PROJECT TITLE : PROPOSED TWO (2) STOREY RESIDENTIAL BUILDING

PROJECT LOCATION : L24, B3, Greenwoods Subd., Brgy. Sampaga, Batangas City
PROJECT OWNER : Sps. Christopher & Rischel Leynes
TOTAL LOT AREA : 270 square meter

SUBJECT :BILL OF WORKS

Item No. Description Quantity Unit Unit Cost Amount


A Earthworks
Clearining 1 lot 10,000.00 Php 10,000.00
Excavation 45 cu.m 134.00 Php 6,030.00
Soil Treatment 1 liter 1,150.00 Php 1,150.00
Subtotal: Php 17,180.00
B Reinforcement Steel and Concrete Works
I. Footings
Sand 4.46 cu.m 900.00 Php 4,014.00
Gravel 3/4" 8.92 cu.m 824.21 Php 7,351.95
Cement @ 40kgs 74 bags 252.36 Php 18,674.64
16mm ⌀ RSB x 6m 64 pcs 344.42 Php 22,042.88
#16 G.I. Tie Wires 10.34 kgs 71.37 Php 737.97
Subtotal: Php 52,821.44
II. Columns
Ground Floor
Sand 4.06 cu.m 900.00 Php 3,654.00
Gravel 3/4" 8.12 cu.m 824.21 Php 6,692.59
Cement @ 40kgs 68 bags 252.36 Php 17,160.48
16mm ⌀ RSB x 6m 13 pcs 344.42 Php 4,477.46
16mm ⌀ RSB x 7.5m 105 pcs 418.02 Php 43,892.10
#16 G.I. Tie Wires 9.94 kgs 71.37 Php 709.42
Subtotal: Php 76,586.05
Second Floor
Sand 2.6 cu.m 900.00 Php 2,340.00
Gravel 3/4" 5.2 cu.m 824.21 Php 4,285.89
Cement @ 40kgs 39 bags 252.36 Php 9,842.04
16mm ⌀ RSB x 6m 70 pcs 344.42 Php 24,109.40
#16 G.I. Tie Wires 3.92 kgs 71.37 Php 279.77
Subtotal: Php 40,857.10
III. Elevation Beams
Second Floor
Sand 5.48 cu.m 900.00 Php 4,932.00
Gravel 3/4" 10.96 cu.m 824.21 Php 9,033.34
Cement @ 40kgs 74 bags 252.36 Php 18,674.64
16mm ⌀ RSB x 7.5m 435 pcs 418.02 Php 181,838.70
#16 G.I. Tie Wires 12.75 kgs 71.37 Php 909.97
Subtotal: Php 215,388.65
Roof Beams
Sand 3.11 cu.m 900.00 Php 2,799.00
Gravel 3/4" 6.22 cu.m 824.21 Php 5,126.59
Cement @ 40kgs 54 bags 252.36 Php 13,627.44
16mm ⌀ RSB x 6m 250 pcs 344.42 Php 86,105.00
#16 G.I. Tie Wires 7.2 kgs 71.37 Php 513.86
Subtotal: Php 108,171.89
III. Slabs
Slab On Grade
Sand 7.64 cu.m 900.00 Php 6,876.00
Gravel 3/4" 15.28 cu.m 824.21 Php 12,593.93
Cement @ 40kgs 122 bags 252.36 Php 30,787.92
16mm ⌀ RSB x 7.5m 435 pcs 418.02 Php 181,838.70
#16 G.I. Tie Wires 21 kgs 71.37 Php 1,498.77
Subtotal: Php 233,595.32
Second Floor
Sand 5.22 cu.m 900.00 Php 4,698.00
Gravel 3/4" 10.44 cu.m 824.21 Php 8,604.75
Cement @ 40kgs 94 bags 252.36 Php 23,721.84
16mm ⌀ RSB x 6m 250 pcs 344.42 Php 86,105.00
#16 G.I. Tie Wires 17 kgs 71.37 Php 1,213.29
Subtotal: Php 124,342.88

Total Amount: Php 868,943.33

PREPARED BY: Gutierrez, John Paul B.


Ilano, Mikko Anesor A.

CHECKED BY: Engr. Edgardo Legaspi