Mega Asset Management Co., Ltd. issued a defect list for the Cambodia China Polytechnic University project. The defect list identifies two issues with the rebar lap length of bored piles P6Da and P9F for the pile cap. Koh Pich Bored Pile did not provide sufficient lap length for the rebar as required by the design. Photos show the cut rebar and remaining lap lengths of 200mm for P6Da and 300mm for P9F, which are not enough. Mega Asset Management requests Koh Pich Bored Pile address the lap length issues to meet design requirements.
Mega Asset Management Co., Ltd. issued a defect list for the Cambodia China Polytechnic University project. The defect list identifies two issues with the rebar lap length of bored piles P6Da and P9F for the pile cap. Koh Pich Bored Pile did not provide sufficient lap length for the rebar as required by the design. Photos show the cut rebar and remaining lap lengths of 200mm for P6Da and 300mm for P9F, which are not enough. Mega Asset Management requests Koh Pich Bored Pile address the lap length issues to meet design requirements.
Mega Asset Management Co., Ltd. issued a defect list for the Cambodia China Polytechnic University project. The defect list identifies two issues with the rebar lap length of bored piles P6Da and P9F for the pile cap. Koh Pich Bored Pile did not provide sufficient lap length for the rebar as required by the design. Photos show the cut rebar and remaining lap lengths of 200mm for P6Da and 300mm for P9F, which are not enough. Mega Asset Management requests Koh Pich Bored Pile address the lap length issues to meet design requirements.
A Rebar of bored pile for pile cap 1 Not enough lap length of bored pile P6Da for pile cap KBP Disapprove 2 Not enough lap length of bored pile P9F for pile cap KBP Disapprove
Please refer the ID in the table to the ID in Photo Report below:
Additional Comments (if any)
P6Da and P9F: Koh Pich Bored Pile (KBP) should provide lap length regarding designed
requirement.
ID LOCATION ON DRAWING (RED ZONE) PHOTO DESCRIPTION ON SITE
Mega Asset Management Co.,Ltd.
Mega Asset Management Co., Ltd. Canadia Tower, 10F, No.315, Ang Duong Street (corner of Monivong Blvd), Phnom Penh, Cambodia
200 mm of rebar’s lap length
1
Pile’s head P6Da after cutting
Element: Bored pile P6Da
Location: Gridline 6 - D Issue: Rebar of bored pile as lap length in pile cap P6Da is not enough. Two rebar were cut by hydraulic pile breaker during pile’s head breaking. (Main bar diameter are 20 mm) Date: 08.December.2018
Mega Asset Management Co.,Ltd.
Mega Asset Management Co., Ltd. Canadia Tower, 10F, No.315, Ang Duong Street (corner of Monivong Blvd), Phnom Penh, Cambodia
Pile’s head at cut off level
300 mm of rebar’s lap length
Element: Bored pile P9F
Location: Gridline 9-F Issue: One bar of Reinforcement cage has cut. The existing length is just 300mm, so total lap length of anchored rebar for pile cap will be not enough. Date: 08.December.2018