CLIENT
TATA PROJECTS
PROJECT
Design of temporary structure for excavtion
SUBJECT
Design of touch pile wall
Assumptions
The following are the assumptions used for the design of the touch piles wall for soil retention
f = 25 °
a = 0 °
d = 1/3 f = 8.333
i = 0.0 °
Ka = 0.821
1.000 ( 1 + 0.484 )
= 0.38
Kp = 0.821
0.989 ( 1 + 0.487 )
= 3.16
GEM ENGSERV PVT. LTD. Note No. Revision
AAPCO/touchpile/01 R 0
Project: PROPOSED CONSTRUCTION OF DFCC MAJOR BR.NO. 88 Date Sheet
11/22/2023
Subject: Design of embankment retention scheme at Abutment A1 Prepared by Checked by
SSN YP
LL & SIDL Surcharge (As per IRS substructure code, cl. 5.8.3)
The substructure shall be designed for the loads due to Earth Pressure & LL & SIDL Considering
45° dispersionthe dispersion zone.
Live Load Surcharge, S = 134 kN/m (As per IRS substructure code, Table 3)
Dead Load Surcharge (SIDL), V = 60 kN/m (Assumed conservatively )
20.25 B 2.96
y
C
34.34 117.2 D
44.93 D 6.568
205.2
A Top of pile
B excavation level
C Point of zero shear
D Level of embedment
(0.5*44.93*6.568*0.33*6.568)+(10.32*(6.568- = (0.5*205.22*(6.568-2.96)^2*0.33
1.725)^2*0.5)
0.5*34.34*(2.96+2.06)+10.32*((2.96- = 0.5*117.17*2.06
1.725)+2.06)
Point of zero shear (c) is at distance 2.06 m (y) from line of excavation
GEM ENGSERV PVT. LTD. Note No. Revision
AAPCO/touchpile/01 R 0
Project: PROPOSED CONSTRUCTION OF DFCC MAJOR BR.NO. 88 Date Sheet
11/22/2023
Subject: Design of embankment retention scheme at Abutment A1 Prepared by Checked by
SSN YP
= 116.8 kN.m /m
1 Introduction -
The note presents the design of touch pile wall to enable excavtion for the construction of pile cap of pier
no 8
Reference codes
3.1 Earth Pressure (As per IRS substructure code, cl. 5.7.1)
f = 25 °
a = 0 °
d = 1/3 f = 8.333
i = 0.0 °
Ka = 0.821
1.000 ( 1 + 0.484 )
= 0.38
Kp = 0.821
0.989 ( 1 + 0.484 )
= 3.130
3.2 LL & SIDL Surcharge (As per IRS substructure code, cl. 5.8.3)
The touch piles are designed for the loads due to Earth Pressure & LL & SIDL Considering 45°
dispersionthe dispersion zone.
Live Load Surcharge, S = 134 kN/m (As per IRS substructure code, Table 3)
Dead Load Surcharge (SIDL), V = 60 kN/m (Assumed conservatively )
1.725
10.32 H 1.725
1.235
B 2.96
C
5.273
56.32 D 8.233
The horizontal force due to lateral earth pressure & live load is converted into a single lateral load
such that the total magnitude of the force remains the same
2.96
Passive resistance
Resultant Load
5.272
72.64
Note No. Revision
GEM ENGSERV PVT. LTD. AAPCO/touchpile/01 R 0
Date Sheet
Project: Design of temporary structure for excavtion
11/22/2023
Prepared by Checked by
Subject: Design of touch pile wall
SSN YP
= 26.11 kN/m2
= 0.903 m
= 137.8 kN/m2
= 50.44 kN
= 1.88 m
Equation no 1
Note No. Revision
GEM ENGSERV PVT. LTD. AAPCO/touchpile/01 R 0
Date Sheet
Project: Design of temporary structure for excavtion
11/22/2023
Prepared by Checked by
Subject: Design of touch pile wall
SSN YP
= 4.766
= 13.95
= 89.19
= 105.9
Putting above values in equation no 1 & solving for L 4 using trail & error
Try L4 = 4.369 m
= 126.4 kN/m2
= 264.2 kN/m2
= 1.867 m
= 1.155 m
