This production handover form documents the transfer of equipment, drawings, and documentation from engineering to production for a new product. It lists 10 items being handed over including cutters, jigs, patterns, test rigs, approved drawings, bills of materials, validation reports, supplier details, and process flows. The form requires sign off from those handing over and receiving the production transfer.
This production handover form documents the transfer of equipment, drawings, and documentation from engineering to production for a new product. It lists 10 items being handed over including cutters, jigs, patterns, test rigs, approved drawings, bills of materials, validation reports, supplier details, and process flows. The form requires sign off from those handing over and receiving the production transfer.
This production handover form documents the transfer of equipment, drawings, and documentation from engineering to production for a new product. It lists 10 items being handed over including cutters, jigs, patterns, test rigs, approved drawings, bills of materials, validation reports, supplier details, and process flows. The form requires sign off from those handing over and receiving the production transfer.
Sl.No. Details Handed over to Date 1 Cutters 2 Jigs & Fixtures 3 Patterns & its Locations 4 Test Rigs 5 Customer approved GA Drawings 6 Process Drawings 7 BOM 8 Copy of Validation reports 9 Supplier details 10 Process flow for each item