INSPECTION AND TEST PLAN- MATERIAL NG-018-XX-PNL-023027
RECEIVING-STRUCTURAL STEEL AND PIPING
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023027 Page 2 of 13
TABLE OF CONTENT
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN- MATERIAL NG-018-XX-PNL-023027
RECEIVING-STRUCTURAL STEEL AND PIPING
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023027 Page 3 of 13
1. GENERAL
1.1. Scope
This ITP defines the Inspection and Test Plan requirements to be fulfilled by
CONSTRUCTION CONTRACTOR for material receiving related to Structural Steel and
piping for OFON Phase 2 Project.
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN- MATERIAL NG-018-XX-PNL-023027
RECEIVING-STRUCTURAL STEEL AND PIPING
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023027 Page 4 of 13
CC – Subcontractor
QC – QC Contractor
CON – CONTRACTOR Construction
CONC – CONTRACTOR Commissioning
TP – Laboratory / Third Party
CPY – COMPANY
1.3. INVOLVEMENT
P Performance Point
ITP Inspection Point identifying the party responsible to perform the activity described.
H Hold Point
ITP Inspection point means that the presence of the concerned party (ies) (COMPANY,IIA) is
mandatory.
Notification to COMPANY for inspection shall be issued by CONTRACTOR. Work cannot
proceed without the concerned party (ies) signing off the inspection activity, unless a waiver has
been received by the CONTRACTOR in writing from COMPANY.
W Witness Point
ITP Inspection point means that the presence of the concerned party (ies) (COMPANY/IIA) is
NOT mandatory.
Notification to COMPANY for inspection shall be issued by CONTRACTOR. If COMPANY does
not wish to attend (or does not attend) the witness point, the CONTRACTOR must proceed with
internal inspection and work can go ahead, without presence of the COMPANY and without
delay.
R Review
ITP Inspection point means that concerned party (ies) (COMPANY, IIA) must check the
CONTRACTOR’s manufacturing documents and review inspection / tests records and
certificates.
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN- MATERIAL NG-018-XX-PNL-023027
RECEIVING-STRUCTURAL STEEL AND PIPING
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023027 Page 5 of 13
S Surveillance Point
ITP Inspection point means that the presence of the concerned party (ies) (COMPANY, IIA) is
NOT mandatory.
No notification is required but COMPANY may carry out inspection / tests at any stage of the
fabrication.
The CONTRACTOR must proceed with internal inspection and proceed with the work provided
that control and tests reports are available to the COMPANY for review.
This Inspection and Test Plan is to be linked with the following documents:
3. APPLICABLE DOCUMENTATION
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN- MATERIAL NG-018-XX-PNL-023027
RECEIVING-STRUCTURAL STEEL AND PIPING
Revision : 01 Status: AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Contractor document number NG-018-XX-PNL-023027 Page 6 of 13
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
COMPANY: TOTAL E&P NIGERIA LIMITED
ITP No NG-018-XX-PNL-023027
PLANT LOCATION: OFON
SHEET No REVISION
PROJECT TITLE: OFON PHASE 2
7 OF 13 01
END OF ITP
COMPANY: TOTAL E&P NIGERIA LIMITED
ITP No NG-018-XX-PNL-023027
PLANT LOCATION: OFON
SHEET No REVISION
PROJECT TITLE: OFON PHASE 2
8 OF 13 01
ITP TB-0001 DISCIPLINE ITEM DESCRIPTION
TITLE:
END OF ITP
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
Document Identification Number
INSPECTION AND TEST PLAN- MATERIAL NG-018-XX-PNL-023027
RECEIVING-STRUCTURAL STEEL AND PIPING
Revision : 01 Status:AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Page 9 of 13
Contractor document number NG-018-XX-PNL-023027
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.
1 of 1
JOB UNIT
COMPANY :
REPORT N:
PLANT LOCATION
QC CODE PROGRESS. N.
RFI –
PROJECT TITLE :
ITP REF.
ST
1 INSPECTION RFI - REQUEST FOR INSPECTION RFI No.
MONTH DAY HOUR MIN
JAN FEB MAR APR 1 2 3 4 5 6 7 8 9 10 11 00 01 02 03 04 05 06 07 08 00 10
MAY JUN JUL AUG 12 13 14 15 16 17 18 19 20 21 22 09 10 11 12 13 14 15 16 17 20 30
SEP OCT NOV DEC 23 24 25 26 27 28 29 30 31 18 19 20 21 22 23 40 50
REFERENCE DRAWING FOR RESULT
No Item ITEM DESCRIPTION
LOCATION POS. NEG.
Note:
QC. SUPERVISOR
COMPANY
QC CONTRACTOR CONTRACTOR
NAME : NAME : NAME :
No. Inspection and test report issued? YES NO Form Code Report number
1 □ □
2 □ □
3 □ □
4 □ □
PNL SILHOUETTE YARD CUSTOMER
TOTAL E&P NIGERIA LIMITED
ISSUER TRUCK Nb :
TAG Nb :
UIN Nb :
PO Item Nb :
EXPECTED Qty :
RECEIVED Qty :
AVAILABLE Qty :
DATE OF RELEASE :
EFFECTIVE ACTION :
COMMENTS :
Name, Signature & Date Name, Signature & Date Name, Signature & Date
Document Identification Number
INSPECTION AND TEST PLAN- MATERIAL NG-018-XX-PNL-023027
RECEIVING-STRUCTURAL STEEL AND PIPING
Revision : 01 Status:AFC
Document Type : PLN System/Subsystem: 00 Discipline: QUA Rev Date : 07-Nov-2012
Page 13 of 13
Contractor document number NG-018-XX-PNL-023027
END OF DOCUMENT
“This document is the property of TEP NG. It must not be reproduced or transmitted to others without written authorization from the Company”.