EQUIPMENT NUMBER CALCULATION

ST

O f

1200 CBM LPG CARRIER

(Hull: RSL – 41 ~ 42)

(Revision – R1)

r:S

tte

C o n s u lta n ts

S S T M a rin e S o lu tio n s L td

Le

th
R oom N o. 804( 7 Floor), Rose View Plaza

185, E lephant R oad , Dhaka-1 2 0 5 .

Bangladesh.

E-mail: sstmarines@gmail.com

IN

P roject : P7 2 1

D ate : 0 4 JULY, 2 0 1 7

D o c . N o : P7 2 1 -1 5 4 -X-R1

P repared by D a te R ev. no C hecked by

SIRAJ 0 4 JULY, 2 0 1 7 R1 SB

Se

Page1

X
SST MARINE SOLUTIONS LTD

U
1 INTRODUCTION

This calculation is in accordance with the requirements of RINA Rules 2016 (Pt B, Ch 10, Sec 4).

H
2 SHIP'S PARTICULARS

0/
Length O.A = 70.00 m

Length BP = 66.98 m

Breadth MLD = 12.00 m

67
Depth MLD = 5.30 m

Max. Draft = 2.80 m

00
3 CALCULATION OF EQUIPMENT NUMBER

The equipment number is to be obtained from the following formula :

2/3
EN = ∆ + 2. h. B + 0.1A

7/
where

∆ = Moulded Displacement of the ship, in [ t ]to the summer load waterline

01
1728.58 t [ See Attachment 01 ]

B = Moulded Breadth in [ m ]

= 12.00 m

/2
h = Effective height, in m, from the summer load waterline to the top of the uppermost house

= a + Σh n

ST

= 9.70 m

a = Freeboard amidships from the summer load waterline to the upper deck, in m.

= 2.50 m

Σh n = Height, in m, at centreline of tier "n" of the superstructures or deckhouses having a breadth

r:S

greater than B/4. Where a house having a breadth greater than B/4 is above a house with a

breadth of B/4 or less , the upper house is to be included and the lower ignored.

2
A = Area in [m ] in profile view,of the parts of the hull, superstructures and houses above the summer

load waterline which are within the length LE and also have a breadth greater than B/4.

tte

= 367.20 m

LE = Equipment Length equal to Rule Length, L without being taken neither less than 96% nor graeter

Le

than 97% of the total length of summer load waterline.

= 66.98 m

Computation of h & A

l h Profile Area
h ( Effective )

Items
2
(m) (m) ( m )
(m)

IN

Hull above Summer Draft 66.980 2.50 167.45


2.50

Forecastle Deck 5.988 2.4 14.37 0

Poop Deck 13.200 2.4 31.68 2.4

Bridge Deck 9.600 2.4 23.04 2.4

Wheel House Top 5.150 2.4 12.36 2.4

LPG Tank Above Deck (2-Tanks) 36.800 3.5 118.30 0

Sum 367.20 9.70

Se

So EN = 413.55

P721 - Equipment Number Calculation of 1200 CBM LPG CARRIER (Hull: RSL - 41~42)

Page2

X
SST MARINE SOLUTIONS LTD

U
4 SELECTING OF ANCHORING & MOORING EQUIPMENTS

H
Table 1 : For Anchor, Chain Cables

0/
Equipment
Stockless Anchor Stud link Chain cables

Number,

Diameter [mm]

67
A< EN <=B Mass per Total
Number
A B Anchor [kg] Length[m] Q1 Q2 Q3

400 450 3 1290 385 36 32 28

00
Table 2 : For Towline and Mooring Ropes

7/
Equipment Recommended Towlines & Mooring Lines

Number, Towline Mooring Ropes

A< EN <=B
Length Br. Load Length Br. Load

01
Number
A B [m] [kN] [m] [kN]

400 450 180 250 4 140 98

/2
Q1 = Chain Diameter Grade K1 (Ordinary quality )

ST

Q2 = Chain Diameter Grade K2 (Special quality )

Q3 = Chain Diameter Grade K3 (Extra Special quality )

From Table 1 & 2 :

r:S

Anchors = 3 x 1290 kg Stockless Anchors

OR

= 3 x 967.5 kg HHP Anchors ( See Note 1 )

Chain = 385 m x 36 diameter of Grade Q1 ( Ordinary quality )

tte

Tow Line = 180m , 250 kN Breaking Load

Mooring Rope = 4 x 140 m , 98 kN Breaking Load

The minimum breaking load of mooring ropes with material of


Le

synthetic fibre is to not less than 131 kN.


