Professional Documents
Culture Documents
Risk Assessment
Risk
level
Sr.
Risk Rating
Probability
low 1-
Severity
No Activity Hazards/Risk Hazard Effect 4,
1-5
1-5
. Mid 5-
14
High
15-25
Lack of awareness about Poor execution of
work leads to Personnel structure , failure to
injury follow workplace
Transmission through safety , difficult to
droplets from a close respond in
contact with a possible emergency situation.
COVID-19 infected person.
Lack of awareness on how
to protect yourself against
the infection of COVID-19.
Community spreading
Mobilization of
1 3 5 15 H
manpower
Underground facilities , Electrocution
cave in ,rest restricted Damage to pipeline ,
access , Lack of Lighting , water flooding .
oxygen deficiency , Water
flooding , poor
communication.
2 Excavation 3 3 9 M
Hit to Person.
Misleading of Vehicle
Overturning
Toppling of vehicle
Vehicle accidents
Vehicle
3 Movement Physical Injury 3 3 9 M
At site
Vehicle
3 Movement Physical Injury 3 3 9 M
At site
Construction of
5 3 4 12 M
Retaining Wall
Curing of
6 3 3 9 M
Retaining wall
Curing of
6 3 3 9 M
Retaining wall
Observations / Comments:
Reviewed By Prepared By
IFICATION AND RISK ASSESSMENT HIRA
Risk Assessment
Risk
level
Remark/Sign
Risk Rating
Probability
low 1-
Severity
CONTROL MEASURES 4, Responsibility /ADDITIONAL
1-5
1-5
Mid 5- CONTROL
12
High
15-25
Ensure that self -deceleration should be provided after
entering at site premises.
Ensure Fitness certificate mandatory for all.
Ensure to use mask all the time and keep social distancing.
Deployment of employee from containment zone of COVID
19, shall not be allowed at site.
Ensure that Body temperature monitoring through Thermal
Scanner or other devices to monitor the body temperature of
each employee at entry gate.
Implementing safe distancing (at least 6 Feet) on
camp/accommodation, workplace area, Mess Hall, Rest
Shelters and other Welfare Facilities to avoid spreading of
the virus.
No Hand Shake Policy.
Conduct awareness on how to protect yourself against the
infection of COVID-19 through campaign (posters,
Site
distribution of brochure, HSE Messages). 1 2 2 L
Supervisor,Engg
Social Distancing to be maintained during manual entry at
gate. Person to person shall maintain at least 6 feet’ distance
when stand or moving towards security point at gate itself
Hand sanitization should done before entering at site.
Ensure nose mask and hand gloves using by everyone during
entry at gate
Only inducted worker/ staff shall be deputed at the work
place. All operators, helpers and supervisor have medical
health check-up shall done before safety Inductions.
Fit person should allowed at site.
Not to enter any other place than confined for work
when stand or moving towards security point at gate itself
Hand sanitization should done before entering at site.
Ensure nose mask and hand gloves using by everyone during
entry at gate
Only inducted worker/ staff shall be deputed at the work
place. All operators, helpers and supervisor have medical
health check-up shall done before safety Inductions.
Fit person should allowed at site.
Not to enter any other place than confined for work
Do the
keep the
excavated
soil near
the
Check for any existing underground facilities , shoring must excavation
be provided to avoid sliding of soil , person should enter in area ,
exavaexcavation with adequate PPE'S , If water floodin vehicle
occurs must be drained out prior to enter in to movmovem
exavaexcavation. ent should
nonot be
allowed
near the
excavation
, warning
Site signs
1 2 2 L should be
Supervisor,Engg
displayed,st
a standard
man should
be available
, use
adequate
ppe
Site
1 2 2 L
Continuous Supervision should be there. Supervisor,Engg
Managing traffic by providing safety & traffic signboards,
signalman etc.
Ensure the signal man & banks man near work area.
should not
Site have any
1 2 2 L
Continuous Supervision should be there. Supervisor,Engg bends ,
Managing traffic by providing safety & traffic signboards, scaffolding
signalman etc. erection
Ensure the signal man & banks man near work area. should be
monitored
by
Material Should be transferred from lower level to higher supervisor
level through buckets , experienced person should erect the plumb
scaffolding. checks.
