AND FOUNDATION
BRIDGE NO 614
7 X 4.72 M PSC SLAB
SUBMITTED BY,
SM CONSULTANTS,
BHUBANESWAR
CONTENTS
Sl no Descirption
1 ABUTMENT DESIGN
4 PIER DESIGN
6 RAFT DESIGN
INTRODUCTION
BRIDGE NO 614
Chainage 465241
Abutment No A1
No of Tracks 1
Hydraulic Particulars
Discharge 267.739 Cumecs
High Flood Level (HFL) 267.942
Soil Particulars
Type of Soil at founding Level Rock
DESIGN PARAMETERS
Grade of Concrete M 35
Grade of Steel Fe 500
Unit weight of Concrete (T/m3) 2.5
Seismic Zone II
Exposure Condition Moderate
Basic Wind Speed 47 m/s
SPAN DETAILS
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
2.0 REFERENCES
For the design of the abutment and its different components generally the provisions of IRS(Indian Railway Standards)
Codes have been followed. Followings are the main references.
i. IRS Bridge Rules
ii. IRS Concrete Bridge Code
iii. IRS Substructure and Foundation code
4.1 Span 1
Clear Span = 4.570 m
Effective Span = 5.133 m
Overall Span = 5.545 m
Span Between C/C of Expansion Joints = 5.620 m
Expansion Gap = 0.075 m
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
5.0 SKETCHES
0.49
1.00 0 271.015
0.490
0.274
0.49 270.525
270.075 0.45
0.45
-0.226
6.945
264.070
0.00 m 0.00
ELEVATION
LOA of Slab Load
1.00
7.85 1 0
7.85 2.285
0.281
0.493
3.285
PLAN
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
6 LOAD CALCULATION
6.1.1 Dead Loads from Superstructure Refer Drawing No. - RDSO BA 10261
Wt. of Span = 33.296 T
Reaction on each Abutment = 16.648 T
Longitudinal Eccentricity of Reaction w.r.t. C/L of Abutment, e L1 = 0.274 m
(Note : Please Refer Cl: 2.5.1 of IRS:Bridge Rule for Transverse Eccentricity)
(Note : Please Refer Cl: 2.5.1 of IRS:Bridge Rule for Transverse Eccentricity)
Transverse Eccentricity of Reaction, eT = = 0m
Transverse Moment due to SIDL = 18.714 x 0 = 0T - m
0.493
0.45 0.45
C/L of Abutment
1
[a] Dead Load of Dirt Wall
Dead Load = 0.5 x 0.49 x (0.493+0.493) x 7.85 x 2.5 = 4.741 T
Eccentricity w.r.t. Abutment CG = -(1/2.0 - 0.247) = -0.254 m
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
7.850
Traffic Direction
PLAN of Footing
Volume of footing = 23.209 m3
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
Computation of CDA
(Note:Please refer clause 2.4.1.1 (a) and 2.4.2.1 (a) of IRS:Bridge Rule)
CDA = (2 - d/0.9) x 0.5 x (0.15 + [ 8 / (6 + L)]) Subject to Maximum of 1.0
Depth of fill = 0.35 m Therefore, CDA = 0.679
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
271.015
(FORMATION LEVEL)
6.945
7.845
264.070 3.484
0.900(TOP OF footing)
263.170 3.936
(BOTTOM OF footing)
AT Base of Abutment Wall
Earth Pressure at Abutment Base = Ka γ H
= 0.251 x 2 x 6.945 = 3.484 T / m2
Total Force at Abutment Base = 0.50 x 3.484 x 6.945 x 7.85
= 94.979 T
Lever Arm w.r.t. Abutment Base = 6.945 / 3.0 = 2.315 m
Moment about Base of Abutment Wall = 94.979 x 2.315 = 219.876 T- m
AT Base of Footing
Earth Pressure at base of Footing
= 0.251 x 2 x 7.845 = 3.936 T / m2
Force on Footing only = 0.50 x ( 3.484 + 3.936 ) x 0.9 x 7.85
= 26.212 T
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
6.4.2 ACTIVE EARTH PRESSURE DUE TO SURCHARGE EFFECT
Note : Please Refer CL. 5.8.2 Of IRS : Substructure & Foundation Code.
Dead Load Surcharge for each track V = 6.75 T / m
Live Load Surchage for each track S = 13.70 T / m
Surcharge Width at Formation Level B = 3.00 m
Length of Abutment L = 7.85 m
Height of Abutment H = 6.945 m
THEREFORE, H > ( L - B )
(FORMATION LEVEL) 1.710
P1 4.85
6.945
0.653
2.10 2.99
(TOP OF footing) P2
(BOTTOM OF footing) 0.900 P3
0.653
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
= 1.048 m
P3 = 0.653 x 0.9
= 0.588 T/m
CG = 0.9 / 2
= 0.450 m
AT Base of Footing
Horizontal Force on footing only = 4.62 T
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
6.5.2 VERTICAL LOAD DUE TO DEAD LOAD & LIVE LOAD SURCHARGE
Intensity of DL & LL Surcharge on footing
= 13.7 + 6.75 = 20.450 T / m
Vertical Load due to DL & LL surcharge = 20.45 x 0 = 0.000 T
[Refer Cl: 2.12.5.2 of IRS Bridge Rules, Slab, box and pipe culverts need
not be designed for seismic forces.]
Hence seismic Forces are not considered in design.
[Refer Cl 5.11 of substructure and foundation code, Wind pressure shall be taken into account for bridges of
span 18m and over.]
Hence wind Forces are not considered in design.
[Refer Cl: 2.8.2.4.3 (f) of IRS Bridge Rules, Ballasted deck bridges without bearings (Slab, box and arches)
need not be checked for forces due to continuation of LWR.]
Hence LWR Forces are not considered in design.
