GOVERNMENT OF INDIA

CENTRAL PUBLIC WORKS DEPARTMENT

ADDENDUM NO. 1

Name of Work: Construction of Steel structure non-residential buildings using pre-engineered construction technology including
development of area and all services complete in all respect including maintenance for five years on EPC basis
at KG Marg (near Asia House) and Africa Avenue (near Sarojini Nagar depot), New Delhi.

NIT No: 05/CE cum ED/RP/NIT/2019-20

1. Insertion: Page 24 of NIT Vol. I


17. The number of persons mentioned on Conceptual Architectural Drawings attached in Vol. III shall be considered
for all calculations like water requirement, STP capacity, furniture requirement etc. as per applicable guidelines/
standards.

18. The capacity of parking (to be provided in each plot) shall be explored fully and necessary hardening by providing
paving blocks shall be done. However, if extra parking is required as per Delhi Building Bye-Laws 2016 (with up to
date correction slips), it shall be provided by CPWD.

19. All the components of the building shall have fire resistance of not less than two hours. In case the item mentioned
in the NIT does not fulfill the two-hour fire rating criteria, the bidder may replace the same with another similar item
with prior approval of CPWD. The Aluminium railings may be suitably replaced with SS-316 railing system if required
by Delhi Fire Services. Nothing extra shall be paid for this.

EE/RPD-I/Kasturba Nagar
Page 2 of 9

2. Insertion: 7 False ceiling (Page 69 of NIT Vol. I)


Metal False ceiling shall be provided from the following options with the prior approval of E-n-C:-

7.1 Linear cell ceiling shall be made out of Aluminium. The assembled cell ceiling panels shall be in size of 600x1200.
The assembled cell ceiling panels shall made out of main blades in 3mm (W) x 20mm (H) in 1200mm (L), installed at
30mm c.c. and cross connected to secondary blades in 9mm(W) x 22mm (H) in 600mm (L) with 375mm pitch. The
assembled cell ceiling panels are then clipped into U-94 carriers in GMS, coated in black enameled finished at
1200mm c.c. Wire clips shall hold the cell ceiling panels into the U-94 carriers. Once the U-94 carriers are installed
then primary angles made out of GMS, type U1040 are cross connected to the U-94 carriers at 1200mm c.c. for lateral
bracing The whole ceiling shall be suspended by M6 threaded rods installed 100mm c.c. All panel modules must be
hinge able through wire clips. Or Equivalent as directed by E-n-C.

7.2 Hook on expanded Metal Mesh Ceiling in 1.2mm GMS. The ceiling panels shall be in size of 600x 600mmx 1.2mm
(thick) galvanized mild steel and Mesh size shall be 20(Length)x10(Width)x2.5mm(Web Width) x 1.2mm( Thickness)
having open area more than 55%. All panels are hooked onto a secondary grid known as U1005 installed at 600mm.
A primary grid of perforated L- Angle in 30x30x1.2mm thick galvanized steel known as U1040 is installed
perpendicularly to hook on profiles at maximum centers at 1200mm. The entire ceiling shall be suspended with M6
threaded rod using Hilti M6 fastener with minimum load of at least 0.5kn per anchor. The system should be in
accordance with Material class A2-s1, do according to EN 13501-01 “non-combustible”. Or Equivalent as directed by
E-n-C.

7.3 S4 linear custom made Multi perforated CNC Cut hook-on ceiling System. The panels are made to
1200(L)x500(W) manufactured out of minimum 0.6 mm thick GMS and hooked on the shorter side. Panels has to be
powder coated in selected RAL finish with minimum 60 microns paint thickness. Panels has to be CNC cut Multi
staggered perforation ranging from 40-60mm dia holes in special designs approved by architect having acoustic
tissue at the back with minimum 0.5 NRC. All panels are hooked onto a secondary grid known as U1005 installed at
shorter side of the panel to ensure individual demounting of panels for easy accessibility of services . A primary grid of
perforated L- Angle in 30x30x1.2mm thick galvanized steel known as U1040 is installed perpendicularly to hook on
profiles at maximum centers at 1200mm. The entire ceiling shall be suspended with M6 threaded rod using Hilti M6

EE/RPD-I/Kasturba Nagar
Page 3 of 9

fastener with minimum load of at least 0.5kn per anchor. The suspension system shall be as per manufacturer
specification. The panels shall include the site cutting / making openings for services e.g. lights for information boards,
smoke detectors, speakers, diffusers, grills etc Or Equivalent as directed by E-n-C.
7.4 “Braided” metal open ceiling single blade open cell ceiling system manufactured from 1mm thick perforated
aluminium blades pressed together. The panel shall have cell size of 33.33 x 33.33 mm. The assembled ceiling shall
be in size of 600x1200 made out of single blades in 1mm (W) x 40mm (H) having perforation of QG 3.5 x 3.5mm and
open area of appx 90 % . The ceiling panels shall be clipped into U-94 carriers in GMS, coated in black finished at
1200mm c.c. Wire clips shall hold the cell ceiling panels into the U-94 carriers. Once the U-94 carriers are installed
then primary angles made out of GMS, type U1040 are cross connected to the U-94 carriers at 1200mm c.c. for lateral
bracing. The whole ceiling shall be suspended by M6 threaded rods installed 1200mm c.c. The panels shall be fully
downward demountable / hinged from the proprietary U 94 carrier section using C 94 spring panels. The system
should be in accordance with Material class A2-s1, d0 according to EN 13501-01 “non-combustible Or Equivalent as
directed by E-n-C.
(Approved Makes of Metal False Ceiling: DURLAM/ ARMSTRONG/ DEXUNE /SAS / DAMPA)

