Professional Documents
Culture Documents
ASSIGNMENT:
REPORT ON SITE VISIT
SUBMITTED TO:
SIR . MUHAMMAD ASHFAQ
SUBMITTED BY:
AMIR SUHAIL
HAFIZ UZAIR NAEEM UD DIN
M. Arch
Building address: plot no. 3o block c3 gulberg Lahore
Contractor: Muhammad Rashid builders
Architect: Riaz Ur rehman Associates.
Building use: Mixed used high rise building
Plot size: 4 kanal
No. of basements: 5
No. of floors: 19 floors
Type of foundation: raft foundation 7’ thickness
Type of structure: R.C.C column beam structure with 4.5 inches thick partition wall.
Flooring thickness 2.5"with concrete ratio: 1:2:4
Internal plaster: 1:4 thickness 12mm
External plaster: 1:3 12mm thick
Retaining wall, Column, beam, footing ratios: 1:1.5:3
Column size: basement to 2nd floor is 3'x4'and 3rd to onward is 3'×3'
All soil and waste pipes were of UPVC
All cold and hot water pipes were of polypropylene
Minimum size of hot and cold water pipe 25mm
Dia of soil and waste pipe is from 3” to 4” dia.
UPVC pipe size is 3 inches to 9 inches in dia
1.5" and 1" steel bars in raft footing.
Thickness of slab is 8”
size of beams were 2'×3' and 1'x9"
4 lift containing shear wall 12" thick,
12" thick retaining walls.
Clear height: 8' basement clear space. 10.5’ others floors clear space.
6’ width of stair with 12"tread, 6 inches riser.
Emergency stairs at back with winders U turn type.
2 stairs at mid with 25 steps with full space landing, head room height 7', waist 5
inches with 4/8" bars.
Basements used for parking with Ramp width:30' spiral parabolic ramp type
bifurcated with 7% gradient
2 water tank at basement 20k gallons
Steel plates used as form work.
Folding Steel piping of 2 inches used as scaffolding.
Stuttering used: grating steel.
Parapet at 2nd floor was monolithic to slab.
Splitting HVAC system. Piping system was used as plumbing, electrical and fire
fighting