Professional Documents
Culture Documents
TSF - Daily & Monthly Inspection Sheet
TSF - Daily & Monthly Inspection Sheet
Access Details
Road and Ramps Status (Y/N) Comments
Free and clear of debris? ✘ Yes No
Smooth and safe for traffic? ✘ Yes No
Any observed unsafe areas? Is so,
describe the scenario and alert Mining or Yes ✘ No
Geotech Dep.
Any observed damage/erosion/cracking of
roadtop and sides? If so, describe Yes ✘ No
location:
Bunding
Road bunds present? ✘ Yes No
Perimeter Details
Bunding Status (Y/N) Comments
Are surface water bunds and windrows ✘ Yes No
intact?
Are there any defects? If so where? Yes ✘ No
Can you see evidence of erosion? Yes ✘ No
Are there any areas where surface water
is ponding? Yes ✘ No
Pipeline Details
Tailings Distribution Delivery Status (Y/N) Comments
Is deposition occurring? ✘ Yes No
If no, explain (i.e. Shutdown etc.)
Which spigots are operating? ✘ Yes No
(Refer to spigot numbers for consistency). OPF 1- spigot 1, OPF 2- spigot 1
Evidence of spillage from spigot points? Yes ✘ No
If so, which
Condition ones, amount
of dropper pipes of
andspillage,
spigot etc.
valves?
OPF1 Tailings delivery pipeline (visual Good
integrity)
OPF2Tailings delivery pipeline (visual ✘ Yes No
integrity) ✘ Yes No
Slurry Characteristics (7241) Comments
- Slurry Average Flow Rate: OPF1 Value: 1021m3
- Slurry Flow % solids: OPF1 Value: 49.87%
- Slurry Average Flow Rate: OPF2 Value: 1147m3
- Slurry Flow % solids: OPF2 Value: 52.06%
Is
Has the desands
the running?
line been flushed? How much ✘ Yes ✘ No
water has been transferred into the TSF? Yes ✘ No
Geotechnical Details
Erosion Status (Y/N) Comments
Evidence of erosion around the
dropper/spigot? ✘ Yes No
If so, where? On the wall of OPF2 spigot 4
Evidence of any other erosion? Yes ✘ No
If so, describe the location and extent?
Evidence of any other erosion? Yes ✘ No
If so, describe the location and extent?
Slumping Status (Y/N) Comments