3. Insertion: 3.0 Design Mix Concrete from RMC or Batch Mix Plant (Page 80 of NIT Vol. I)

3.7 The following measures shall be taken by the agency to increase the life cycle of RCC. These shall be in addition
to “crystalline” mentioned on Page-93 of NIT Vol.I.

3.7.1 Cathodic Protection to Steel using Sacrificial Anodes conforming to ASTM B 418 Type II
Sacrificial Anodes Cathodic Protection (SACP), using Sacrificial Galvanic Anodes, shall be installed on the
reinforcement bars. The Anodes shall have the Conformance to ASTM B418 Type II and Zinc Mass of minimum
40 grams per anode. The calculation of number of anodes and their spacing on the reinforcement mesh shall be
min 1 anode installed every 0.5 sqm of steel cage surface area in all below ground re-inforced elements as well as
steel dense sections like columns, beams; and at the rate of 1 anode every 1 sqm in all above ground slabs.
Providing and fixing zinc alloy based galvanic disc type sacrificial anodes (50 mm dia, 18 mm thick) to the
reinforcement. Manufacturer should have TPI certificate from TUV or equivalent internationally reputed TPI
agency for compliance to ASTM B 418 Type II, min. Zinc Content of 40 g per anode, and pH of encasing mortar to

EE/RPD-I/Kasturba Nagar
Page 4 of 9

be min. 12. The product shall pass 500 hours salt spray test as per ASTM B 117. Application shall be done as per
the manufacturer’s instruction, complete as directed by the Engineer in charge.
(Approved Make: GRACE /SUNANDA /BASF)

3.7.2 Steel Protection using corrosion inhibiting Admixtures conforming to ASTM G 109
Non-nitrite based bipolar concrete penetrating corrosion inhibiting admixture shall be admixed in all partially
underground structures, underground tanks etc. at a dose of minimum 3 Kg per cum. of concrete. The admixture
should be accredited by any Government institute/body. Admixture should have evaluated test reports
demonstrating a corrosion rate of zero coulombs after 45 test cycles as per ASTM G 109. pH of admixture should
be highly alkaline in nature with pH>10.5, specific gravity of 0.99 – 1.05, color: light brown.
(Approved Make: GRACE /SUNANDA /BASF)

4. Insertion: 5.1 General (Page 81 of NIT Vol. I)

The lift core shall be constructed in steel structure. However, if proof consultant for structural design appointed by
CPWD, find it necessary, only then RCC core may be acceptable, provided bidder ensures no impact on completion
time of project.
Intermediate columns to break the long spans shall be allowed subject to the recommendation of structural proof
consultant engaged by CPWD and approval of CPWD Architect. From internal side, steel frame or any other part of
steel structure/member should not be visible. It shall be properly covered with the similar material as of internal walls
or false ceiling.

5. Insertion: 4.0 Foundation (Page 80 of NIT Vol. I)

The soil investigation report attached in NIT Vol IV is indicative only. The values of allowable pressure intensity
mentioned in the soil report is for preliminary design only and the agency shall use their own findings before carrying
out the detailed design by conducting extensive geotechnical investigation as per IS code.

6. Insertion: 8.3 Glass Glazing (Page 87 of NIT Vol. I)

EE/RPD-I/Kasturba Nagar
Page 5 of 9

8.3.2 The glass shall have the following properties:-


i. Visual light transmission>= 30%
ii. External Reflection <=13 % ,
iii. Internal Reflection < = 10%
iv. SHGC <= 0.19
v. U – Value 1.6 W/sqm K

7. Form “CA”&“DA” are attached as Annexure-A & B with this document.

8. Form “G” on Page-42 of NIT Vol.I is replaced with the form attached as Annexure-C with this document.

Dated: 31.12.2019 Executive Engineer & Senior Manager


RPD-I, CPWD

EE/RPD-I/Kasturba Nagar
Page 6 of 9

Annexure A

FORM ‘DA’
“PERFORMANCE REPORT” OF WORKS REFERRED IN FORM-CA

1. Name of work / Project & Location


2. Agreement No.
3. Estimated Cost
4. Tendered Cost
5. Date of Start
6. Date of completion
i) Stipulated Date of Completion
(as mentioned in work order)
ii) Actual Date of Completion
7. i) Whether case of levy of compensation Yes/ No.
for delay has been decided or not
ii) If decided:
a. Justified period of extension

b. Amount of compensation levied


for delayed completion, if any.
8. Performance Report (optional)
i) Quality of Work Outstanding /Very Good/Good/Poor
ii) Financial Soundness Outstanding /Very Good/Good/Poor
iii) Technical Proficiency Outstanding /Very Good/Good/Poor
iv) Resourcefulness Outstanding /Very Good/Good/Poor
v) General Behavior Outstanding /Very Good/Good/Poor
Executive Engineer
Dated: or
Equivalent with stamp

Note: This “Performance Report” should be got issued from the authority / client for
whom the work is executed.