Note : 1 ) If HHP anchors are used, the mass of each anchor is to be not less than 75% of stockless anchor.

2 ) Where three anchors are provided, two are to be connected to their own chain cables and positioned

on board always ready for use.

The third anchor is intended as spare and is not required for the purpose of classification.

IN
R
e
Se

P721 - Equipment Number Calculation of 1200 CBM LPG CARRIER (Hull: RSL - 41~42)

13/05/17 17:50:40 SST Marine Solutions Ltd Page 3

X
GHS 15.50 1200 CBM LPG CARRIER(RSL-41 & 42)

U
ATTACHMENT 01 : HYDROSTATICS DATA

H
=====================================

0/
HYDROSTATIC PROPERTIES

No Trim, No Heel, Fixed VCG = 0.000

67
LCF Displacement Buoyancy-Ctr. Weight/ Moment/

Draft Weight(MT) LCB VCB cm LCF cm trim KML KMT

2.800 1,728.58 32.533f 1.600 7.85 30.877f 40.96 158.73 6.735

Distances in METERS. Specific Gravity = 1.025. Moment in m.-MT.

00
Trim is per 66.98m.

Draft is from Baseline.

7/
NOTES:

01
1) Main Hull and negative spaces are included in the calculation.

2) Draft, VCB, KML & KMT are measured relative to moulded baseline.

3) Longitudinal direction is measured from frame 0.(f = Forward, a = Aft)

4) Specific Gravity of Salt Water = 1.025


/2
Condition Graphic

ST

Profile View

H
r:S
tte
Le
A
IN
R
e
Se
Se
e
R
IN
A
Le
tte
r:S
H
ST
/2
01
7/
00
67
0/
H
U
X
Shanghai, 07 July 2017

(Encl.: 1) RINA Bangladesh Ltd


Bangladesh Marine
"LOKMAN TOWER", 7TH FLOOR. 1646 ,SK MUJIB
ROAD. PATHANTULY , DOUBLE MOORING
CHITTAGONG - BANGLADESH

Our Ref.: SHST/2017/00670/HUX File No.: (YB/2017/YB/01/34)


Subject: RSL-41 - RI 95992, RSL-42 - RI 95993
DRAWING FOR APPROVAL

We send the following approved drawings:

Number Sheets Date Title of Drawing / Your Ref. Annuls/Replaces


SHST-27701 07 Jul 2017 EQUIPMENT NUMBER CALCULATION - SHST-27371
P721-154-X-R1
Remarks to the drawing to be managed by client and verified by the attending surveyor (a written reply to this Plan
Approval Centre is not required):
B1. Please see comments as specified on the drawing.

# PLANS HAS BEEN REVIEWED ON THE BASIS OF CURRENT RELATED APPLICABLE RULES (AS AVAILABLE IN
LEOSHIP). THEY ARE TO BE DULY CONSIDERED DURING ISSUANCE OF CERTIFICATES. IN CASE OF APPLICABLE
RULES MODIFICATION, ADDITIONAL REMARKS OR NEW SUBMISSION OF PLANS MAYBE NECESSARY.

# IT IS HIGHLIGHTED TO MONITOR THE PLAN APPROVAL STATUS (MISSING DOCUMENT / OPEN REMARKS)
THROUGH THE ATTENDING SURVEYOR IN CHARGE.

# SURVEY REQUIREMENTS SPECIFIED IN THE APPLICABLE ITS FOR CLASS AND STATUTORY ASPECTS SHALL BE
APPLIED AND CHECKED BY ATTENDING RINA SURVEYOR.

In case of any question please contact HUI XU.

Yours faithfully,
RINA Services S.p.A.
GIUSEPPE ZAGARIA

RINA Services S.p.A.


Shanghai Engineering Centre
20th Floor, Metrobank Plaza, TEL: + 86 21 62482604
No. 1160, Yan An Road West, FAX: + 86 21 62482605 page 1 /1
Shanghai 200052, P. R. of China E-MAIL: segshpc@rina.org