. Sign

WD 5 16
Approved Chabanov 16.06.14

List of grounding devices ENERGOPROIECT


The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
Fastening with piled up mounds
А. Fastening in soils with unbroken structure
B. The main soil has the structure that is not damaged
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

Type I Type II
Вб Вб
Type I Type II Type III

Ур

Ур


Ур

h

Ур
h

h
h

h
d d d см
d d
D D D
D D

1. At supporting reinforced concrete pillars girth rails must be installed G. The main soil has damaged structure
perpendicularly to the traverses.
2. At angle-tension r/c pylons girth rails must be installed perpendicularly to the Type I Type II
traverses from the inner side of the corner. Вб
Вб

Ур

Ур


V. Fastening in the soils with damaged structure a1
a1

Ур1

Ур1
Mutual inv. No.

TypeI Type II Type III Type IV


d
d
>a1 D
>a1 D
Ур

Ур

Ур
Ур

Attached №2498-302-25-24
Signature and date

a1
h

Drawn Vornic 26.05.14


Ур1

Checked Vasilkovskaya 09.06.14

Inv. №
d d d d

200 200 200 200 200 200 >a1 200


Inv. No. Sign

Sheet
9653тм

The explanatory note 6


The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

Fastening scheme
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

Fastening Cylinder racks with diameter 560 mm and


Cone-formed racks with big diameter 650 mm Cylinder racks with diameter
scheme cone-formed racks with diameter 560 mm 800 mm
Ур, m Ур1, m Вб min,m Ур, m Ур1, m Вб min,m У р, m
h, m hб, m h, m hб, m h, m
АР-5 АР-6 АР-5 АР-6 АР-5 АР-6 АР-5 АР-6 АР-5 АР-6 АР-5 АР-6 АР6-1 АР-8

АI 3,0 --- --- --- --- --- --- --- 3,0/3,3 --- --- --- --- --- --- --- 4,0 --- ---
А II 3,0 0,2 0,25 --- --- --- --- --- 3,0/3,3 0,2 -/0,25 --- --- --- --- --- 4,5 0,25 0,32
А III 3,0 0,4 0,5 --- --- --- --- --- 3,0 0,4 0,5 --- --- --- --- --- 4,0 0,5 0,64
БI 3,0 -0,2 -0,25 --- --- 1,2 3,5 4,0 3,3 -0,2 -0,25 --- --- 1,2 3,5 4,0 --- ---
Б II 2,0 -0,6 -0,75 --- --- 2,0 3,5 4,0 2,3 -0,5 -0,75 --- --- 2,0 3,5 4,0 --- ---
BI 3,0 0,7 --- --- --- --- --- 3,3 0,7 --- --- --- --- --- --- ---
B II 3,0 0,7 --- --- --- --- --- 3,3 0,7 --- --- --- --- --- --- ---
B III 3,0 0,9 --- --- --- --- --- 3,3 0,7 --- --- --- --- --- --- ---
B IV 3,0 0,9 0,2 0,25 --- --- --- 3,0/3,3 0,9 0,9 --- --- --- --- --- --- ---
ГI 2,0 -0,4 -0,5 0,2 0,25 1,6 3,5 4,0 2,3 -0,4 -0,5 0,2 0,25 1,6 3,5 4,0 --- ---
Г II 2,0 -0,6 -0,75 0,2 0,25 2,0 3,5 4,0 2,3 -0,6 -0,75 0,2 0,25 2,0 3,5 4,0 --- ---

Height
Type of girth rail Length l, m Width b, m
h, m
АР-5 3,0 0,4 0,2
Mutual inv. No.