EE/RPD-I/Kasturba Nagar
Page 7 of 9

Annexure B

FORM ‘CA’

DETAILS OF ELIGIBLE PRE-ENGINEERED “STEEL BUILDING WORKS” COMPLETED


IN LAST TEN YEARS ENDING PREVIOUS DAY OF LAST DATE OF SUBMISSION OF
BID

NIT No: - 05/CE cum ED/RP/NIT/2019-20

Name of Work: Construction of Steel structure non-residential buildings using pre-


engineered construction technology including development of area
and all services complete in all respect including maintenance for five
years on EPC basis at KG Marg (near Asia House) and Africa Avenue
(near Sarojini Nagar depot), New Delhi.

Name of the firm / Bidder…………………………….

S.No. Details
1. Name of work / project and location
2. Owner or sponsoring organization
3. Cost of work in Rs. in Lakhs
4. Date of commencement as per contract
5. Stipulated date of completion
6. Actual date of completion
7. Total Steel used in structure for this work (in MT)
8. *Litigation/ arbitration cases pending/ in progress with details
Name and Address (Postal & E-mail) / telephone number of
9.
officer to whom reference may be made
10. Whether the work was done on back to back basis

Certified that the above list of works is complete, and no work has been left out and that
the information given is correct to my / our knowledge and belief.
SIGNATURE OF BIDDER(S)
WITH STAMP

*indicate gross amount claimed and amount awarded by the Arbitrator.

EE/RPD-I/Kasturba Nagar
Page 8 of 9

Annexure C

FORM ‘G’

FORM OF EARNEST MONEY DEPOSIT (BANK GUARANTEE BOND)

WHEREAS, Bidder.................. (Name of Bidder) (herein after called "the Bidder") has
submitted his bid dated ............. (date) for the construction of
.............................................. (name of work) (herein after called "the bid")

KNOW ALL PEOPLE by these presents that we ......................................... (name of


bank) having our registered office at ................................... (herein after called "the
Bank") are bound unto EXECUTIVE ENGINEER, INA PROJECT DIVISION, CPWD
NEW DELHI in the sum of Rs. ......................... (Rs. in words
.................................................) for which payment well and truly to be made to the said
EXECUTIVE ENGINEER, INA PROJECT DIVISION, CPWD, NEW DELHI , the Bank
binds itself, his successors and assigns by these presents.

SEALED with the Common Seal of the said Bank this .................day of ................. 2....
THE CONDITIONS of this obligation are:

1) If after bid opening the Bidder withdraws, his bid during the period of validity of
bid (including extended validity of bid) specified in the Form of Bid;

2) If the Bidder having been notified of the acceptance of his bid by the Executive
Engineer & Senior Manager, Redevelopment Project Division-I, New Delhi.

(a) fails or refuses to execute the Form of Agreement in accordance with the
Instructions to Bidder, if required;
or
(b) fails or refuses to furnish the Performance Guarantee, in accordance with
the provisions of bid document and Instructions to Bidder,

We undertake to pay to the EXECUTIVE ENGINEER, INA PROJECT DIVISION,


CPWD, NEW DELHI , either up to the above amount or part thereof upon receipt of his
first written demand, without the EXECUTIVE ENGINEER, INA PROJECT DIVISION,
CPWD, NEW DELHI having to substantiates his demand, provided that in his demand
the EXECUTIVE ENGINEER, INA PROJECT DIVISION, CPWD, NEW DELHI will
note that the amount claimed by him is due to him owing to the occurrence of one or
any of the above conditions, specifying the occurred condition or conditions.

EE/RPD-I/Kasturba Nagar
Page 9 of 9

This Guarantee will remain in force up to and including the date * after the deadline for
submission of bid as such deadline is stated in the Instructions to Bidder or as it may be
extended by the EXECUTIVE ENGINEER, INA PROJECT DIVISION, CPWD, NEW
DELHI notice of which extension(s) to the Bank is hereby waived. Any demand in
respect of this Guarantee should reach the Bank not later than the above date.

Notwithstanding anything contained herein,

1) Our liability under this Bank guarantee shall not exceed Rs________________
(Rupees ______________________________________only)

2) The bank Guarantee is valid up to __________

and

3) We are liable to pay the guaranteed amount or any part thereof under this Bank
guarantee only and only if you serve upon us a written claim or demand on or before
……….. (mention period of the Guarantee as found under clause (ii) above plus claim
period)

DATE ............. SIGNATURE OF THE BANK

WITNESS .................. SEAL


(SIGNATURE, NAME AND ADDRESS)

*Date to be worked out on the basis of validity period of 180 days from the last date of
uploading the bid.
Note: - the proforma given in GCC 2019 for EPC contracts stands superseded by the
above given proforma