Professional Documents
Culture Documents
ACU DDD - TNT Phase 2 PLDT Calauag ME (Initial State) 20may2021 - JEHAN - Rev.1
ACU DDD - TNT Phase 2 PLDT Calauag ME (Initial State) 20may2021 - JEHAN - Rev.1
3.83m
BETWEEN PLANS AND ACTUAL CONDITION, ACTUAL CONDITION WILL PREVAIL
AND WINNING CONTRACTOR WILL SUBMIT TO THE PLDT THE SHOP DRAWING
FOR EVALUATION AND APPROVAL. ANY REVISION/CONFLICT HAVE NO COST
2 AC
CU
WA
CU PR
3.88m
1
-2K1
8
2m
0.6
0.9
0m
OS 0.6
HW N980 0m
0m
TN 0
0.8
U
OS
HW N980
TN 0 RELOCATED
C
T
AC
BA BEL
AC
0.4
4m
NK
3
WA
CU
2
OS
N8
800 1800L FUEL
0m
HU
2m
RE
DAY TANK
AW
0.6
CT EI
1.1 IFIER
DRAIN PIPES AND ALL ITEMS REQUIRED FOR THE COMPLETION OF THE
7m 0.6
0.5 0m HU
9m RE
AC CT AW
CU
BA BEL
EI
6.9
IFI 0.6
NK ER
0.5 0m HU
0.9 2m 4 PA RE AW
6m CU CT EI
IFIER
0m
0.6
0m
AC
1.0 HU
0.6
AC RE 0m AW
1.1 CT
BA BEL 7m IFIER EI
NK 0.6
2 0.6 0m HU
0m AW
PROJECT.
EI
3m
AC 0.5 0.6
0.4
BE 0m BU 0.6 0m
BA L SB 0m
3TR CU-1
NK
0m
AR DC
1 PD OD
B 0.6 F
0.6
0m
AC
AC
3m
BE DC
RE L
1,2 PDB
0.4
CT DC
IFIER PD ,3 0.6 WA
B 0.6 0m CU
AC 0m 5
RE BEL DC
PD
CT 4,5
0m
IFI B 0.6
ER SM ,6,7,8
3T CU-2
0.7
AR MS
EN
EQ T AN
UIP
OK
ME
AC
R
NT SM
EQ ART OS
BR
MS 0.6
UIP 1.9
1m AN NA P TO 0m FC
U-
ME GA 3TR 2
NT LE
0m
GA
5.34m
1.0 DA ZP 0.6
9m ET I HU 0m
0.6
AW
PR EI
OP
OD
5T CU-6
F 0.6 PR
SECURE NECESSARY PERMITS FOR INSTALLATION & PERFORM ALL THE WORK
0m SM OP
AR RN
AC
T
R
C8
0m
300
9m
0m
0.6 0.6
0.3
0m OS 0m
0.6
HW N980
0.4
TN 0 0.6
T 0m
0.6
CIE 0m
2.89m
6500 NA
0.6
CIE 0m
0.6 6500NA
0m
NE 0.6 6500NA
1.0
9000 0m
PE
HW E-E CIE
TN NE 650 NA
T 9000
PE 0
CIS 0.6
HW E-E EQ
UIP CO
0m
TN ME
T
TN NT
0.8
T CIS WA
EQ
UIP CO CU
4
ME DC
TN NT PD
T CIS B
4
CO
FC
0m
U-6 1.02m
5TR
0.0
HU
DC AWEI
EMERGENCY
0m
LIGHT
0.0
3.56m
1 x 300KW ENCLOSED
WA
CU
3
3.50m
PROPOSED
GENSET
SELECTOR
SWITCH
CONTRACTOR. MDP
7. PAYMENT & LEG WORKS FOR THE APPLICATIONS OF ALL PERMITS SHALL BE
HANDLED BY THE CONTRACTOR.
5 ELP
2.04m
MTS
ATS
GENSET
MTS
3.37m
MOBILE BOX
6 PROP.
EPP-2
PROPOSED
EMDP-2K18
EE ROOM
1 x 300KW ENCLOSED
GENSET
3.28m
PROP. PROP.
MDP- ATS-2K18 PROP. PROP.