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
7 SUMMARY OF LOAD AND MOMENT
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
8 COMBINATION OF LOADS
CASE I Normal (DL+SIDL+LL) (Ref Combination I as per IRS Concrete Bridge Code)
CASE II Normal + Friction (DL+SIDL+FL) (Ref Combination IV as per IRS Concrete Bridge Code)
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
9.2 Ultimate Limit State (ULS)
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
= 0.000 T
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
14.2 Summary of Forces at Base of footing
Serviceability Limit State (SLS)
Case - I Case - II
V (T) 360.36 268.01
ML (T - m) 709.26 597.23
MT (T - m) 9.24 0.00
HL (T) 216.20 202.76
HT (T) 0.00 0.00
1
7.85
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
Overall Depth D = 1000 mm
Clear Cover = 50 mm
Diameter of Main Rods (Vertical) = 20 mm
Diameter of Distribution Rods (Horizontal) = 12 mm
Effective Cover = 50 + 12 + 20 / 2 = 72 mm
Effective Depth, d = 1000 - 72 = 928 mm
Secondary Reinforcement
Minimum secondary reinforcement = 0.12 % of bd
= ( 0.12 / 100 ) x 928 x 1000
= 1113.6
Provide T- 12 @ 100 mm c/c as Transverse R/F
Therefore, Ast_trans = ( π / 4 )12^2 x 1000 / 100 = 1131 mm2 / m
Therefore, Ast_trans = 1131 mm2 / m > 1114 mm2 / m
OK
Reinforcement on outer face
Provide T- 16 @ 140 mm c/c Vertically
Therefore, Ast_trans = ( π / 4 )16^2 x 1000 / 140 = 1436 mm2 / m
OK
Provide T- 12 @ 100 mm c/c as Transverse R/F
Therefore, Ast_trans = ( π / 4 )12^2 x 1000 / 100 = 1131 mm2 / m
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
OK
S M CONSULTANTS,BHUBANESWAR
ABUTMENT MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
S M CONSULTANTS,BHUBANESWAR
ABUTMENT CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 413
DESIGN OF ABUTMENT
BRIDGE NO 614 ABUTMENT NO. A1 Span Arrangement
1.0 INTRODUCTION
7 x 4.72 P.S.C SLAB
The system consists of a solid rectangular abutment with monolithic dirt wall and solid abutment cap. The top
dimensions of the abutment cap are fixed so as to fit in the details of PSC Slab superstucture.
2.0 REFERENCES
For the design of the abutment and its different components generally the provisions of IRS(Indian Railway Standards)
Codes have been followed. Followings are the main references.
i. IRS Bridge Rules
ii. IRS Concrete Bridge Code
iii. IRS Substructure and Foundation code
iv. UIC 774- 3R
3.0 DESIGN PARAMETERS:
Proposed Rail Level RL 271.755 m
Proposed Rail Formation Level RL 271.015 m
Structural Depth of Deck Slab 0.000 m (Ref B -11754/4R1)
Bottom of Girder Level RL 271.265 m
Top of Bed Block Level RL 271.265 m
Top of Abutment Level RL 270.265 m
Ground Level RL 265.170 m
Top of Footing Level RL 264.930 m
Footing bottom level RL 263.930 m
High Flood Level (HFL) RL 267.942 m
Design Discharge 267.739 cumec
Unit wt of concrete 2.5 T/m3
Seismic Zone II
4.1 Span 1
Clear Span = 4.570 m
Effective Span = 5.133 m
Overall Span = 5.545 m
Span Between C/C of Expansion Joints = 5.620 m
Expansion Gap = 0.02 m
S M CONSULTANTS,BHUBANESWAR
ABUTMENT CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 413
0
5.0 SKETCHES 271.015
0.4
0.9
-0.250
0.176
0.4 271.265
270.265 1
0 1
0.450
0.9 6.085
0.9 264.930
0.0 m
1.0 1m 1
263.93
Footing Bottom Level
8 0.9 6
`
ELEVATION
1.00
C/L of Bearing C/L of Footing
0.9
7.85 0.9 6
C/L of Abutment
14.9
PLAN
S M CONSULTANTS,BHUBANESWAR
ABUTMENT CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 413
6 LOAD CALCULATION
6.1.1 Dead Loads from Superstructure Refer Drawing No. - RDSO B 11754
Wt. of Span = 33.296 T
Reaction on each Abutment = 16.648 T
Longitudinal Eccentricity of Reaction w.r.t. C/L of Abutment, e L1 = 0.176 m
Longitudinal Eccentricity of Reaction w.r.t. C/L of Footing, eL2 = -0.82 m
(Note : Please Refer Cl: 2.5.1 of IRS:Bridge Rule for Transverse Eccentricity)
(Note : Please Refer Cl: 2.5.1 of IRS:Bridge Rule for Transverse Eccentricity)
Transverse Eccentricity of Reaction, e T = = 0m
Transverse Moment due to SIDL = 18.714 x 0 = 0T - m
0.400
1 1
0
C/L of Abutment
C/L of Bearing
0.9
[a] Dead Load of Dirt Wall
Dead Load = 0.5 x -0.25 x (0.4+0.4) x 7.85 x 2.5 = -1.963 T
Eccentricity w.r.t. Abutment CG = -(0.45 - 0.2) = -0.250 m
Eccentricity w.r.t. Footing CG = -0.25 - 1 = -1.250 m
S M CONSULTANTS,BHUBANESWAR
ABUTMENT CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 413
[b] Dead Load of Abutment Cap - Rectangular portion
Dead Load = 0.9 x 1 x 7.85 x 2.5 = 17.6625 T
Eccentricity w.r.t. Abutment CG = -1.055E-15 m
Eccentricity w.r.t. Footing CG = -1.00 m
thickness(m
Component Nos Unit Wt ( T/ m3) wt (T)
m)
Top & Bottom Rubber Pad 2 6 1.35 #REF!
Intermediate Steel Plate 5 6 7.85 #REF!
Intermediate Rubber Pad 4 16 1.35 #REF!
Wt of all bearings 2 #REF!
Total Dead Load from Abutment Cap including Bearings, Plates, Railing and OHE mast
= #REF! = #REF! T
Total Longitudinal Moment about CL of Abutment due to above Dead Load
= #REF! = #REF! T - m
Total Longitudinal Moment about CL of Footing due to above Dead Load
= #REF! = #REF! T - m
S M CONSULTANTS,BHUBANESWAR
ABUTMENT CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 413
6.1.4. Dead Load of Abutment Shaft
The Abutment has Rectangular Section.