Site
1 2 2 L
Supervisor,Engg
Site
1 2 2 L
Supervisor,Engg
Site
1 2 2 L
Supervisor,Engg
be done in specific time
Site
1 2 2 L
Supervisor,Engg
Prepared By Approved By
Ref/POLP/SCON/ZCIPL/SAF/6.1.2/SWMS-01
REVI-00 29/12/2021
Vehicle entering from COVID Disinfection of machinery, vehicles should done before entering at site, handle, doors
contaminated zone. and seat also disinfections on regular basis. Machine operator also wash hand by
Chances of COVID 19 spreading sanitizer on regular basis.
due to contact of vehicle Ensure that the vehicle is sanitized before entry
Driver will be scanned for temp. His hand will be sanitized.
handle, body and other part.
Driver is wearing Nose mask for Covid-19 will be ensured
Chances of spreading of covid Valid licensee and all legal papers of vehicles will be checked
19 to all worker and staff with All the vehicle will report to security gate
each other contact. Security person will check for all legal documents like RTO registration, insurance,
Uninspected equipment, fitness, driving license etc.
Vehicle checks at Failure of machinery during Documents will be verified by EHS or P&M representative.
2
gate movement, After inspection only vehicle will be allowed to enter at site. Every
Oil leakages, person who will come along with vehicle driver or conductor should
Operator without valid license have completed his safety induction.
or certificates. Vehicle form-11 and necessary all legal
Entry of unfit vehicle document should have valid date need to ensure it.
Vehicle contaminated with In
Covid-19 virus cherry picker two person should allow to work. Do not stand on
cherry picker rallings. Vehicle license holder onlyu allow to drive
vehicle.
Damaged Slings Tool box talk should be conducted before start the activity
Poor Condition of Crane Workman should wear adequate PPE provision
Absence of tag Line Provide compacting surface for machinery movement
High Wind Provide proper area barricading for work
Lower SWL of Crane & Slings Work permit system shall be fallowed
Ensure all tools and Tackles are certified by Third party Inspection
Absence of fall protection Ensure operate having valid driving licenses
Ensure supported packing’s for slings /belt are in correct position
Sharp edges of material Ensure no work will carried out in heavy wind and rain
Breaking of siling, belt Check SWL according to the load chart i.e. for crane, boom lift
Failure of crane Trained signal man should be available for signaling purpose
Erection of bracing Material Striking Safety Sign Boards should be display at conspicuous place of
13
pipes, beams strut Collapse of material erection
Boomlift, Man basket, Rope ladder with fall arrester to be provide for
safe access
Fall of person Install Provision of life line post should be fixed with rafter
severe injury/fatality Ensure horizontal arrangement of life line( PP rope of dia 16 mm)
personal injury/property Provision of tag line should be available for sway the material
damage Workman shall wear the safety harness and anchor with rigid
support
Lifting activity shall be going with gradual speed
Ensure No one comes in under suspended load
Erected rafter should be secured with 12mm guy wire to rigid
support
Secured guy wires shall be highlighted with caution tape
Ensure adequate illumination for work
Activity shall be monitoring under close and continues supervision
Tool box talk should be conducted before start the activity
Heavy Wind Workman should wear adequate PPE provision
Lack of PPE's Provide compacting surface for man & machinery movement
Absence of fall protection ensure area to be barriced to avoid unauthorised entry in work
Material Striking premises.
Work permit system shall be fallowed
Fall of material Ensure no work will carried out in heavy wind and rain
Fall of person Safety Sign Boards should be display at conspicuous place of
severe injury/fatality erectionall lifting equipment are place in designated location and they
Ensure
Erection of purlins, have to maintain good coordination with each other for prevention of
Nut bolt property damage accident.
Do not allow more than two person in single bay.
14
torquing/tightening,
sharp edges lead to personal Ensure no person tand and walk with material on column.
