Jhabua Power Limited Bop PM Compliance May-2020 S.No Doc No. JPL/MTP/PM/07/17 Date PTW No PTW Issued by Remarks Area Equipment BOP
Jhabua Power Limited Bop PM Compliance May-2020 S.No Doc No. JPL/MTP/PM/07/17 Date PTW No PTW Issued by Remarks Area Equipment BOP
1 BOP 1 1-May-20
LDO Unloading Pump B incuding assoiciated valves
2 BOP TG Air Washer Building Ventilation Fan4 - Water 1 1-May-20
Pump system
3 BOP Make Up pump A 1 2-May-20
42 BOP 1 19-May-20
LDO Unloading Pump A incuding assoiciated valves
43 BOP AHU -2 TG 8.5 M 1 19-May-20
44 FIRE FIGHTING Boiler Fire Booster Pump-1 (Motor Driven) 1 20-May-20
45 FIRE FIGHTING Boiler Fire Booster Pump-2 (Diesel Driven) 1 20-May-20
46 RWPH Raw Water Pump -A 1 21-May-20
57 BOP 1 29-May-20
CWP SCREEN/GATE SYSTEM HOIST ELECTRIC HOIST
58 BOP ESP AHU-6 1 29-May-20
59 BOP AHU -7 TG 24 M 1 30-May-20
60 IDCT Fan and GB (5 & 6) with Motor 1 30-May-20
61 BOP AHU -7 TG 24 M 1 31-May-20
62 IDCT Fan and GB (5 & 6) with Motor 1 31-May-20
Total Submission
Total 62
Balance