7.85
7.850
Traffic Direction
PLAN of Footing
Volume = 171.130 m3
Computation of CDA
(Note:Please refer clause 2.4.1.1 (a) of IRS:Bridge Rule)
CDA = (0.15 + [ 8 / (6 + L)])
S M CONSULTANTS,BHUBANESWAR Subject to Maximum of 1.0
Depth of fill = 0.35 m Therefore, CDA = 0.843
FOOTING CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 443
A C
3.29
B D
7.85
Bearing
Pressure (in Comb-I Comb-II Comb-III SBC Check
T/m2) at
A 64.485 Err:509 52.694 Err:509
B 63.937 Err:509 52.694 Err:509
C -35.988 Err:509 -31.908 Err:509
D -36.536 Err:509 -31.908 Err:509
S M CONSULTANTS,BHUBANESWAR
FOOTING CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 443
Moment
about toe (T-
Sl Force Magnitude (T) Lever Arm(m) m) ML
1 Superstructure DL 16.65 2.511 41.80
2 SIDL 18.71 2.511 46.99
3 DL of dirt wall 4.74 3.039 14.40
4 DL of abutment Cap 8.83 2.785 24.60
5 DL of abutment shaft 117.85 2.785 328.21
6 DL of footing(at HFL) 34.81 1.643 57.18
7 DL of backfill soil 0.00 2.29 0.00
8 DL + LL Surcharge 0.00 2.29 0.00
9 DL of Front fill 39.46 1.14 45.09
3 Factor of Safety
3.1 Against Overturning Case i Case ii Case iii
Overturning Moment 553.212 582.573 477.583
Resisting Moment 1181.437 1181.437 1181.437
Factor of Safety 2.136 2.028 2.474
Comments OK OK OK
S M CONSULTANTS,BHUBANESWAR
FOOTING CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 443
S M CONSULTANTS,BHUBANESWAR
FOOTING CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 443
S M CONSULTANTS,BHUBANESWAR
FOOTING CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 443
Secondary Reinforcement
Minimum secondary reinforcem = 0.12 % of b d
= ( 0.12 / 100 ) x 805 x 1000
= 966
Provide T- 12 @ 125 mm c/c as Transverse R/F
Therefore, Ast_trans
= ( π / 4 )12^2 x 1000 / 125 = 905 mm2 / m
Therefore, Ast_trans
= 905 mm2 / m < 966 mm2 / m
NG, Revise Steel
1 0.87 fy As z
2 0.15 fck b d2
S M CONSULTANTS,BHUBANESWAR
FOOTING CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 443
As the Design Section Capacity is greater than the Ultimate Moment the Section is OK
[Ref: As per Cl: 15.9.4.2 of IRS Concrete Bridge Code]
Minimum Reinforcement percentage in a wall section
= 0.2 % of bd
Ast_min = ( 0.2 / 100 ) x 805 x 1000
= 1610 mm2 / m
Secondary Reinforcement
Minimum secondary reinforcement
= 0.12 % of b d
= ( 0.12 / 100 ) x 805 x 1000
= 966
Provi T- 12 @ 125 mm c/c as Transverse R/F
Therefore, Ast_trans
= ( π / 4 )12^2 x 1000 / 125 = 905 mm2 / m
Therefore, Ast_trans
= 905 mm2 / m < 966 mm2 / m
NG, Revise Steel
6.2 FOOTING MINIMUM REINFORCEMENT (TOE SIDE - TOP, HEEL SIDE - BOTTOM)
S M CONSULTANTS,BHUBANESWAR
FOOTING CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 443
S M CONSULTANTS,BHUBANESWAR
FOOTING CONSTRUCTION OF NEW B.G. LINE BETWEEN DUNGARPUR RATLAM VIA BANSWARA BRIDGE NO 443
Asv_required = Err:509
= Err:509 mm2 / m
Since, Asv_provided is Err:509 Asv_required Err:509
S M CONSULTANTS,BHUBANESWAR
ABUTMENT CAP MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
PHILOSOPHY
The cap is provided with nominal reinforcement of 0.2% steel distributed equally at top and bottom and provided in two
directions both at top and bottom. The reinforcement along the shorter side is in the form of hoops, extending for full width
of the cap. The reinforcement along the length of the cap should extend from end to end of the cap.
DIMENSIONS
Reinforcements
1.00
0.45
0.45
1
1) Transverse Direction
2) Longitudinal Direction
S M CONSULTANTS,BHUBANESWAR
ABUTMENT CAP MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
3) Stirrups
S M CONSULTANTS,BHUBANESWAR
BALLAST WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 616
Design Parameters
Load Calculation
2.1 Earth Pressure Coefficient
THEREFORE, H < ( L - B )
(TOP OF BALLAST WALL) 1.710
0.490
S M CONSULTANTS,BHUBANESWAR
BALLAST WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 616
Longitudinal Force at the top of ballast wall for single track = 31.500 T
Width of uniform distribution = 3.700 m
Maximum Braking force per meter 31.5 / 3.7 = 8.514 T / m
Total height of wall = 0.490 m
Moment about Base of Ballast Wall
= 0.49 x 8.514 = 4.172 T - m / m
Reinforcement Calculation
S M CONSULTANTS,BHUBANESWAR
BALLAST WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 616
Secondary Reinforcement
Minimum secondary reinforcement % of b d = 0.12
= ( 0.12 / 100 ) x 423 x 1000
= 507.6
Provi T- 10 @ 100 mm c/c as Transverse R/F
Therefore, Ast_trans = ( π / 4 )10^2 x 1000 / 100 = 785 mm2 / m
Therefore, Ast_trans = 785 mm / m
2
> 508 mm2 / m
OK
Reinforcement on outer face
Provi T- 10 @ 140 mm c/c Vertically
Therefore, Ast_trans = ( π / 4 )10^2 x 1000 / 140 = 561 mm2 / m
561 mm / m
2
> 508 mm / m
2
OK
OK
S M CONSULTANTS,BHUBANESWAR
INTRODUCTION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
INTRODUCTION
BRIDGE NO 614
No. of spans 7
Chainage 465241
PIER No P1
Discharge 267.739 Cumecs
Velocity 2 m/sec (assumed)
High Flood Level (HFL) 267.739
No of Tracks 1
Soil Particulars
Type of Soil at founding Level Rock
DESIGN PARAMETERS
Grade of Concrete M 35
Grade of Steel Fe 500
Unit weight of Concrete (T/m3) 2.5
Seismic Zone II
Exposure Condition Moderate
Basic Wind Speed 47 m/s
PIER DETAILS
Proposed Rail Level 271.755
Proposed Rail Formation Level 271.015
Ground Level 265.170
B/O footing Level 263.170
High Flood Level (HFL) 267.739
Low Water Level (LWL) 265.170
SPAN DETAILS
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
1.0 INTRODUCTION
The system consists of a solid rectangular pier with semicircular cutwater nose and solid pier cap. The top dimensions of the pier
cap are fixed so as to fit in the details of PSC slab superstructure. The Pier Shaft is designed as a wall fixed to the raft base slab
wherein the longitudinal dimension of Base Slab is considered half of the clear span of raft on each side for load calculation pupose.
