Date: 16/4/21 Time 10:00 AM Change Over plan From D-10mm DWR to Sq-12mm CWR

Timing Completion Progression


Job by CRANE - 1 Assigned Person Hazard Safety Measure
(In minute) Sequence (In Minute)
Follow Proper SOP, Follow of LOTO if there any,
Stand and By Pass Observe Human Movement, Dismantle all
LCS Operation 5 Anisur
Movement Electrical, Mechanical, Hydraulic and Lubrication
1 5
connection

Lock all the hooks and slings properly, Follow


Linkon, Ibrahim, Anisur, Crane Movement, Falling
# 9 stand to stand 5 Casual 1, Khorshed, Tanvir hazard
Human Movement underneath, Avoid walkway 2 10
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Linkon, Ibrahim, Anisur, Crane Movement, Falling
# 11 stand to stand 5 Casual 1, Khorshed, Tanvir hazard
Human Movement underneath, Avoid walkway 3 15
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Linkon, Ibrahim, Anisur, Crane Movement, Falling
# 12 stand to stand 5 Casual 1, Khorshed, Tanvir hazard
Human Movement underneath, Avoid walkway 4 20
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Linkon, Ibrahim, Anisur, Crane Movement, Falling
# 14 stand to by pass 5 Casual 1, Khorshed, Tanvir hazard
Human Movement underneath, Avoid walkway 5 25
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Humayun Ibrahim, Khorshed, Crane Movement, Falling
# 3 stand to stand 5 Casual 1, Purna hazard
Human Movement underneath, Avoid walkway 6 30
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Humayun Ibrahim, Khorshed, Crane Movement, Falling
# 5 stand to stand 5 Casual 1, Purna hazard
Human Movement underneath, Avoid walkway 7 35
for keeping stands and by pass
# Intermediate Mill all stand base frame greasing (Parallel Job) 15 Casual 1 Spillage Proper House Keeping
# Roughing Mill stock adjustment from beginning (Parallel Job) 10 Humayun Burn Hazard Use of Leather Hand gloves, Safety Goggles
# Intermediate Mill Sampling (motor needs to be given clearance after 25 minutes) 6 Linkon, Ibrahim, Tanvir Burn Hazard Use of Leather Hand gloves, Safety Goggles
Timing Completion Progression
Job by CRANE - 2
(In minute) Sequence (In Minute)

Follow Proper SOP, Follow of LOTO if there any,


Stand and By Pass Observe Human Movement, Dismantle all
LCS Operation 5 Sakib
Movement Electrical, Mechanical, Hydraulic and Lubrication
1 5
connection

Lock all the hooks and slings properly, Follow


Syful, ., Sakib Casual 1 Crane Movement, Falling
# 19-20 Looper Replacement 5 person, Achai hazard
Human Movement underneath, Avoid walkway 2 10
Lock allfor
thekeeping stands
hooks and andproperly,
slings by pass Follow
Syful, ., Sakib Casual 1 Crane Movement, Falling
# 19 stand to stand (Sampling to be done immediately after that) 5 person, Achai hazard
Human Movement underneath, Avoid walkway 3 15
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Tasir, ., Sakib Casual 1 Crane Movement, Falling
# 17 stand to stand 5 person, Achai,Balayet hazard
Human Movement underneath, Avoid walkway 4 20
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Tasir, ., Sakib Casual 1 Crane Movement, Falling
# 16 stand to stand 5 person, Achai,Balayet hazard
Human Movement underneath, Avoid walkway 5 25
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Tasir, ., Sakib Casual 1 Crane Movement, Falling
# 15 stand to stand 5 person, Achai,Balayet hazard
Human Movement underneath, Avoid walkway 6 30
for keeping stands and by pass
Cutting Hazard, Burn
# Pass grinding of Finishing Mill and Roll Cross adjustment (Parallel Job) & 15,16 Sampling 5 Tasir, Syful
Hazard
Use of Leather Hand gloves, Safety Goggles

Timing Completion Progression


Job by CRANE - 3
(In minute) Sequence (In Minute)
Follow Proper SOP, Follow of LOTO if there any,
LCS Operation (** Marked Job will be backed up by Crane 2 & 1 as Mechanical may need Crane Stand and By Pass
1 Sohan
Movement
Observe Human Movement, Dismantle all 1 1
3 After 20 minutes of C/O Starting) Electrical, Mechanical, Hydraulic and Lubrication
Zia, Masud, Balayet,, Akash, Lock all the hooks and slings properly, Follow
# QTB 3 slit entry exit by pass funnel alignment work for Sq-3x12mm (Parallel Job for 20 Crane Movement, Falling
20 Upak, Faruk,Akbar, Zahed,
hazard
Human Movement underneath, Avoid walkway 2 21
minutes) with 12 Nos Cooler and 3 Nos Stripper replacement Kamrul, . for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Syful, ., Sakib Casual 1 Crane Movement, Falling
# 20 stand to stand ** 5 person, Achai hazard
Human Movement underneath, Avoid walkway 3 26
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Syful, ., Sakib Casual 1 Crane Movement, Falling
# 18-19 Looper Replacement ** 5 person, Achai, Balayet hazard
Human Movement underneath, Avoid walkway 4 31
for keeping stands and by pass
Lock all the hooks and slings properly, Follow
Tasir, ., Sakib Casual 1 Crane Movement, Falling
# 18 stand to stand ** 5 hazard
Human Movement underneath, Avoid walkway 5 36
person, Achai,Balayet
for keeping stands and by pass
# F/mill All stand baseframe greasing (Parallel Job) 15 Casual 1 Spillage Proper House Keeping
Cutting Hazard, Burn
# F/Mill Checking, , Roll gap adjustment (2 min) , Ghost Rolling (2min) 4 Tasir, Syful Use of Leather Hand gloves, Safety Goggles 6 40
Hazard
READY TO TAKE FIRST BILLET = 40