Bottom Settlment
ITP #: Repot No :
1- Tank definition
Orientation marker: Z= 0 m
Tank height: 7.3 m Services: Crude oil
Cylinder axis: X= Z= 1
Cylinder diameter: 9.154 m
Page 1 of 6
Tank Analysis
Storage Tank No.---
Owner: Client: Contractor: Third Party: Sub-Contractor:
As Drawing No:
Project: Single Bottom Tanks Management and Improvement Strategy Project Scanning Date:
Issue Date:
Location: Acceptance: API 653
ITP #: Repot No :
2- Bottom settlement
Elevation (m) Tilt plane elevation Magnitude Deviation
Points
(m) (m) (m)
Note:
- Magnitude = Elevation Value – Tilt plane Elevation value.
Page 2 of 6
Tank Analysis
Storage Tank No.---
Owner: Client: Contractor: Third Party: Sub-Contractor:
As Drawing No:
Project: Single Bottom Tanks Management and Improvement Strategy Project Scanning Date:
Issue Date:
Location: Acceptance: API 653
ITP #: Repot No :
Settlement Evaluation:
Shell settlement surveys were conducted in accordance with the requirements of
API 653 Figure B-1. These surveys were evaluated in accordance with the API 653
Appendix B.2.2 and compared with the acceptance criteria outlined in API 653
Appendix B.3.2.
Note:
Calculation of maximum permissible S or out-of-plane distortion per API 653
Appendix B.3.2 was made using:
FIND: Shell settlement API 653 Appendix B Methodology Given:
ITP #: Repot No :
R²: 0.995
Uniform settlement: -2.48774 m (reached on Bottom plate point 0)
Number of points: 8
RESULT:
TANK within tolerance for Bottom settlement.
Page 4 of 6
Tank Analysis
Storage Tank No.---
Owner: Client: Contractor: Third Party: Sub-Contractor:
As Drawing No:
Project: Single Bottom Tanks Management and Improvement Strategy Project Scanning Date:
Issue Date:
Location: Acceptance: API 653
ITP #: Repot No :
3- Foundation Settlement
Points Z ∆Z (mm)
Foundation plate point 1
-0.574 0
(Facing datum point "R")
Page 5 of 6
Tank Analysis
Storage Tank No.---
Owner: Client: Contractor: Third Party: Sub-Contractor:
As Drawing No:
Project: Single Bottom Tanks Management and Improvement Strategy Project Scanning Date:
Issue Date:
Location: Acceptance: API 653
ITP #: Repot No :
• The tank foundation with concrete ring wall under the shell.
• As per API 650 7.5.5.2 a Foundation Settlement
• Maximum Level Between Two Point’s = Point’s 2,3 and 10, 11 (∆Z = 6 mm)
• Maximum Level in total circumference = (∆ Z = 6 mm)
• Foundation types provided by B.V (Civil report).
Result :
- Foundation is out of tolerance in some 9 meters locations.
- Foundation is within tolerance in total circumference.