2K18 MTS-L MTS-G
3.50m
THIS SITE
2.47m
9
2.45m
10
2.47m
11
2.69m
12
VICINITY MAP
PLDT CALAUAG
EXSITING SITE DEVELOPMENT PLAN
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED 1x5TR (MITIGATION PLAN) PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
GENERAL NOTES,VICINITY MAP ME - 01
CORPORATION
SITE NAME: PLDT CALAUAG PRC No: PTR No: REVIEWED BY: EXISTING SITE DEVELOPMENT PLAN
SITE ADDRESS: BRGY. STA. MARIA, CALAUAG , QUEZON PROVINCE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER: ME-05
LONGITUDE: 13.953432 LATITUDE: 122.295858 PLACE ISSUE: DATE APPROVED:
A B C D E F G H
2.38m 3.27m 3.42m 3.37m 3.27m 3.11m 3.60m
3.83m
2 AC
CU
PA
CU
WA
CU PR
3.88m
1
-2K1
8
1.7
7m PR
PA
-AB
CU
2m
0.6
0.9
0m
OS 0.6
N9 0m
HW 800
0m
TN
T
0.8
CU
OS
N9
AC
HW 800
TN
T RELOCATED
BA BEL
1800L FUEL
AC
NK WA OS
0.4 3 CU N8
4m 800
3
2
0m
HU
2m
RE AW
DAY TANK
0.6
CT EI
1.1 IFI
7m ER 0.6
0.5 0m HU
9m RE AW
AC CT EI
CU
BA BEL IFIER
6.9
NK 0.6
0.5 0m HU
0.9 2m 4 PA RE AW
6m CU CT EI
IFIER
0m
0.6
0m
AC
1.0 HU
0.6
AC RE 0m AW
1.1 CT
BA BEL 7m IFIER EI
NK 0.6
2 0.6 0m HU
0m AW
EI
3m
AC 0.5 0.6
0.4
0m 0m
BA BEL BU
SB 0.6
0m
3TR -1
NK
0m
AR DC
OD
CU
1 PD 0.6
B F
0.6
0m
AC
AC
3m
RE BEL DC
1,2 PDB
0.4
CT DC
PD WA
0m
IFIER ,6,7,8 0.6
SM 0m
3TR CU-2
0.7
EQ ART MS
EN
UIP AN
OK
ME
AC
NT SM
EQ ART OS
BR
MS 0.6
UIP 1.9
1m AN NA P TO 0m FC
U-
ME GA 3TR 2
NT LE
0m
GA
5.34m
1.0 DA 0.6
9m ET ZPI HU 0m
0.6
AW
PR EI
OP
OD
5TR -6
F PR
CU
0.6 SM OP
0m AR RN
AC
T C8
0m
RA 300
9m
0.6 CK 0.6
0m
0.3
0m OS 0m
0.6
HW N980
0.4
RA TN 0 0.6
CK T 0m
0.6
CIEN 0m
2.89m
6500 A
0m
CIE
0.6 6500NA
(IN NEMA 1)
NE
1.0
0m
PE 9000E-E
HW CIE
TN
T NE 6500NA
PE 9000 CIS 0.6
HW E-E EQ
UIP CO 0m 1.29m
0m
TN
T ME
TN
T NT
0.8
CIS WA
EQ
UIP CO CU
DC 4
PR TN
ME
T NT
PD
OP CIS B
4
CO
.F
5TR CU FC
0m
1 5T
U-6 1.02m
0.0
R
HU
AW
DC
PD EI
AC ED
-1
F 0.9
9m
CU
5TR OS
OP
PR
EMERGENCY
0m
LIGHT
0.0
3.56m
1 x 300KW ENCLOSED
WA
CU
3
3.50m
PROPOSED
GENSET
SELECTOR
SWITCH
( CEILING SUSPENDED )
5 ELP
2.04m
MTS
ATS
(IN NEMA 1)
MOBILE BOX
6 PROP.
EPP-2
PROPOSED
EMDP-2K18
EE ROOM
1 x 300KW ENCLOSED
GENSET
3.28m
PROP. PROP.
MDP- ATS-2K18 PROP. PROP.
2K18 MTS-L MTS-G
7
3.50m
8
2.47m
9 LEGEND :
2.45m
EXISTING
10 PROPOSED
2.47m
PROPOSED ACCU
2.69m
12
PLDT CALAUAG
PROPOSED SITE DEVELOPMENT PLAN
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED 1x5TR (MITIGATION PLAN) PROFESSIONAL MECHANICAL ENGINEER CHECKED BY: EXISTING SITE DEVELOPMENT PLAN AND ME - 02
SITE NAME: PLDT CALAUAG PRC No: PTR No: REVIEWED BY:
PROPOSED FCU AND ACCU LOCATION
CORPORATION
SITE ADDRESS: BRGY. STA. MARIA, CALAUAG , QUEZON PROVINCE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER: ME-05
LONGITUDE: 13.953432 LATITUDE: 122.295858 PLACE ISSUE: DATE APPROVED:
A B C D E F G H
2.38m 3.27m 3.42m 3.37m 3.27m 3.11m 3.60m
3.83m
PROPOSED REFRIGERANT PIPE PIPE
LIQUID LINE 38" Ø
GAS LINE 34" Ø
2 AC
CU
PA
CU
WAC
U1 PR
3.88m
-2K
18
1.77
m PR
PA
-AB
CU
m
0.92
0.60
m
OSN 0.60
HW 9800 m
m
TN
0.80
T
CU
OSN
AC
BE
HW 9800
TN
T RELOCATED
AC
BA
1800L FUEL
L WAC
0.44 NK OSN
3 U2 8800
3
m
m
HU
2m
REC
0.60
DAY TANK
AW
1.17 TIFI EI
m ER 0.60
0.59 m HU
m REC AW
AC TIFI EI