2.0 REFERENCES
For the design of the piers and its different components generally the provisions of IRS (Indian Railway Standards) Codes have been
followed. Followings are the main references.
i. IRS Bridge Rules
ii. IRS Concrete Bridge Code
iii. IRS Substructure and Foundation code
5.0 SKETCHES
5.7
1.100
6.005
265.170
264.070
0.00 0.0 0.90
0.90 263.170 0.90
7.85 5.620
ACROSS TRACK ALONG TRACK
Transverse ELEVATION Longitudinal
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
A1 P1 P2
Span 1 Span 2
6 LOAD CALCULATION
Total Reaction due to SIDL from both spans = 18.714 + 18.714 = 37.429 T
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
1.100
0.45
5.7
PLAN OF PIER CAP ELEVATION OF CAP
ACROSS TRACK
Area of Pier Cap = 1.1 x 5.7
= 6.270 m2
CG of Top Portion of Pier Cap w.r.t. top of Pier Cap = 0.45 / 2.0
= 0.225 m
Volume of Pier Cap 6.27 x 5.7 = 2.822 m3
Span 1 Span 2
Longitudinal Eccentricity of Reaction, e L = 0.244 0.244
Total Moment (Longitudinal) due to DL from both spans = 3.527 x0.244 - 3.527 x 0.244
= 0.000 Tm
Span 1 Span 2
Eccentricity in Transverse direction = 0 0
Total Moment (Transverse) due to DL from both spans
= 3.527 x0 - 3.527 x 0 = 0.000 Tm
5.7
(Note : Please refer Cl: 5.10 of IRS Code of Practice for Bridge Substructure and Foundation for self Weight of Pier)
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
7.850
PLAN OF footing
Traffic Direction
0.000 m
0.900 m
2.36 0.90 2.36
5.620
(Note : Please refer Cl: 5.10 of IRS Code of Practice for Bridge Substructure and Foundation for self Weight of footing)
Weight of footing at LWL (Without Buyoncy)
= 39.705 x 2.50 = 99.263 T
Weight of footing at HFL (100% Buyoncy)
= 39.705 x (2.50 - 1.0) = 59.558 T
Computation of CDA
(Note:Please refer clause 2.4.1.1 (a) and 2.4.2.1 (a) of IRS:Bridge Rule)
CDA = (2 - d/0.9) x 0.5 x (0.15 + [ 8 / (6 + L)]) Subject to Maximum of 1.0
Depth of fill= 0.35 m Therefore , CDA = 0.679
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
Computation of CDA
(Note:Please refer clause 2.4.1.1 (a) and 2.4.2.1 (a) of IRS:Bridge Rule)
CDA = (2 - d/0.9) x 0.5 x (0.15 + [ 8 / (6 + L)]) Subject to Maximum of 1.0
Depth of fill= 0.35 m Therefore , CDA = 0.496
Towards A1 LL Reaction
Reaction on Pier = 198.02 x 5.62 / (11.165 ) = 99.675 T
Eccentricity of reaction, eL1 = 0.244 m
Towards P2 LL Reaction
Reaction on Pier = 198.02 x 5.62 / (11.165 ) = 99.675 T
Eccentricity of reaction, eL2 = 0.244 m
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
Distributing the maximum Force among the two spans in proportion to their length as under:
Towards A1 LL Reaction
= 50.396 x 5.62 / 11.165 = 25.367 T
Towards P2 LL Reaction
= 50.396 x 5.62 / 11.165 = 25.367 T
6.3.1 Single Span Loaded Condition (SSLC); Longer Span Loaded in Case of unequal Spans
Coefficient of Friction = 0.6
Total frictional force 0.6 x (16.648 + 18.714) = 21.217 T
Towards P2 LL Reaction
Coefficient of Friction = 0.6
Total frictional force = 0.6 x (16.648 + 18.714) = 21.217 T
Net frictional l Force = 21.22 - 21.22 = 0.000 T
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
[Refer Cl: 2.12.5.2 of IRS Bridge Rules, Slab, box and pipe culverts need
not be designed for seismic forces.]
Hence seismic Forces are not considered in design.
[Refer Cl 5.11 of substructure and foundation code, Wind pressure shall be taken into account for bridges of span 18m
and over.]
Hence wind Forces are not considered in design.
[Refer Cl: 2.8.2.4.3 (f) of IRS Bridge Rules, Ballasted deck bridges without bearings (Slab, box and arches) need
not be checked for forces due to continuation of LWR.]
Hence LWR Forces are not considered in design.
