Mega Asset Management Co., Ltd.

DEFECT LIST Canadia Tower, 10F, No.315, Ang Duong Street


(corner of Monivong Blvd), Phnom Penh, Cambodia

PROJECT NAME: Cambodia China Polytechnic University (CCPU)


LOCATION: Chroy Chongvar Satellite City, Phnom Penh, Cambodia
PREPARED BY: Nhoek Ren (Mr.)
PHONE / EMAIL: 096 334 5065/ sovannariam999@gmail.com
REFERENCE NUMBER: CCPU-DFL-008
DATE: January 08, 2019
ATTENTION: KBP
CC: Mega Asset Management Co., Ltd.

ID COMMENTS/ DESCRIPTION ACTION STATUS


A Rebar of bored pile for pile cap
1 Not enough lap length of bored pile P6Da for pile cap KBP Disapprove
2 Not enough lap length of bored pile P9F for pile cap KBP Disapprove

Please refer the ID in the table to the ID in Photo Report below:

Additional Comments (if any)

P6Da and P9F: Koh Pich Bored Pile (KBP) should provide lap length regarding designed

requirement.

ID LOCATION ON DRAWING (RED ZONE) PHOTO DESCRIPTION ON SITE

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia

200 mm of rebar’s lap length


1

Pile’s head P6Da after cutting

 Element: Bored pile P6Da


 Location: Gridline 6 - D
 Issue: Rebar of bored pile as lap length in pile cap P6Da is not enough. Two rebar were cut by hydraulic pile
breaker during pile’s head breaking. (Main bar diameter are 20 mm)
 Date: 08.December.2018

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia

Pile’s head at cut off level

300 mm of rebar’s lap length

 Element: Bored pile P9F


 Location: Gridline 9-F
 Issue: One bar of Reinforcement cage has cut. The existing length is just 300mm, so total lap length of
anchored rebar for pile cap will be not enough.
 Date: 08.December.2018

Mega Asset Management Co.,Ltd.