You are on page 1of 2

Jotun Non-Conformance Report

Date: 19-04-2020 Report No: CPP- 01

Project Name: Ras Markaz Crude Oil Park Project- Duqm

Contractor / Phone
CPP Email
Applicator No.
Phone
Jotun CA BICHU RB
No.
95508150 Email retnab@jotun.com

Phone
Applicator Supervisor Email
No.

Site / Work Location Ras Markaz / Duqm Plant ID Number:

Drawing No. / Tank Number - 713-T401A / Specification no 9686-8360-SP-000-2503 Rev A1,


Specification Painting system L1
Reference:

Weld joints on roof plates are coated Tankguard 412 without proper Surface
Description of
Surface Treatment / preparation.

Coating Non
Conformance

Minimum surface Preparation requirement is ISO 8501 Sa 2.5 - Near White metal

Surface Treatment / blasting for Tankguard 412.


Coating Specification
Requirements

All newly coated weld joints and damaged areas need to be reblasted to
The following
rectification is ISO 8501 Sa 2.5.

required to clear this


Jotun Representative will inspect prepared area before coating application.
NCR

Jotun Performance Coatings Inspection Form L Non-conformance Report Rev


Page 1 of 2
Applicator /
Contractor Response

Final Results as Yes No


observed by Jotun NCR Cleared
CA

Name Date Signature Print Name

Applicator Rep.

Contractor Rep.

Manufacturer Rep. 19-04-2020 BICHU RB

Client Rep.

Jotun CA BICHU RB Sign Name:

Date: 19-04-2020

Jotun Performance Coatings Inspection Form L Non-conformance Report Rev


Page 2 of 2

You might also like