Alignment
injury Do not allow to walk on rafter wih holding a material. Ensure this is
strickly prohibited..
Ensure that safety net catch should be provide wherever necessary.
Man entry strictly restricted below working location. Work permit
should be follow.
Bracing, nut bolt torquing and alignment activituy on height to be
help of cherry picker/Scissor lift.
purlins lifting procedure should be safe and secure by using derik
pully arrangement or farana.
Boomlift, man Basket Or Rope ladder to be provide for safe access
Ensure Provision of life line post should be fixed with rafter
Ensure horizontal arrangement of life line( PP rope above dia 16
Poor Platform for work mm)
Provision of tag line should be available for sway the purlin material,
Damaged Slings Workman shall wear the safety harness and anchor with rigid
support i.e life line
Lack of fall protection Ensure No one comes in under suspended load
Material Striking Ensure adequate illumination for work
Fall of material If activity will be carrying manually, ensure all lifting gears inspected
Fall of person by TPI shall be monitoring under close and continues supervision
Activity
Tool box talk should be conducted before start the activity
Platform provided for work to be imnspected first and then allowed
for workcompacting surface for man & machinery movement
Provide
15 Erection of Wall Girts Provide proper area barricading for work
Slippery Surface for platform Work permit system shall be fallowed
Ensure no work will carried out in heavy wind and rain
Damaged Fall protection Safety Sign Boards should be display at conspicuous place of
Fall of material erection
Ensure SWL of working platform.
15 Erection of Wall Girts
Fall of person Rope ladder or boomlift, man basket to be provide for safe access
Fall of working platform Provision of tag line should be available for away the girts material
severe injury/fatality Workman shall wear the safety harness and anchor with rigid
support i.e life line
property damage Ensure No one comes in under suspended load
Uneven Surface Ensure adequate illumination for work
unauthorised person operated If activity will be carrying manually, ensure all lifting gears inspected
the farana by TPI
Activity shall be monitoring under close and continous supervision
Tool box talk should be conducted before start the activity
Workman should wear adequate PPE provision
Provide proper area barricading for work
Work permit system shall be fallowed
Ensure no work will carried out in heavy wind and rain
Safety Sign Boards should be display at conspicuous place of
Damaged ropes erection
Rope ladder, Boomlift or man basket, Scaffold to be provide for safe
Lack of fall protection access
Ensure Provision of life line post should be fixed with rafter
Absence of ELCB Provide adequate accesss provision system to react to roof.(Fix
scaffolding ladder arrangement)
Poor cables connections Provide safety net wherevere necessary.
Fall of material Follow work permit guidlines.
Fall of person Ensure horizontal arrangement of life line( PP rope of dia 16 mm)
Electrical shock due to joints in Install working platform with help of F-15 crane
cable Check the physical condition of platform before commence the work
Secured lock pins should be provided with both end of platform
Training shall be conducted for platform handling at height for
assigned workman
Workman shall wear the safety harness and anchor with rigid
support i.e life line
Roof sheet Ensure No One comes in under suspended load
16
installation
Ensure adequate illumination for work
Activity shall be monitoring under close and continues supervision
Tool box talk should be conducted before start the activity
the work platofrm provided for reach to work location must be
inspected first and then allowed for work
Provide proper area barricading for work
Uneven Surface Work permit system shall be followed
Absence of ELCB Ensure no work will carried out in heavy wind and rain
Poor electrical connections Safety Sign Boards should be display at conspicuous place of
Sharp edges of sheet sheeting
Boomlift, Scaffold Roof access to be provide for safe access
Fall of material Roof Sheet should be shifted on to the roof by using spredarbar or
Fall of person PP rope
Daily inspection and monitor should be fallowed for lifting tackles
Fall of working platform Ensure provision of life line is fixed on roof with rigid support of
Electrical shock structure
Workman shall wear the safety harness and anchor with life line
All portable power tools shall be inspected before use
Provision of 30 Mamp ELCB shall be provided with electrical panel
Avoid loose material keeping on roof platform to avoid any injury.
