1 Forces at section X-X at 6m from top

P = 219 kN
M = 570 kN.m
V = 284 kN

Note - The BM & SF at section X-X are resisted by the shear key.
The stresses developed on the joint are presented below. 

2 Forces action on shear key

a = 0.5 m Depth of key


b = 0.3 m Width of key
L = 1 m Length of key

V = 284 kN
M = 570 + 0.5 X 284 = 641 kN.m
2

3 Stresses on shear key

Area (A) = LXa = 500000 mm2


Section modulus (Z) = L X a2 = 41666667 mm3
6

Stress at top corner = V + M = 15.952 MPa


A Z

Stress at bottom corner = V - M = -14.816 MPa


A Z
4 Shear resistance required

F1 = Area of triangular stress block

= 2067.6214 N/mm or kN/m

Sheared area at crack = b*L


1 = 300000 mm2

shear acting over = 2067621 N


length L

Shear stress = 6.89 N/mm2

Max shear strength for M35 concrete with 3% reinforcement is 0.99 N/mm2

Max permissible shear stress for M35 concrete is 3.70 N/mm2

The required shear resistance is too high & can not be provided using additional
reinforcement
1 Forces at section X-X at 6m from top

P = 219 kN
M = 570 kN.m
V = 284 kN

Note - Bending moment at section X-X is resisted by eccentrically


placed prestressed cable.

2 Force required in cable to resist BM & SF at section X-X

For preliminary calculations, the cable is placed at a dist (b/6) from the center of the section.
Doing this, there won't be any tensile(uplift) stress on the opposite side. This cable location gives
maximum force. The cable eccentricity can be further increased by providing additional cable on
the other side.

P = M e = B
e 6
= 789 = 131.5 mm
6

P = 570000000 = 4334.601 kN / running meter


131.5
Add appx 25 % for losses

P cable = 5418.25095 kN / running meter

Considering cable spaced at 200 mm c/c, number of cables per running meter is 6

Force in each cable = 903.0418 kN

Considering high strength cable of grade 1600 MPa

Dia of cable required = 26.8 mm

Required Shear resistance can be easily achived with the available prestressing force
4 Alternative option with joints at heel & toe slab
Item Quantity Unit rate Cost
Concrete 9.8 cu.m 10000 Rs/cum 98000 Rs
steel 1.5 tonn 60000 Rs/tonn 90000 Rs
Total 188000 Rs

tendon 54 kg 250 Rs/kg 13500 Rs 7.2%

Possible saving in cost


Item Quantity Unit rate Cost
Concrete 10.4 cu.m 8000 Rs/cum 83200 Rs
steel 0.75 tonn 60000 Rs/tonn 45000 Rs
Total 128200 Rs
Saving 59800

tendon 54 kg 250 Rs/kg 13500 Rs -24.6%


Depth Mu Mu Bal
prestress Chart Title
kNm
1600
0 0 -
6 570 570.0 0.0 1400
7.85 1302 701.3 600.7
8.15 1500 722.4 777.6 1200

1000

Cost of prestressing over product cost 800

600

400

200

0
0 1 2 3 4 5

Cost of prestressing over initial product cost


Chart Title

1 2 3 4 5 6 7 8 9