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
8 COMBINATION OF LOADS
Loads are to be considered in following combinations:
CASE 1(a) NORMAL (HFL) (DL+SIDL+LL-SSLC) (Ref Combination I as per IRS Concrete Bridge Code)
CASE 1(b) NORMAL (HFL) (DL+SIDL+LL-DSLC) (Ref Combination I as per IRS Concrete Bridge Code)
CASE 1(c ) NORMAL (LWL) (DL+SIDL+LL-SSLC) (Ref Combination I as per IRS Concrete Bridge Code)
CASE 1(d) NORMAL (LWL) (DL+SIDL+LL-DSLC) (Ref Combination I as per IRS Concrete Bridge Code)
CASE 2 (a) NORMAL+ FRICTION (HFL) (DL+SIDL+LL:SSLC+ FL) (Ref Combination IV as per IRS Concrete Bridge Code)
CASE 2 (b) NORMAL+ FRICTION (HFL) (DL+SIDL+LL:DSLC+ FL) (Ref Combination IV as per IRS Concrete Bridge Code)
CASE 2 (c) NORMAL+ FRICTION (LWL) (DL+SIDL+LL:SSLC+ FL) (Ref Combination IV as per IRS Concrete Bridge Code)
CASE 2 (d) NORMAL+ FRICTION (LWL) (DL+SIDL+LL:DSLC+ FL) (Ref Combination IV as per IRS Concrete Bridge Code)
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
13.1.1 Case - I a ( Single Span Loaded Condition; Normal Load Case with Buoyancy)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 56.22 ) + 1.20 * (37.429 ) + 1.10 * ( 83.891 )
= 233.765 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.20 * ( 0 ) + 1.10 * ( 20.449 + 203.332 + 2.603 ) = 249.022 T - m
13.1.2 Case - I b (Double Span Loaded Condition; Normal Load Case with Buoyancy)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 56.22 ) + 1.20 * (37.429 ) + 1.10 * ( 99.01 )
= 250.396 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.20 * ( 0 ) + 1.10 * ( 0 + 327.49 + 2.603 ) = 363.102 T - m
13.1.3 Case - I c ( Single Span Loaded Condition; Normal Load Case without Buoyancy)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 74.405 ) + 1.20 * (37.429 ) + 1.10 * ( 83.891 )
= 251.949 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.20 * ( 0 ) + 1.10 * ( 20.449 + 203.332 + 2.603 ) = 249.022 T - m
13.1.4 Case - I d (Double Span Loaded Condition; Normal Load Case without Buoyancy)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 74.405 ) + 1.20 * (37.429 ) + 1.10 * ( 99.01 )
= 268.580 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.20 * ( 0 ) + 1.10 * ( 0 + 327.49 + 2.603 ) = 363.102 T - m
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
13.1.5 Case - II a ( Single Span Loaded Condition; Normal Load Case with Buoyancy+FRICTION)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 56.22 ) + 1.20 * (37.429 )
= 141.485 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.20 * ( 0 ) + 1.0 * ( 136.958 )
= 136.958 T - m
Transverse Moment (MT) =
1* 0 + 1.2 * 0 = 0.000 T - m
13.1.6 Case - II b (Double Span Loaded Condition; Normal Load Case with Buoyancy + FRICTION)
13.1.7 Case - II c ( Single Span Loaded Condition; Normal Load Case without Buoyancy+FRICTION)
13.1.8 Case - II d (Double Span Loaded Condition; Normal Load Case without Buoyancy + FRICTION)
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
13.2.1 Case - I a ( Single Span Loaded Condition; Normal Load Case with Buoyancy)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 56.22 ) + 2 * (37.429 ) + 1.75 * ( 83.891 )
= 342.380 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2 * ( 0 ) + 1.75 * ( 20.449 + 203.332 + 2.603 ) = 396.172 T - m
13.2.2 Case - I b (Double Span Loaded Condition; Normal Load Case with Buoyancy)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 56.22 ) + 2.0 * (37.429 ) + 1.75 * ( 99.01 )
= 368.838 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.75 * ( 0 + 327.49 + 2.603 ) = 577.663 T - m
13.2.3 Case - I c ( Single Span Loaded Condition; Normal Load Case without Buoyancy)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 74.405 ) + 2.0 * (37.429 ) + 1.75 * ( 83.891 )
= 365.110 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.75 * ( 20.449 + 203.332 + 2.603 ) = 396.172 T - m
13.2.4 Case - I d (Double Span Loaded Condition; Normal Load Case without Buoyancy)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 74.405 ) + 2.0 * (37.429 ) + 1.75 * ( 99.01 )
= 391.568 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.75 * ( 0 + 327.49 + 2.603 ) = 577.663 T - m
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
13.2.5 Case - II a ( Single Span Loaded Condition; Normal Load Case with Buoyancy+FRICTION)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 56.22 ) + 2.0 * (37.429 )
= 195.570 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.5 * ( 136.958 )
= 205.438 T - m
Transverse Moment (MT) =
1.25* 0 + 2.0 * 0 = 0.000 T - m
13.2.6 Case - II b (Double Span Loaded Condition; Normal Load Case with Buoyancy + FRICTION)
13.2.7 Case - II c ( Single Span Loaded Condition; Normal Load Case without Buoyancy+FRICTION)
13.2.8 Case - II d (Double Span Loaded Condition; Normal Load Case without Buoyancy + FRICTION)
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
14.1.2 Case - I b (Double Span Loaded Condition; Normal Load Case with Buoyancy)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 7.054 + 56.22 + 59.558 ) + 1.2 * (118.943 ) + 1.1 * ( 99.675 )
= 408.503 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.2 * ( 0 ) + 1.1* ( 0 + 327.49 + 2.603 )
= 363.102 T - m
Transverse Moment (MT) =
1.1 * ( 9.901 + 0.91 ) + 1* 0 + 1.2 * 0 = 11.893 T - m
Horizontal Load in Longitudinal Direction (HL) =
1.1 * (50.734 + 0.925 ) = 56.826 T
Horizontal Load in Transverse Direction (HT) =
1.1 * (0.324 ) = 0.356 T
14.1.3 Case - I c ( Single Span Loaded Condition; Normal Load Case without Buoyancy)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 74.405 + 99.263 ) + 1.2 * (118.943 ) + 1.1 * ( 83.891 )