Ensure No One comes in under suspended load during sheet lifting
Ensure adequate illumination for work
Activity shall be monitoring under close and continues supervision
Defective Hose & Gauge Tool box talk should be conducted before start the activity
Absence of flash back Arrestor Workman should wear adequate PPE provision
Improper Cylinder Postion Provide proper area barricading for work
Poor of PPE's Work permit system shall be fallowed
Fire Remove all flammable or cumbustible material from location.
Personnel Summary
Activity Holder Details :- Name:
Designation:-
Sign:-
_____________________________
_____________________________
____________________________
Comments and reviews by
PMC/ Client _____________________________
_____________________________
____________________________
NING THAT HAS BEEN GIVEN TO PEOPLE INVOLVED WITH THE WORK
1. Site induction training
2. Job Specific Training
3. Other:-
Any changes,
additions or
deletions made
to this SWMS
are to be
covered with
the above
personnel and
the Principal
Contractors
representative
at a Toolbox
meeting
(Record date
and time of
Toolbox
meeting below):
DATE:- TIME:-
COMMENTS:___
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
__
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
__
SAFETY PRIORITY RISK SCORE.
Is a systematic, standardized approach that places a numeric value to an exposure situation considering the followi
Risk Rating = Severity x Probability
In using the formula, the numerical ratings or weights assigned each factor are based upon the judgment and exper
investigator making the calculation.
The first element, CONSEQUENCE, is defined as the most severe likely consequences of the accident, Fr
points for a catastrophe down through various degrees of Severity .
CONSEQUENCES
Severity Rating
1 Catastrophic Numerous Fatalities , irrecoverable Property damage and productivity
Approximately one single fatality major property damage
2 Fatal
if Hazard is Realized
3 Serious Non Fatality injury , permanent disability
4 Minor Disabling but not permanent injury
5 Negligible Minor abrasion, Bruises, Cuts, first aid type injury
The third element (factor), is the PROBABILITY that, once the hazard-event occurs, the complete accident sequence of eve
with the timing and coincidence to result in the accident and consequences. This PROBABILITY is determined by the CONTRO
place, which will influence the likelihood for the incident to happen. E.g. an operator working at height on a roof has less "chanc
probability) to have an accident if he is trained and works according to well enforced safety instructions, and if there are guards
than if there is no control in place : the controls determine the probability.
Severity
Likelihood 1 2 3 4 5
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
High
Medium
Low
g
ard/ even being realized 5
ng and is not unusual 4
metime in future 3
urs after many years 2
d has never occurred 1
oach to controlling
res if required. Action
sk assessment
OL
ACTIVITY NO. JOB STEP (BREAK THE JOB DOWN INTO STEP)
1 Mobilization of manpower
8 Material Stacking
9 Material Assembly
10 Site Painting
11 Erection of column
12 Erection of rafter
14 Erection of purlins
19 Gas Cutting
20 Welding
21 Grinding
22 Cleaning of Site / Housekeeping
23 In case of Emergency
TYPE OF HAZARD
Hazard Concept Examples
Catching, winding,
pulling in
Falling Materials or
products
*M = Mechanical Hazard: Friction
Insufficiently guarded
machine parts
Parts becoming
projectiles
Irritant
Mutagenic
Reactive/Unstable
*CH = Chemical Hazard:
Reproductive Hazard
Toxic
Carcinogenic
Electrostatic charges
Odor
*PH = Physical Hazard
Parts electrically live
when defective
Vibration
Cold
Ignition sources
*F = Fire Hazards (heat, electrical, etc.)
Weather
Working in closed or
confined spaces or
*S= Special Hazard pits
*S= Special Hazard Working with animals
Arrangement of
manipulation units
Catching, winding
pulling in
eyestrain
*E = Ergonomic Hazards
Repetitive motion
Working materials
Working position
Examples
Abrasion
Slipping hazards
Tripping hazards
Explosive
Sensitizing
Heat
High pressure
Noise
Allergens
Cell Cultures
Parasites
Excessive exertion
Heavy loads
Suitable seats
Work surface