АР-6 (АР6-1) 4,0 0,5 0,2

АР-8 6,0 0,64 0,35


Attached №2498-302-25-25
Drawn Vornic
Signature and date

26.05.14
Checked Vasilkovskaya 09.06.14

Inv. №
Inv. No. Sign

Sheet
9653тм

The explanatory note 7


The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

Scope of soil work when installing fastenings in drilled ditches


АI А II А III БI Б II
Name of work Un. СК4-СК7, СЦ8- СК 22 СК 22
СК 22 СК 26 СЦ20
СК14 СЦ11-1 СК 22 СК 26 СК 22 СК 26 СЦ20
СЦ 20 СК4-СК7 СЦ 20 СК4-СК7

Drilling the ditch p.11 3,0 3,3 3,0 4,1 3,0 3,3 4,5 3,0 3,3 4,0 3,0 3,3 2,0 2,3
Filling the hollows with 3
m 0,5 0,6 0,6 1,1 0,7 0,8 1,9 0,9 1,0 2,0 0,5 0,6 0,3 0,5
the mix of gravel with sand
3
Rammed clay riprap m 0,2 0,2 0,2 0,3 0,2 0,2 0,3 0,2 0,2 0,3 --- --- --- ---
3
Manual АР-5 m --- --- --- --- 0,4 0,4 --- 0,7 0,7 1,2 --- --- --- ---
recess for АР-6 m
3
--- --- --- --- 0,5 0,5 0,6 1,1 1,1 1,2 --- --- --- ---
girth rails АР-8 m
3
--- --- --- --- --- --- 2,0 --- --- 4,0 --- --- --- ---
3
Putting away the АР-5 m --- --- --- --- --- --- --- --- --- --- 27 27 63 63
3
mound АР-6 m --- --- --- --- --- --- --- --- --- --- 33 33 74 74

ВI В II В III В IV ГI Г II
Name of work Un.
СК 22 СК4-СК7 СК 22 СК4-СК7 СК 22 СК4-СК7 СК 22 СК4-СК7 СК 22 СК4-СК7 СК 22 СК4-СК7

Recces m
3
21 30 21 30 21 30 32 41 15 21 15 21

Putting back soil m


3
20 29 20 29 20 29 31 40 14 20 14 20

Putting away the АР-5 m 3 --- --- --- --- --- --- --- --- 43 43 63 63
mound АР-6 m 3 --- --- --- --- --- --- --- --- 51 51 74 74
Mutual inv. No.

Attached №2498-302-25-26
1. The tables of scope of soil work are created for fastening according to the
Signature and date

Drawn Vornic 26.05.14


schemes, accepted as basical. These schemes hav permanent geometric Vasilkovskaya
Checked 09.06.14
sizes of fastening parameters.
Inv. №
Inv. No. Sign

Sheet
9653тм

The explanatory note 53


The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

Section А-А

200±10
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

Pylon's pressmark П110-5В+4 Notes:


1. All the work concerning the installation of
substructures (digging of foundation ditches, installing
Wire's pressmark АС 120/27 substructures, putting the soil back ).
2. Installation of substructures must be fulfilled in the dried
The corner of turning of tha PTL,α 0° ditch according to the given sizes with deviation not
those marked in the drawing.
Region according to sleet appearance IV

2500
3. At putting the foundations on a dry leveled base
semi- there is no need for road-metal preparation.
Soil characteristics drowned 4. After installation and verification of the substructures
the soil must be put back with layers 25-30 сm with

Fundamental
block №1
Kind of substructure Ф1-2 accurate sealing of each layer to the bulk density of 1,6
gr/mі and verifyind soil humidity. It if forbidden to fill
the ditch with sode, turf, sludge, soils with plants or
Quantity for one pylon 2 sludge and other soils with organic substances.
a a
5. When putting the pylons on substructures must be

Dimen- Fundamental
3200±10

sions, mm block №2
Kind of substructure Ф1-2 provided the installation of detents that can fully accept
horizontal installation work.
6. After installation of the pylon on the substructures the
Quantity for one pylon 2 shims of anchor bolts must be welded to the pylon base.
The plan of substructures locating a 1200

Backfill, м3Recces, м3
Clay 80
Fundamental block №1 a Fundamental block №2
Loam --

Soil work
Axis PTL

Clay 80
a

Loam --

Planning the soil, m² 7,6

1600
Road-metal preparation, m³ 1,3
A A Pumping with the flow of water
not more than 30 m³ /hour, m³ 28

Axis of crossarms 3200±10 № pylon 64


Mutual inv. No.