= 449.030 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.2 * ( 0 ) + 1.1* ( 20.449 + 203.332 + 2.603 ) = 249.022 T - m
14.1.4 Case - I d (Double Span Loaded Condition; Normal Load Case without Buoyancy)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 7.054 + 74.405 + 99.263 ) + + 1.2 * (118.943 ) + 1.1 * ( 99.675 )
= 466.392 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.2 * ( 0 ) + 1.1* ( 0 + 327.49 + 2.603 )
= 363.102 T - m
Transverse Moment (MT) =
1.1 * ( 9.901 + 0.91 ) + 1* 0 + 1.2 * 0 = 11.893 T - m
Horizontal Load in Longitudinal Direction (HL) =
1.1 * (50.734 + 0.925 ) = 56.826 T
Horizontal Load in Transverse Direction (HT) =
1.1 * (0.324 ) = 0.356 T
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
14.1.5 Case - II a ( Single Span Loaded Condition; Normal Load Case with Buoyancy+FRICTION)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 56.22 + 59.558 ) + 1.2 * (118.943 )
= 298.860 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.2 * ( 0 ) + 1.0* ( 136.958 )
= 136.958 T - m
Transverse Moment (MT) =
1* 0 + 1.2 * 0 = 0.000 T - m
14.1.6 Case - II b (Double Span Loaded Condition; Normal Load Case with Buoyancy + FRICTION)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 56.22 + 59.558 ) + 1.2 * (118.943 )
= 298.860 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.2 * ( 0 ) + 1 * ( 0 ) = 0.000 T - m
14.1.7 Case - II c ( Single Span Loaded Condition; Normal Load Case without Buoyancy+FRICTION)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 74.405 + 99.263 ) + 1.2 * (118.943 )
= 356.749 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.2 * ( 0 ) + 1.0* ( 136.958 )
= 136.958 T - m
Transverse Moment (MT) =
1* 0 + 1.2 * 0 = 0.000 T - m
14.1.8 Case - II d (Double Span Loaded Condition; Normal Load Case without Buoyancy + FRICTION)
Vertical Load (V) =
1.0 * ( 33.296 + 7.054 + 74.405 + 99.263 ) + 1.2 * (118.943 )
= 356.749 T
Longitudinal Moment (ML) =
1.0 * ( 0 ) + 1.2 * ( 0 ) + 1 * ( 0 ) = 0.000 T - m
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
14.2.1 Case - I a ( Single Span Loaded Condition; Normal Load Case with Buoyancy)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 56.22 + 59.558 )+ 2.0 * (118.943 ) + 1.75 * ( 83.891 )
= 579.856 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.75* ( 20.449 + 203.332 + 2.603 ) = 396.172 T - m
14.2.2 Case - I b (Double Span Loaded Condition; Normal Load Case with Buoyancy)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 7.054 + 56.22 + 59.558 )+ 2.0 * (118.943 )+ 1.75 * ( 99.675 )
= 607.478 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.75* ( 0 + 327.49 + 2.603 )
= 577.663 T - m
Transverse Moment (MT) =
1.75 * ( 9.901 + 0.91 ) + 1.25* 0 + 2.0 * 0 = 18.920 T - m
Horizontal Load in Longitudinal Direction (HL) =
1.75 * (50.734 + 0.925 ) = 90.405 T
Horizontal Load in Transverse Direction (HT) =
1.75 * (0.324 ) = 0.566 T
14.2.3 Case - I c ( Single Span Loaded Condition; Normal Load Case without Buoyancy)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 74.405 + 99.263 )+ 2.0 * (118.943 ) + 1.75 * ( 83.891 )
= 652.218 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.75* ( 20.449 + 203.332 + 2.603 ) = 396.172 T - m
14.2.4 Case - I d (Double Span Loaded Condition; Normal Load Case without Buoyancy)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 7.054 + 74.405 + 99.263 )+ 2.0 * (118.943 ) + 1.75 * ( 99.675 )
= 679.840 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.75* ( 0 + 327.49 + 2.603 )
= 577.663 T - m
Transverse Moment (MT) =
1.75 * ( 9.901 + 0.91 ) + 1.25* 0 + 2.0 * 0 = 18.920 T - m
Horizontal Load in Longitudinal Direction (HL) =
1.75 * (50.734 + 0.925 ) = 90.405 T
Horizontal Load in Transverse Direction (HT) =
1.75 * (0.324 ) = 0.566 T
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
14.2.5 Case - II a ( Single Span Loaded Condition; Normal Load Case with Buoyancy+FRICTION)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 56.22 + 59.558 )+ 2.0 * (118.943 )
= 433.046 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.5* ( 136.958 )
= 205.438 T - m
Transverse Moment (MT) =
1.25* 0 + 2.0 * 0 = 0.000 T - m
14.2.6 Case - II b (Double Span Loaded Condition; Normal Load Case with Buoyancy + FRICTION)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 56.22 + 59.558 ) + 2.0 * (118.943 )
= 433.046 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.5 * ( 0 ) = 0.000 T - m
14.2.7 Case - II c ( Single Span Loaded Condition; Normal Load Case without Buoyancy+FRICTION)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 74.405 + 99.263 ) + 2.0 * (118.943 )
= 505.408 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.25* ( 136.958 )
= 205.438 T - m
Transverse Moment (MT) =
1.25* 0 + 2.0 * 0 = 0.000 T - m
14.2.8 Case - II d (Double Span Loaded Condition; Normal Load Case without Buoyancy + FRICTION)
Vertical Load (V) =
1.25 * ( 33.296 + 7.054 + 74.405 + 99.263 ) + 2.0 * (118.943 )
= 505.408 T
Longitudinal Moment (ML) =
1.25 * ( 0 ) + 2.0 * ( 0 ) + 1.5 * ( 0 ) = 0.000 T - m
S M CONSULTANTS,BHUBANESWAR
PIER MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO. 614
0.9
5.700
Philosophy
The cap is provided with nominal reinforcement of 0.2% steel distributed equally at top and bottom and provided in two directions both at top
and bottom. The reinforcement along the shorter side is in the form of hoops, extending for full width of the cap. The reinforcement along the
length of the cap should extend from end to end of the cap.
