LIST OF LUMPSUM ITEMS IN CSR 1998

S.No. MATERIAL Unit RATE

LS-01 Kitchen Expenses (tea, meat, milt fuel fat & appliances) Ch. 3 Item 16 (i) -- 200.00

LS-02 Lantern, Patromax lamp depreciation and K. oil consumption Ch. 3 Item 16 (i) -- 20.00
LS-03 Kitchen Utensil, cost of repair and replacement etc. Ch. 3 Item 16 (i) -- 10.00
LS-04 Kitchen Utensil, cost of repair and replacement etc. Ch. 3 Item 16 (i) -- 20.00
LS-05 Construction of Temporary Island (Ch. 6 Item 7 (i) -- 12,000.00
LS-06 Carriage of material to site of work (Boring Material) (Ch. 6 Item 7 (i) -- 500.00
LS-07 Hire charges of plant (Ch. 6 Item 8 (a) & (b) -- 800.00
Hire charges of assembling bunch cable wire cutter stressing, jack Hydraulic
pump, conce, fixer grout injecting pump relievable observation and supply of
LS-08 recorded data of stresses. (Ch. 6 Item 20) -- 500.00
LS-09 Repair of plate for the down struts spacers (Ch. 6 Item 21) -- 400.00
Hire charges of wire cutter stressing, Jack, Hydraulic pump relievable cone,
LS-10 observation and supply of recorded data of stress. (Ch. 6 Item 21) -- 200.00
LS-11 Fixture (Ch. 9 Item 18) -- 4.00
LS-12 Hire Charges of Spray Machine (Ch. 11 Item 6 i, ii & iii) -- 9.00
LS-13 Nail & Screws bolt and brackets (Ch. 12 Item 24 (a) -- 24.00
LS-14 Accessories for fixing of Eave Board (Ch. 12 Item 28 (b) -- 24.00
LS-15 Cost of Putty and Nails (Ch. 12 Item 44 a) -- 12.00
LS-16 Electricity Charges (Ch. 12 Item 51) -- 16.00
LS-17 Hold Fast (Ch. 12 Item. 57 b) -- 40.00
LS-18 Burner Charges, Kerosene Oil & Scraper (Ch. 13 Item 16) -- 12.00
LS-19 Misc. i.e. small T&P, working of Crane & Tar Boiler (Ch. 18 Item 10) -- 200.00
LS-20 Excavation and fixing (Ch. 18 Item 18 (iv) a) -- 2.00
LS-21 Jointing Plate with T Iron (Ch. 18 Item 18 (iv) a) -- 2.00
LS-22 Painting and lettering (Ch. 18 Item 18 (iv) a) -- 22.00
LS-23 Fixing manhole frame & cover including carriage to site (Ch. 21 Item. 15) -- 40.00
LS-24 Rental Charges of T&P (Ch. 21 Item. 19 a i) -- 80.00
Carriage from store to site of work for reverse rotary drilling reg complete set and
LS-25 generator set etc. (Ch. 23 Item 5 (a) i) -- 3,000.00
LS-26 Mix. Expenditure (Ch. 23 Item 5 (a) i) -- 600.00
LS-27 Taking and preserving box 2 lbs sample of strata. (Ch. 23 Item 7) -- 47.20
Taking samples of water from bore hole including bailing or 'pumping. (Ch. 23
LS-28 Item 7) -- 40.00

LS-29 Sealing the water sample and providing necessary packing etc. (Ch. 23 Item 7) -- 20.00
LS-30 Handling charges (Ch. 23 Item 7) -- 30.00
LS-31 C. Oil (Ch. 23 item 17 i & ii) -- 20.00

Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-32 pipe line for 3" (Ch. 23 Table 19 C) -- 0.60
Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-33 pipe line for 4" (Ch. 23 Table 19 C) -- 0.80
Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-34 pipe line for 5" (Ch. 23 Table 19 C) -- 0.84

Page 1
LIST OF LUMPSUM ITEMS IN CSR 1998

S.No. MATERIAL Unit RATE


Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-35 pipe line for 6" (Ch. 23 Table 19 C) -- 0.88
Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-36 pipe line for 8" (Ch. 23 Table 19 C) -- 1.40
Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-37 pipe line for 10" (Ch. 23 Table 19 C) -- 1.60
Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-38 pipe line for 12" (Ch. 23 Table 19 C) -- 2.40
Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-39 pipe line for 15" (Ch. 23 Table 19 C) -- 3.20
Providing and fixing temporary wooden tapered plug of hard wood to each end of
LS-40 pipe line for 18" (Ch. 23 Table 19 C) -- 4.00
LS-41 Soldering etc. (Ch. 24 Item 5 i) -- 8.00
LS-42 Locking arrangement (Ch. 24 Item 44 i) -- 60.00
LS-43 Extra labour for shuttering (Ch. 24 Item 44 i) -- 10.00
LS-44 Testing Fee (Ch. 24 Item 75 a & b) -- 120.00
LS-45 Leatheride Paper (Ch. 24 Item 76 i) -- 10.00
LS-46 Carriage from stone to site (Ch. 24 Item 42 a) -- 80.00
LS-47 Carriage to site of work (Ch. 25 Item 41 a) -- 25.00
LS-48 Carriage to site of work (Ch. 25 Item 41 b) -- 20.00
LS-49 Electric charges with electrode (Ch. 24 Item 42 a) -- 120.00
LS-50 Sewing charges (Labour) (Ch. 26 Item 4) -- 6.00
LS-51 Cost of Polish & Nails (Ch. 26 Item 20) -- 6.00
LS-52 Rope, rags, etc. (Ch. 26 Item 22) -- 12.00
LS-53 Filling cement bags with coal (Ch. 26 Item 27) -- 12.00
LS-54 Cotton Waste, Grease & Packing etc. (Ch. 26 Item 35 b) -- 8.00
LS-55 Accessories, repair and replacement portion (Ch. 26 Item 35 b) -- 8.00
LS-56 Spraying Machine (Ch. 26 Item 42) -- 55.00
LS-57 Sundries Percent 10.00
LS-58 Contractor's profit Percent 27.00

Page 2