This document is an inspection report from Boustead Salcon Water Solutions Pte Ltd for a water treatment system package for the 275MW Riau GFPP IPP Project. The report includes certificates of conformity and material certificates for CPVC valves as well as visual and dimensional inspection reports and packing inspection photos.
This document is an inspection report from Boustead Salcon Water Solutions Pte Ltd for a water treatment system package for the 275MW Riau GFPP IPP Project. The report includes certificates of conformity and material certificates for CPVC valves as well as visual and dimensional inspection reports and packing inspection photos.
This document is an inspection report from Boustead Salcon Water Solutions Pte Ltd for a water treatment system package for the 275MW Riau GFPP IPP Project. The report includes certificates of conformity and material certificates for CPVC valves as well as visual and dimensional inspection reports and packing inspection photos.