WTP/NSN/T&C/HVAC

PRE-TESTING & COMMISSIONING /TRƯỚC KHI KIỂM TRA VÀ THỬ NGHIỆM


T&C SPLIT AC SYSTEM / T&C HỆ THỐNG ĐIỀU HOÀ KHÔNG KHÍ CỤC BỘ

PROJECT NAME: TRAN PHU WINK HOTEL – 178 TRAN PHU STREET, HAI CHAU DISTRICT, DA NANG Project Code / Mã dự án :
SUB-CONTRACTOR NAME: NSN CONTRUCTION & ENGINEERING JSC. Date / Ngày :

LOCATION / KHU VỰC :


DESCRIPTION WORK / MÔ TẢ CÔNG VIỆC:
OPERATING CONDITION / TÌNH TRẠNG VẬN HÀNH :
UNIT NO. / ĐƠN VỊ :
MANUFACTURER / NHÀ SẢN XUẤT :

ITEM RESULT / KẾT QUẢ REMARK /


DESCRIPTION / MÔ TẢ
/MỤC PASSED /ĐẠT FAILED / KHÔNG ĐẠT GHI CHÚ
1 CHECK WORKING AREAS WHERE SHOULD BE T&C / KIỂM TRA KHU VỰC T&C
PREPARE TOOL, TESTER…. /CHUẨN BỊ DỤNG CỤ , MÁY ĐO....
1. Name / Tên : Digital multimeter / Đồng hồ đo điện
Model / Chủng loại : kyoritsu's 1018H or equivalent / kyoritsu's 1018H or tương đương
Serial No / Số sê-ri:
Calibrated Date / Ngày hiệu chỉnh :
2. Name / Tên : Clamp meter / ampe kìm
Model / Chủng loại : Kyoritsu 2117R or equivalent /Kyoritsu 2117R hoặc tương đương
Serial No / Số sê-ri:
Calibrated Date / Ngày hiệu chỉnh :
3. Name / Tên : Pressure Gause / Đồng hồ đo áp suất ga
2 Model / Chủng loại : Tasco TB140SM or equivalent / Tasco TB140SM hoặc tương đương
Serial No / Số sê-ri:
Calibrated Date / Ngày hiệu chỉnh :
4. Name / Tên : Digital Thermometer / nhiệt kế điện tử
Model / Chủng loại : Tasco TA410AX or equivalent / Tasco TA410AX hoặc tương đương
Serial No / Số sê-ri:
Calibrated Date / Ngày hiệu chỉnh :
5. Name / Tên : Vaccuum pump / Bơm hút chân không
Model / Chủng loại : Value VE225N or equivalent / Value VE225N or tương đương
Serial No / Số sê-ri:
Calibrated Date. / Ngày hiệu chỉnh :
MECHANICAL CHECKS
CAREFULLY INSPECT THE UNIT FOR ANT PHYSICAL DAMAGES, DENTS / KIỂM TRA CÁC HƯ
HỎNG VẬT LÍ, CÁC VẾT MÓP
CHECK AND ENSURE THE SHIPPING BOLTS, CLAMPS ARE REMOVED / KIỂM TRA CÁC ĐAI ỐC
DÙNG TRONG QUÁ TRÌNH VẬN CHUYỂN ĐÃ ĐƯỢC GỠ BỎ
ELECTRICAL CHECKS
CHECK FOR PROPER ELECTRICAL CONNECTION BETWEEN THE INDOOR & OUTDOOR UNITS
AND BETWEEN THE OUTDOOR UNIT & POWER SUPPLY/ KIỂM TRA KẾT NỐI GIỮA DÀN LẠNH
VỚI DÀN NÓNG VÀ GIỮA DÀN NÓNG VỚI NGUỒN CẤP
3 CHECK THE CIRCUIT BREAKER IS FIXED CLOSE FOR THE SPLIT UNIT FOR EMERGENCY
POWER SHUT DOWN/ KIỂM TRA CB CÓ PHÙ HỢP VỚI HỆ THỐNG ĐIỀU HOÀ CỤC BỘ ĐẢM BẢO
CẮT ĐIỆN TRONG TRƯỜNG HỢP KHẨN CẤP
INSTALLATION CHECKS

CHECK IF THE INDOOR AND OUTDOOR UNITS ARE INSTALLED AS PER THE APPROVED SHOP
DRAWINGS AND MANUFACTURE'S INSTRUCTIONS / KIỂM TRA LẮP ĐẶT DÀN NÓNG, DÀN LẠNH
THEO BẢN VẼ ĐƯỢC PHÊ DUYỆT VÀ HƯỚNG DẪN CỦA NHÀ SẢN XUẤT

CHECK THE INSTALLATION OF COPPER PIPE, DRAIN PIPE AS PER APPROVED DRAWINGS/
KIỂM TRA LẮP ĐẶT ỐNG ĐỒNG, ỐNG NƯỚC NGƯNG THEO TỪNG BẢN VẼ ĐÃ ĐƯỢC PHÊ DUYỆT

TEST RESULT / KẾT QUẢ KIỂM TRA: (P) PASSED / ĐẠT (NP) NOT PASSED / KHÔNG ĐẠT
COMMENT/ Ý KIẾN :

TESTED BY / NGƯỜI WITHNESSED BY / CHỨNG KIẾN CHECKED BY / KIỂM TRA APPROVED / PHÊ DUYỆT
KIỂM TRA

ME SITE ENGINEER /KỸ SƯ ME


CÔNG TRƯỜNG ME MANAGER / QUẢN LÝ ME
Date / Ngày : Date / Ngày : Date / Ngày : Date / Ngày :