1600

Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
Signature and date

2498-302-25-27
100

A
Reconstruction of PTL 110 kV
100

Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca


Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14
100 Pylons and foundations
Inv. No. Sign

1600 1600 100 WD 9 16


Fundamental block №1 Fundamental block №2 Approved Chabanov 16.06.14

3200±10 Adjusting drawing of the foundations


under intermediate metal tower №64 ENERGOPROIECT
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

Section А-А
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

200±10
Pylon's pressmark П110-5В+4 Notes:
1. All the work concerning the installation of
substructures (digging of foundation ditches, installing
Wire's pressmark АС 120/27 substructures, putting the soil back).
2. Installation of substructures must be fulfilled in the dried
The corner of turning of tha PTL,α 0° ditch according to the given sizes with deviation not
those marked in the drawing.
Region according to sleet appearance IV

2500
3. At putting the foundations on a dry leveled base
Road-metal preparation there is no need for road-metal preparation.
Soil characteristics drowned 4. After installation and verification of the substructures
the

Fundamental
Ф2-2 soil must be put back with layers 25-30 сm with accurate

block №1
Kind of substructure

100
sealing of each layer to the bulk density of 1,6 gr/mі and
verifyind soil humidity.
Quantity for one pylon 2 5. It if forbidden to fill the ditch with sode, turf, sludge,
150 a 150 150 a 150
soils with plants or sludge and other soils with organic

Dimen- Fundamental
3200±10 Ф2-2

sions, mm block №2
Kind of substructure substances.
6 When putting the pylons on substructures must be
provided the installation of detents that can fully accept
Quantity for one pylon 2 horizontal installation work.
The plan of substructures locating 7 After installation of the pylon on the substructures the
a 1500 shims of anchor bolts must be welded to the pylon base.

Backfill, м3Recces, м3
Clay 160
Fundamental block №1 a Fundamental block №2
Loam --

Soil work
Axis PTL

Clay 160
a

Loam --

Planning the soil, m² 13,2

Road-metal preparation, m³ 1,3

1600
A A Pumping with the flow of water
not more than 30 m³ /hour, m³
112

Axis of crossarms 3200±10 № pylon 65


Mutual inv. No.

1600

Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
Signature and date

2498-302-25-28
100

A
Reconstruction of PTL 110 kV
100

Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca


Drawn Vornic 26.05.14 Stage Sheet Sheets
Checked Vasilkovskaya 09.06.14
100 Pylons and foundations
Inv. No. Sign

1600 1600 100 WD 10 16


Fundamental block №1 Fundamental block №2 Approved Chabanov 16.06.14

3200±10 Adjusting drawing of the foundations


under intermediate metal tower №65 ENERGOPROIECT
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

The consumption of metel and the scope


Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

of work for one pylon


Equivalent The length of
Type of Critic resistance
resistivity of the the vertical Round steel Driving in
the of the grounder
soil electrode Ø16 mm vertical
grounder (Om)
(Оm * m) (m) electrodes
м кг (pcs.)

Normalized resistance is provided by


-- <60 foundation and pylon without earthing device
Plan 1 60-100 5 14 22,4 2 10

2 100-140 5 14 22,4 2 15
Axis PTL

3 140-200 10 12 10,8 1 15

4 200-250 15 17 15,3 1 15

5 250-320 20 22 19,8 1 15

Vertical electrodes

Attached №2498-302-25-29
Notes: Drawn Vornic 26.05.14
1. The vertical electrode's length in dependence on ρэ is given in the table. Checked Vasilkovskaya 09.06.14
2. Attaching the grounder to the pylon and connecting its parts with each other must be
done according to the drawing №2498 -302-25-31.
3. The foundation is shown on probation in the drawing. Inv. №
Mutual inv. No.
Signature and date
Inv. No. Sign

Energosetiproect Single-legged R/C pylon PTL 110-220 kV.


