Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao, Cagayan
Date : October 13, 2020
The following are the quality inspection and testing that we had undertaken yesterday, Oct. 12,
A.
2020.
Remarks:
Internal vibrator is used to compact concrete.
For PC railings, exposed side's chamfering will be done after cured and removed in forms.
Casted: 6 pcs PC Wall (30 pcs total casted), 24 pcs PC Railings (252 pcs total)
QUALITY CONTROL INSPECTION REPORT
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao, Cagayan
Date : October 13, 2020
The following are the quality inspection and testing that we had undertaken yesterday, Oct. 12,
B.
2020.
Remarks:
PC coping beam need to have roughen inner surface and smooth outer surface.
QUALITY CONTROL INSPECTION REPORT
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao, Cagayan
Date : October 13, 2020
The following are the quality inspection and testing that we had undertaken yesterday, Oct. 12,
C.
2020.
Remarks:
Coping beam was chipped until riser's reinforcement.
Delivered 11G1 was delivered to site but not yet installed due to conflict of dowel orientation.