DIMENSIONS:
PIER CAP
Top Length of Pier Cap (Transverse Direction) L1 = 5.7 m
Bottom Length of Pier Cap (Transverse Direction) L2 = 5.7 m
Top Breadth of Pier Cap (Longitudinal Direction) B1 = 0.9 m
Bottom Breadth of Pier Cap (Longitudinal Direction) B2 = 0.9 m
Depth of Pier Cap at edge D1 = 0.45 m
Total Depth of Pier Cap D = 0.45 m
Remaining Depth of Pier Cap D2 = 0m
effective depth of pier cap d = 388 mm
Reinforcements
0.900
0 0 0.9
5.7
0.45
5.7 5.7 0.45
0
0.9
0
0.900
1) Transverse Direction
Length of cap in transverse direction = 5.7 m
Length of cap in longitudinal direction = 0.9 m
Clear cover = 0.05 m
Diameter of bar at top & bottom = 10 mm
Spacing of bars at top & bottom = 200 mm
Number of bars at top or bottom = 4
No of Side reinforcement 2nos on each side = 4.0
Area of reinforcement at top = 0.0018 m3
Similarly Area of reinforcement at bottom = 0.0018 m3
Side face reinforcement = 0.0018 m3
S M CONSULTANTS,BHUBANESWAR
PIER CAP MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
2) Longitudinal Direction
`
Length of hoop = 2.30 m
Diameter of bar of hoop = 12 mm
Spacing of hoop across the cap = 280 mm
No of hoop bars required = 20.000
Area of reinforcement = 0.005 m3
3) Stirrups
S M CONSULTANTS,BHUBANESWAR
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
1 Design Data
Bearing Capacity of soil = 31 T/m2
Combined Footing 1
No of abutments: = 1
No of piers : = 1
Dimensions of the footing
Total Base width = 8.923 m
Length = 7.850 m
Depth = 0.9 m
Pier
SLS Case - I Case - II ULS Case - I Case - II
V (t) 466.39 356.75 V (t) 679.84 505.41
ML (t) 363.10 136.96 ML (t) 577.66 205.44
MT (t) 11.89 0.00 MT (t) 18.92 0.00
HL (t) 56.83 21.22 HL (t) 90.40 31.83
HT (t) 0.36 0.00 HT (t) 0.57 0.00
Calculating Moments and shear per meter width INNER SPAN OUTER SPAN
Max Midspan Moment = 63.78 Tm/m 0.00 Tm/m
Max Support Moment = 147.02 Tm/m 8.37 Tm/m
Max Shear = 43.46 T/m 5.95 T/m
S M CONSULTANTS,BHUBANESWAR
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
5 Design Constants
Grade of Concrete = M 35
Grade of steel = Fe 500
Clear Cover = 50 mm
R fy
fck 415 500
30 4.14 3.99
35 4.83 4.65
R = 4.65 N/mm2
= 474.006116208 T/m2
6 BM Reinforcement Calculation
S M CONSULTANTS,BHUBANESWAR
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
1 Design Data
Bearing Capacity of soil = 31 T/m2
Combined Footing 2
No of abutments: = 0
No of piers : = 2
Dimensions of the footing
Total Base width = 11.192 m
Length = 7.850 m
Depth = 0.9 m
Pier
SLS Case - I Case - II ULS Case - I Case - II
V (t) 466.39 356.75 V (t) 679.84 505.41
ML (t) 363.10 136.96 ML (t) 577.66 205.44
MT (t) 11.89 0.00 MT (t) 18.92 0.00
HL (t) 56.83 21.22 HL (t) 90.40 31.83
HT (t) 0.36 0.00 HT (t) 0.57 0.00
Calculating Moments and shear per meter width INNER SPAN OUTER SPAN
Max Midspan Moment = 64.57 Tm/m 0.00 Tm/m
Max Support Moment = 79.73 Tm/m 7.57 Tm/m
Max Shear = 31.11 T/m 5.40 T/m
S M CONSULTANTS,BHUBANESWAR
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
5 Design Constants
Grade of Concrete = M 35
Grade of steel = Fe 500
Clear Cover = 50 mm
R fy
fck 415 500
30 4.14 3.99
35 4.83 4.65
R = 4.65 N/mm2
= 474.006116208 T/m2
6 BM Reinforcement Calculation
S M CONSULTANTS,BHUBANESWAR
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
DATA
Return Wall Height = 5.845 m (from GAD)
Loading Standard = 25 Tonne 2008
Unit Weight of Concrete = 24 kN/m3 (IS 875:1987 Part 1)
Unit Weight of Soil = 20 kN/m3 (IS 875:1987 Part 1)
Grade of concrete = M 20
Maximum permissible compressive stress = 0.38 x fck (Cl . 14.10 Concrete Bridge Code )
= 7.6 N/mm2
Maximum permissible Tensile = 0.034 x fck x 0.8 (Cl . 14.10 Concrete Bridge Code )
stress in bending = 0.544 N/mm2
SBC required at founding level = 19.853 T/m2 (From calculation)
SBC available at founding level = 20.000 T/m2 (Assumed as per soil report)
Outer side batter above GL = 1 in 8 (from figure)
Outer side batter below GL = 1 in 1 (from figure)
Earth side batter = 1 in 6 (from figure)
Wall angle a = TAN ( 1 / 6 )
-1
(from figure)
9.46 o
Angle of Repose f = 35.00 o (Table 1. Substructure & Foundation
Code)
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
D2 5.845 m
D3 1.00 m A B3 = 2.05 B9 =0.73 A
D4 0.30 m 14
15
6
x
19
D3 = 1
D5 0.30 m B B10 = 0.974 B4 = 3.221
20
B
y
D6 0.30 m 7 B5=3.821 D4 = 0.3
D7 0.60 m 8 B6 = 4.121 21 D5 = 0.3
C
D8 0.00 m 9 B7 = 4.421 D6 = 0.3 C
D9 0.00 m 2 z
cos2 ( φ + α)
Kp = = 5.680
cos2 α cos (α - δ) 1- sin ( φ + δ) sin(φ + i) 2
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
1 Checking At Section AA
Distance
of C/L Area x
Coeff B D Area from heel Distance
Sec 3 1.00 0.35 5.85 2.05 1.15 2.35
Sec 4 0.50 0.97 5.85 2.85 0.65 1.85
Sec 5 0.50 0.73 5.85 2.14 1.57 3.35
7.03 7.55
center line of section from heel = 7.55 / 7.03 = 1.074 m
center line of section from toe = 2.055 - 1.074 = 0.98 m
Moment about
Moment about
C/L of section
section C/L
Depth (D)
Width (B)
Section
Weight
Coeff.
toe(x)
toe
3 1 0.350 5.845 24.00 49.098 0.906 44.464 -0.075 -3.696
4 0.5 0.974 5.845 24.00 68.328 1.405 96.025 0.424 29.002
5 0.5 0.731 5.845 24.00 51.246 0.487 24.961 -0.494 -25.306
Sectionwise Loads and corresponding moments for earthfill
11 0.5 0.808 5.845 20.00 47.198 1.730 81.656 0.749 35.360
16 0.5 0.808 0.000 20.00 0.000 1.730 0.000 0.749 0.000
Total V 215.870 M 247.107 M 35.360
1.3 Calculation for Surcharge Pressure (Cl 5.8 of SubStructure and Foundation Code )
Total Barrel Length of Box = 7.85 + 2 x 2 x 0 = 7.850 m
Inner to inner Distnace between face = 7.85 - 2 x ( 0.35 + 5.845 / 6) = 5.202 m
of return walls
Distnace from edge of sleeper to face = (5.202 - 2.75) / 2 = 1.226 m
of return wall
Depth of section AA from top h = 5.845 m
Depth from top where 45˚ dispersion
line meets return wall D = 1.226 m < 5.8
Hence
surcharge pressure acts on return wall
0.350
B
D
h 5.845 45°
h1
2.055
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
1.4 Calculation for Active Earth Pressure (Cl 5.7.1 of SubStructure and Foundation Code )
Ka g H
Pressure 0.320 x 20.00 x 5.845 = 37.450 kN / m2
(Considering H = wall height only )
Pressure due to sloping surcharge (Cl 5.8.4 of Substructure and Foundation Code)
P2 = Ka ϒ h h3 = 0 kN / m2
h = 5.845 + 0 = 5.85 m
h3 = 1/3 cotФ tanα h = 0 m
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
at Section AA
Plan area of return wall = 2.055 x 1 = 2.055 m2
Sectional Modulus = 1 x 2.055 x 2.055 / 6 = 0.704 m3
2 Checking At Section BB
Distance
of C/L Area x
Coeff B D Area from heel Distance
Sec 3 1.00 0.35 5.85 2.05 1.32 2.692
Sec 4 0.50 0.97 5.85 2.85 0.82 2.323
Sec 5 0.50 0.73 5.85 2.14 1.73 3.703
Sec 6-1 1.00 2.05 1.00 2.05 1.19 2.454
Sec 6-2 0.50 0.17 1.00 0.08 0.11 0.009
Sec 6-3 0.50 0.13 1.00 0.06 2.55 0.160
7.028 8.719
center line of section from heel = 8.72 / 7.03 = 1.241 m
center line of section from toe = 3.221 - 1.241 = 1.98 m
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
Unit Wt(kN/m3)
Moment about
Moment about
C/L of section
from section
from toe(y)
Lever Arm
Lever Arm
Depth (D)
Width (B)
Section
Weight
Coeff.