Department further Grounding device of pylons Typical project
Grounding devices: underground part of the stand Album II ВЛ-II-22
PTL 35-750 kV № 3602 тм
transmission c. Moscow - vertical electrode
The reproduction, distribution and u tilization of this document as well as the communication of its contents to others without express auth orization are prohibited.

Plan The consumption of metel and


the scope of work for one pylon
Equivalent The length of
Type of Critic resistance
resistivity of the the extended Laying the
Offenders will be held liable for the payment of damages. All rig hts reserved in the event of the g rant of the patent, utility mo del or design.

the Round steel of the grounder


soil grounder Ø16 mm extended
grounder (Om)

Axis PTL
(Оm * m) (m) grounders
m кg (pcs.)

Normalized resistance is provided by


<60
foundation and pylon without earthing device
1 60-100 5 14 12,6 10 10
60-100
2 (for double-circuit pylons)
5 28 44,8 20 7,4

3 200-300 10 48 43,2 40 15

4 300-400 15 68 61,2 60 15

5 400-500 20 88 79,2 80 15

Longitudinal electrodes 6 500-650 25 108 97,2 100 15

7 650-800 30 128 115,2 120 20

8 800-1000 20
40 168 151,2 160
9 1000-1400 30

10 1400-1800 50 208 187,2 200 30

11 1800-2100 60 248 223,2 240 30

Notes
1. The longitudinal electrode's length in dependence on ρэ is given in the table.
2. The depth of laying of the longitudinal grounders - 0,5 м, into the cropland- 1,0 м.
3. Attaching the grounder to the pylon and connecting its parts with each other must be done
according to the drawing №2498 -302-25-31.
4. The foundation is shown on probation in the drawing. Attached №2498-302-25-30
Drawn Vornic 26.05.14
Mutual inv. No.

Checked Vasilkovskaya 09.06.14

Inv. №
Signature and date
Inv. No. Sign

Energosetiproect
Grounding device of pylons Single-legged R/C pylon PTL 110-220 kV. Typical project
Department further Album II ВЛ-II-26
PTL 35-750 kV Grounding device of longitudinal electrodes № 3602 тм
transmission c. Moscow
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibi

Figure 1 Figure 2 Figura 3


Connecting to the shoe Connecting to the embedded Connecting to
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

(bottom end cap) of the pylon. plates of the rack the pylon guy

Welding
1

3 Wedge socket
Embedded
Grounders plates

Anchor

Grounders Grounders

Notes:
About fig.1 About fig.3
Plank (position1) Plank (position 3) 1. When connecting the groundings made of round steel the length
of the weld must be not less than six diameters.
60 70 2. If realeasable conection is not necessary, the grounder must be
30 35 welded directly to the embedded plates of the rack (fig. 2).
3. If zinc-coated elements are used at the pylons, the details of
connection of the grounders must be also zinc-coated.
30

35

d29
130

The diameter of the hole


for 2 mm is larger than
195
Mutual inv. No.

the anchor bolt


Attached №2498-302-25-31
Drawn Vornic 26.05.14
100

Checked Vasilkovskaya 09.06.14


Signature and date

Inv. No
Inv. No. Sign

Energosetiproect
Department further Pylons grounders PTL 35-750 kV Connecting the grounders to reinforced concrete pylons Typical project
The album II PTL-II-46
transmission c. Moscow and their connection to each other №3602 тм
ПБ 110-2, ПБ 110-4, ПБ 110-6, ПБ 110-8,
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