= 157.9 kN.m/m
2.96
26.11
0.903
4.369 5.272
-93
1.155 0.855
-126 264.2
8.0
8.0
7.0
7.0
6.0
6.0
5.0
5.0
4.0
4.0
3.0
3.0
2.0
2.0
1.0
1.0
0.0
0.0 -40 -20 0 20 40 60 80 100 120 140 160
-140 -120 -100 -80 -60 -40 -20 0 20 40 60
Note No. Revision
GEM ENGSERV PVT. LTD. AAPCO/touchpile/01 R 0
Date Sheet
Project: Design of temporary structure for excavtion
11/22/2023
Prepared by Checked by
Subject: Design of touch pile wall
SSN YP
Referring chart no 60 of SP 16
Mu = 0.075
fck D 3
Referring to IS 456:2000, Table 20 & 19, Shear stress (τv) is less than (τc max) & design shear
strength (τc) for 2.8 % reinforcement
f = 25 °
a = 0 °
d = 1/3 f = 8.333
i = 0.0 °
Ka = 0.821
1.000 ( 1 + 0.484 )
= 0.38
Kp = 0.821
0.989 ( 1 + 0.484 )
= 2.097
GEM ENGSERV PVT. LTD. Note No. Revision
AAPCO/touchpile/01 R 0
Project: PROPOSED CONSTRUCTION OF DFCC MAJOR BR.NO. 88 Date Sheet
11/22/2023
Subject: Design of embankment retention scheme at Abutment A1 Prepared by Checked by
SSN YP
LL & SIDL Surcharge (As per IRS substructure code, cl. 5.8.3)
The substructure shall be designed for the loads due to Earth Pressure & LL & SIDL Considering
45° dispersionthe dispersion zone.
Live Load Surcharge, S = 134 kN/m (As per IRS substructure code, Table 3)
Dead Load Surcharge (SIDL), V = 60 kN/m (Assumed conservatively )
20.25 B 2.96
y
C
20.25 0 D
44.93 D 6.568
136.2
A Top of pile
B excavation level
C Point of zero shear
D Level of embedment
2.96
3.608
60.15 136.2
ka = 0.38
GEM ENGSERV PVT. LTD. Note No. Revision
AAPCO/touchpile/01 R 0
Project: PROPOSED CONSTRUCTION OF DFCC MAJOR BR.NO. 88 Date Sheet
11/22/2023
Subject: Design of embankment retention scheme at Abutment A1 Prepared by Checked by
SSN YP
= 20.25
= 0.655
= 132
= 36.6
= 1.632
= 4.27
= 9.472
= 53.52
GEM ENGSERV PVT. LTD. Note No. Revision
AAPCO/touchpile/01 R 0
Project: PROPOSED CONSTRUCTION OF DFCC MAJOR BR.NO. 88 Date Sheet
11/22/2023
Subject: Design of embankment retention scheme at Abutment A1 Prepared by Checked by
SSN YP
= 55.11
L4 = 3.613
-0.295 = 0
D = L3 +L4 = 4.2683 m
= 111.7
= 243.7
= 1.539
GEM ENGSERV PVT. LTD. Note No. Revision
AAPCO/touchpile/01 R 0
Project: PROPOSED CONSTRUCTION OF DFCC MAJOR BR.NO. 88 Date Sheet
11/22/2023
Subject: Design of embankment retention scheme at Abutment A1 Prepared by Checked by
SSN YP
L5 = 0.93
= 97.45
43.85
2.96
20.25
0.655
3.613 4.268
-82.94
0.93 0.694
-112 243.7
4
4
3
3
2
2
1 1
0 0
-100.00 -50.00 0.00 50.00 -20.00 0.00 20.00 40.00 60.00 80.00 100.00
GEM ENGSERV PVT. LTD. Note No. Revision
AAPCO/touchpile/01 R 0
PROPOSED CONSTRUCTION OF DFCC MAJOR BR.NO. 88 Date Sheet
11/22/2023
Subject: Design of embankment retention scheme at Abutment A1 Prepared by Checked by
SSN YP
A steel plate will be fitted to the wing wall using HILTI bolts. The horizontal waler will be welded
to that plate
Permissible Stresses
3
2
N/mm2
… Hence Safe
The End Plate will be connected to the wing wall using HILTI HAS-E-5.8 M20X170/48 Bolts
alongwith HVU2 Mortar Capsule
Number of Bolts = 4
Diameter of Bolt = 20.00 mm
Recommended limit for axial force = 51.90 kN
Recommended limit for shear force = 35.00 kN