PBJV GROUP SDN. BHD.

JOB HAZARD ANALYSIS


HOW TO USE THIS FORM Installation / Facility Platform
1) Crew performing task review ALL generic JHA considerations. Location
2) Review previous JHA update(s) for useful information which will help this task Associated Work Permit Type Hot Work Permit
3) Create new JHA update with generic form and ALL considerations for this task. Associated Work Permit Number N/A
4) Carry out task as per plan. If any conditions change---STOP & RE-ASSES. Electrical Isolation Certificate Number N/A
5) File JHA update for future reference. Physical Isolation Certificate Number N/A
WORK ACTIVITY Painting (Generic) JHA Cross-Reference Number PBJV/JHA-010

Job Step Description of Job Step Potential Hazard/s L S R Control / Recovery Measures L S R Result

1. Fill-up paint into painting pot. - Toxic materials, fier and explosion from 2 2 4 - Wear respirator. Do the work in open 1 1 1 - Acceptable
built-up fumes area/have good ventilation system. Clear
worksite from any combustible materials.

2. Carry out painting work. - Toxic fumes/dust inhalation slip and fall. - Wear respiratory protection/protective
clothing. Barricade the area with warning - Acceptable
2 2 4 1 1 1
signages. Do not do painting near hot work
area.
- Fall from height 2 3 6 - Proper scaffolding platform/safety harness 1 1 1 - Acceptable

- Flying particles 2 2 4 - Wear hand gloves 1 1 1 - Acceptable

3. Clean-up/remove masking tapes - Sharp tools/edges 2 2 4 - Wear hand gloves 1 1 1 -Acceptable

L - LIKELIHOOD S – SEVERITY R -RATING RESULT


CATEGORY DEFINITION CATEGORY DEFINITION H 3 6 9 6-9 UNACCEPTABLE
LOW 1 Remote LOW 1 No Injury No Damage No Pollution M 2 4 6 3-4 TOLERABLE
MEDIUM 2 Possible MEDIUM 2 First Aid Injury Minor Damage Minor Pollution L 1 2 3 1-2 ACCEPTABLE
HIGH 3 Probable HIGH 3 Lost Time Injury Major Damage Major Pollution L M H
IS THERE A SEFER WAY TO COMPLETE THE JOB? ARE THERE ALTERNATIVE WITH LESS RISK? LIKELIHOOD