ПБ 110-1, ПБ 110-3, ПБ 110-5, ПСБ 110-1, ПБ 110-12, ПБ 110-10, ПБ 150-2, ПБ 110-16


ПБ 150-1, ПБ 220-1, ПБ 220-3, ПУСБ 220-1,
ПБ 110-1, ПБ 110-13, ПБ 110-15, ПБ 150-11
ПСБ 150-1, ПСБ 220-1, ПБ 330-1, ПБ 330-3
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

for110 kV
for 150-220 kV
for 110 кV
for 150-220 kV

for110 kV for50-220 kV
for150-220 kV Notes:
for330 kV
for110 kV for110 kV 1. Attachment points of bird rejectors are mentioned in drawing №2498 -302-25-34.
for 150-220 kV for 150-220 kV 2. In intermediate single-rack pylons bird rejectors are installed above each suspension string,
supporting the wire (phase), and also above the hawser that protects from thunderstorms.
for 110 kV
for 150-220 kV

ПБ 330-5н, ПБ 330-7н Attached №2498-302-25-32


Drawn Vornic 26.05.14
Vasilkovskaya
ПБ 220-2, ПБ 220-12 Checked 09.06.14

Inv. №
Mutual inv. No.
Signature and date

12547тм-т1-1
Rejectors installation for intermediate pylons for
PTL 110-330 kV
Stage Sheet Sheets
Scheme of rejectors installation
for intermediate pylons W
Inv. No. Sign

Chiev Shtin
Control Ivanova Energosetiproiect
Engineer Orlova North-Western
Engineer Salita Leningrad
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited.

УБ 110-4 УБ 110-7
УБ 110-2 УСБ 110-2
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

1 1 2 2 4 4 5 5

1-1
2-2 4-4 5-5
Signature and date Mutual inv. No.

Contractor: SE ENERGOPROIECT
Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
2498 -302-25-33
Notes:
Reconstruction of PTL 110 kV
1. Attachment points of bird rejectors are mentioned in drawing №2498 -302-25-33. Rev. Sheet Docum. № Signature Data Hyncheshty-Kneazevca
2. In angle-tension pylons rejectors are installed above every suspension string for Drawn Vornic Stage
26.05.14 Sheet Sheets
leading round the loop and above every loop that freely goes under the traverse, and Checked Vasilkovskaya 09.06.14 Pylons and foundations
Inv. No. Sign

also above the hawser that protects from thunderstorms . Approved Chabanov 16.06.14
WD 15 16

Scheme of rejectors installation for


angle-tension pylons ENERGOPROIECT
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express authorization are prohibited. 20 350
4

20
130 90

Ø15
50*
Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of the patent, utility model or design.

5
2
14 46

5*
12

Ø8

10
A
3
50

45
710*

730*
1

90*

A
10

Notes:
*
Mutual inv. No.

1. *Approximate size.
Specifiction 2. Welding must be done with electrodes Э30.
Quantity 3. All the surfaces must be covered with black paint PF 115.
Number Designation Name Quantity Contractor: SE ENERGOPROIECT
pcs Beneficiary: SE Moldelectrica
License: Seria A MMII Nr 042209 from 14 June 2013
1 Hot-rolled round steel 8 mm kg 2,31
Signature and date

30° 2498-302-25-34
2 Corner 50x50x5 length 0,09 m -«- 0,34
A
Reconstruction of PTL 110 kV
3 The same 50x50x5 length 0,35 m -«- 1,32 Rev. Sheet Docum. № Signature Data
Hyncheshty-Kneazevca
Drawn Vornic 26.05.14 Stage Sheet Sheets
4 Bolt M 12x75 -«- 0,084 Pylons and foundations
Checked Vasilkovskaya 09.06.14
Inv. No. Sign

WD 16 16
Approved Chabanov 16.06.14
5 Screw-nut M12 -«- 0,015
Rejectors constructions. ENERGOPROIECT
Attachment points.

You might also like