CU
6.9
BA BEL ER 0.60
0.52 NK m HU
0.96 m 4 PA REC AW
CU TIFI EI
m
ER
m
0.60
AC
0.60
REC 1.00 m HU
AC 1.17 m AW
BA BEL m
TIFI
ER 0.60
EI
NK
2 0.60 m HU
m AW
EI
m
0.60
0.43
AC 0.50
BA BEL m BU 0.60 m
SB
3T CU-1
NK m
m
AR DC
1 PD OD
0.60
B 0.60 F
AC
AC m
R
m
RECBEL DC
0.43
TIFI
DC
PD 1,2, PDB 0.60 WAC
ER B 3 0.60
AC m m U5
RECBEL DC
PD
TIFI 4,5, B
m
ER SM 6,7, 0.60
0.70
3T CU-2
8 m
EQ ART MSA
EN
UIP N
OK
MEN
AC
R
T SM
EQ ART OSP
BR
1.91 MSA 0.60 FC
UIP N NAG TO m U
MEN m
LE A 3TR -2
T G
m
5.34m
0.60
m T HU m
AW
PR EI
O
OD P
5T CU-6
F 0.60 SM PR
m AR RN OP
AC
R
T C83
m
RAC 00
0.30
m
0.60 K 0.60
0.69
OSN
0.40
m m
HW 9800 0.60
RAC TN m
K T 0.60
2.89m
CIE m
6500NA
0.60
CIE m
0.60 6500NA
m
0.60 FC
CIE m U
0.60 3TR -1
m 6500NA
0.60
m
CIE m
0.60
1.00
NE9 m 6500NA
PE 000E
HW -E CIE
TN NE9 6500NA
T
PE 000E
HW -E EQ CISC 0.60
1.29m
UIP O m
m
TN M
T
0.80
TN ENT
T EQ CISCO WAC
UIP U4
PR M
TN ENT
DC
PD
OP T CIS B
4
CO
.F
5TR CU FC
1 5T
R
U-6 1.02m
HU
AW
DC
PD EI
CC ED
U-1
F 0.99
m
5T OPOS
RA
PR
EMERGENCY
m
LIGHT
0.00
3.56m
1 x 300KW ENCLOSED
WAC
U3
3.50m
PROPOSED
GENSET
SELECTOR
SWITCH
2.04m
EXISTING
MTS
ATS
GENSET
PROPOSED
3.37m
LIQUID LINE38" Ø
PROP. PROP. GAS LINE 34" Ø
MDP- ATS-2K18 PROP. PROP.
2K18 MTS-L MTS-G
7
PLDT CALAUAG
PROPOSED ACU ELECTRICAL LAYOUT
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED 1x5TR (MITIGATION PLAN) PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED REFRIGERANT PIPE LAYOUT ME - 03
CORPORATION
SITE NAME: PLDT CALAUAG PRC No: PTR No: REVIEWED BY: AND DRAIN PIPE LAYOUT
SITE ADDRESS: BRGY. STA. MARIA, CALAUAG , QUEZON PROVINCE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER: ME-05
LATITUDE: 122.295858
LONGITUDE: 13.953432 PLACE ISSUE: DATE APPROVED: .
CONCRETE CEILING
± 3.72 m
±2.50m.
±2.50m.
NTS &
NGN
ROOM ± 1.50 m
FFL
936mm
33
m 6m
6m m
93
150mm
722mm
15mm
150mm
150mm
mm
936mm 36
11
1136mm 53
6m
m
OPERATOR: CONTRACTOR: PROJECT NAME: DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED 1x5TR (MITIGATION PLAN) PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME - 04
CORPORATION
SITE NAME: PLDT CALAUAG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: BRGY. STA. MARIA, CALAUAG , QUEZON PROVINCE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER: ME-05
LONGITUDE: 13.953432 LATITUDE: 122.295858 PLACE ISSUE: DATE APPROVED:
PIPE HANGER DETAILS
PIPE SUPPORT DETAILS
25mm WALL 25mm
THICKNESS
CAULK OR
NON SHRINK GROUT GA 20 PLAIN
DRAIN PIPE DETAILS REFRIGERANT PIPE
G.I. SHEET
PIPE CLAD
INSULATION
INCLUDING
PIPE O.D.
OPENING
40mm MIN. CLEARANCE 8mm∅ ROUNDED BAR
ALL AROUND ANCHOR WELDED TO
B.I. PLATE
ROLLED BI PLATE
25mm THK. ANNULAR G.A. 16 WELDED
RUBBER SEAL JOINT PIPE SLEEVE
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED 1x5TR (MITIGATION PLAN) PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
ME - 05
MISCELLANEOUS DETAILS
CORPORATION
SITE NAME: PLDT CALAUAG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: BRGY. STA. MARIA, CALAUAG , QUEZON PROVINCE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER: ME-05
LONGITUDE: 13.953432 LATITUDE: 122.295858 PLACE ISSUE: DATE APPROVED: