Professional Documents
Culture Documents
CONSTRUCTION ENGINEERING
CE320
Semester 423
Report:
BY:
NO. NAME ID
1 Ahmed Khaled nawara 371117763
2 AbdulIlah Al-Tuwarish 371112632
Facilitator:
Dr. Fawaz Ali Al-Harbi
Date :07/6/2021
1
Table of contant
1- Introduction:…………………………………………………….(3)
2- Future picture of the projer: …………………………….…….(4)
3- Project definition: …………………………………………...…….(5)
4- The project Location: …………………………………...……..(6)
5- Contracts and processing: ……………………………...……..(7)
6- The equipment used : ……………………………...…………..(8)
7- Conclusion: ……………………………………………….…..(12)
8- References: ……………………………………………….…..(12)
2
1- Introduction:
It is known that there is a great development in the structural and architectural design in
Saudi Arabia to match the vision of the country in 2030 and this appears in reality and we
seek it in our daily lives
In this report, we present to you an overview of the distinguished project in the Unayzah
.Governorate, which is an administrative tower consisting of 14 floors
3
2- Future picture of the projer:
[1]
4
3- Project definition:
Within the meetings of the Unaizah Municipal Council, it was agreed to establish a tower
.that includes many of its departments
The foundation stone was laid by His Highness the Prince of Qassim laying the foundation
stone on Dhu al-Qa’dah 15, 1441
5
4- The project Location:
[2]
6
5- Contracts and processing:
[3]
7
6- The equipment used :
[4]
cement mixer
8
[4]
[5]
cement pump
9
[6]
10
Terminology of a
horizontal jib tower crane
11
7- Conclusion:
In this report, we learned about the project and what equipment was rented and worked in
the construction project and its sizes
8- References:
[1] https://www.um.gov.sa/P/D/3828 2021/6/07 , 12:17am
[2] Google Maps 2021/6/07 , 12:20 am
[3] Picture from the construction site 2021/6/05 8:33 pm
[4] [5][6] Picture from the construction site 2020/12/12 11:24 am
12