Mega Asset Management Co., Ltd. identified two defects in the rebar of bored piles for the pile cap of the Cambodia China Polytechnic University project. The lap length of rebar for pile P6Da and P9F were not enough according to design requirements. Koh Pich Bored Pile was asked to provide the required lap length for these piles, but disapproved the current lengths. Photos showed that two rebar bars were cut too short for P6Da and one was cut at 300mm for P9F, which was not long enough.
Mega Asset Management Co., Ltd. identified two defects in the rebar of bored piles for the pile cap of the Cambodia China Polytechnic University project. The lap length of rebar for pile P6Da and P9F were not enough according to design requirements. Koh Pich Bored Pile was asked to provide the required lap length for these piles, but disapproved the current lengths. Photos showed that two rebar bars were cut too short for P6Da and one was cut at 300mm for P9F, which was not long enough.
Mega Asset Management Co., Ltd. identified two defects in the rebar of bored piles for the pile cap of the Cambodia China Polytechnic University project. The lap length of rebar for pile P6Da and P9F were not enough according to design requirements. Koh Pich Bored Pile was asked to provide the required lap length for these piles, but disapproved the current lengths. Photos showed that two rebar bars were cut too short for P6Da and one was cut at 300mm for P9F, which was not long enough.
A Rebar of bored pile for pile cap 1 Not enough lap length of bored pile P6Da for pile cap KBP Disapprove 2 Not enough lap length of bored pile P9F for pile cap KBP Disapprove
Please refer the ID in the table to the ID in Photo Report below:
Additional Comments (if any)
P6Da and P9F: Koh Pich Bored Pile (KBP) should provide lap length regarding designed
requirement.
Mega Asset Management Co.,Ltd.
Mega Asset Management Co., Ltd. Canadia Tower, 10F, No.315, Ang Duong Street (corner of Monivong Blvd), Phnom Penh, Cambodia
ID LOCATION ON DRAWING (RED ZONE) PHOTO DESCRIPTION ON SITE
200 mm of rebar’s lap length
1
Pile’s head P6Da after cutting
Element: Bored pile P6Da Location: Gridline 6 - D Issue: Rebar of bored pile as lap length in pile cap P6Da is not enough. Two rebar were cut by hydraulic pile breaker during pile’s head breaking. (Main bar diameter are 20 mm) Date: 08.December.2018
Mega Asset Management Co.,Ltd.
Mega Asset Management Co., Ltd. Canadia Tower, 10F, No.315, Ang Duong Street (corner of Monivong Blvd), Phnom Penh, Cambodia
Pile’s head at cut off level
300 mm of rebar’s lap length
Element: Bored pile P9F Location: Gridline 9-F Issue: One bar of Reinforcement cage has cut. The existing length is just 300mm, so total lap length of anchored rebar for pile cap will be not enough. Date: 08.December.2018