You are on page 1of 3

QUALITY CONTROL INSPECTION REPORT

Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao, Cagayan
Date : October 13, 2020

The following are the quality inspection and testing that we had undertaken yesterday, Oct. 12,
A.
2020.

Activity : Concreting of PC Wall Activity : Concreting of PC Wall


Date : October 12, 2020 Date : October 12, 2020

Activity : Concreting of Precast Railings Activity : Concreting of Precast Railings


Date : October 12, 2020 Date : October 12, 2020

Remarks:
Internal vibrator is used to compact concrete.
For PC railings, exposed side's chamfering will be done after cured and removed in forms.
Casted: 6 pcs PC Wall (30 pcs total casted), 24 pcs PC Railings (252 pcs total)
QUALITY CONTROL INSPECTION REPORT
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao, Cagayan
Date : October 13, 2020

The following are the quality inspection and testing that we had undertaken yesterday, Oct. 12,
B.
2020.

Finishing of PC Coping Beam for Finishing of PC Coping Beam for


Activity : Pier 14 (Outer) Activity : Pier 14 (Inner)
Date : October 12, 2020 Date : October 12, 2020

Preparation for Formworks of Preparation for Formworks of


Activity : Coping Beam at Abutment A Activity : Coping Beam at Abutment A
Date : October 12, 2020 Date : October 12, 2020

Remarks:
PC coping beam need to have roughen inner surface and smooth outer surface.
QUALITY CONTROL INSPECTION REPORT
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao, Cagayan
Date : October 13, 2020

The following are the quality inspection and testing that we had undertaken yesterday, Oct. 12,
C.
2020.

Preparation for Grout Pouring at PSC Girder Installation at Pier 7-


Activity : Pier 10 Activity : 8 (11G3)
Date : October 12, 2020 Date : October 12, 2020

Activity : Delivered PSC Girder (11G1) Activity :


Date : October 12, 2020 Date : October 12, 2020

Remarks:
Coping beam was chipped until riser's reinforcement.
Delivered 11G1 was delivered to site but not yet installed due to conflict of dowel orientation.

Prepared By: Checked and Verified by:

JUNE KRISTIAN ESICO JAY MAR T. ISORENA


QC Engineer Materials Engineer