C/L
toe
3 1 0.350 5.845 24.00 49.098 2.206 108.292 0.225 11.034
4 0.5 0.974 5.845 24.00 68.328 2.705 184.851 0.724 49.500
5 0.5 0.731 5.845 24.00 51.246 1.787 91.581 -0.194 -9.932
6.1 1 2.055 1.000 24.00 49.315 2.327 114.776 0.346 17.088
6.2 0.5 0.167 1.000 24.00 2.000 3.188 6.376 1.207 2.414
6.3 0.5 0.125 1.000 24.00 1.500 0.967 1.450 -1.014 -1.521
Sectionwise Loads and corresponding moments for earthfill
11 0.5 0.808 5.845 20.00 47.198 3.030 143.014 1.049 49.519
12 1 0.167 5.845 20.00 19.483 3.438 66.986 1.457 28.392
15 0.5 0.167 1.000 20.00 1.667 3.466 5.777 1.485 2.475
16+17 0.5 1.141 0.000 20.00 0.000 3.141 0.000 1.160 0.000
19.1 1 0.300 1.000 20.00 6.000 0.150 0.900 -1.831 -10.985
19.2 0.5 1.000 1.000 20.00 10.000 0.967 9.667 -1.014 -10.142
Total V 295.835 M 724.003 M 137.983
2.3 Calculation for Surcharge Pressure (Cl 5.8 of SubStructure and Foundation Code )
Total Barrel Length of Box = 7.85 + 2 x 2 x 0 = 7.850 m
Inner to inner Distnace between face = 7.85 - 2 x ( 0.35 + 6.845 / 6) = 4.868 m
of return walls
Distnace from edge of sleeper to face = (4.868 - 2.75) / 2 = 1.059 m
of return wall
Depth of section AA from top h = 6.845 m
Depth from top where 45˚ dispersion
line meets return wall D = 1.059 m < 6.8
Hence
surcharge pressure acts on return wall
0.350
B
D
h 6.845 45°
h1
3.221
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
2.4 Calculation for Active Earth Pressure (Cl 5.7.1 of SubStructure and Foundation Code )
Ka g H
Pressure 0.320 x 20.00 x 6.845 = 43.857 kN / m2
(Considering H = wall height only )
Pressure due to sloping surcharge (Cl 5.8.4 of Substructure and Foundation Code)
P2 = Ka ϒ h h3 = 0 kN / m2
h = 5.845 + 0 = 5.85 m
h3 = 1/3 cotФ tanα h = 0 m
=
Angle of Inclination of Pressure with horizontal (δ + α ) 21.129 ˚ (Cl 5.7.1.2 of
SubStructure and
= 0.36877 radians Foundation Code )
at Section BB
Plan area of return wall = 3.221 x 1 = 3.221 m2
Sectional Modulus = 1 x 3.221 x 3.221 / 6 = 1.730 m3
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
3 Checking At Section CC
Distance
3.1 Calculation of centroid of footing
of C/L Area x
B D Area from heel Distance
Sec 7 3.82 0.30 1.15 1.91 2.19
Sec 8 4.12 0.30 1.24 2.06 2.55
Sec 9 4.42 0.30 1.33 2.21 2.93
3.71 7.67
center line of footing from heel = 7.67 / 3.71 = 2.068 m
center line of footing from toe = 4.421 - 2.068 = 2.35 m
Moment about
Moment about
C/L of footing
footing C/L
Depth (D)
Width (B)
Section
Weight
Coeff.
toe(z)
toe
1
2 1 0.600 0.600 24.00 8.640 1.491 12.881 -0.863 -7.45301
3 1 0.350 5.845 24.00 49.098 2.972 145.934 0.619 30.38388
4 0.5 0.974 5.845 24.00 68.328 4.121 281.611 1.768 120.8045
5 0.5 0.731 5.845 24.00 51.246 2.554 130.870 0.200 10.26457
6 1 2.638 1.000 24.00 63.315 6.526 413.172 4.172 264.163
7 1 3.82 0.300 24.00 27.515 2.511 69.081 0.157 4.327452
8 1 4.121 0.300 24.00 29.675 2.361 70.053 0.007 0.216
9 1 4.421 0.300 24.00 31.835 2.211 70.377 -0.143 -4.543452
10
Sectionwise Loads and corresponding moments for earthfill
11 0.5 0.808 5.845 20.00 47.198 3.69 173.956 1.332 62.87649
12 1 0.167 5.845 20.00 19.483 4.04 78.676 1.685 32.82308
13 1 0.300 5.845 20.00 35.070 4.271 149.800 1.918 67.26455
14 1 0.300 1.000 20.00 6.000 4.271 25.629 1.918 11.50805
15 0.5 0.167 1.000 20.00 1.667 4.066 6.777 1.712 2.854088
16 0.5 0.81 0.00 20.00 3.63007 1.277 0
19.1 1 0.300 1.000 20.00 6.000 0.750 4.500 -1.603 -9.620701
19.2 0.5 1.000 1.000 20.00 10.000 1.233 12.333 -1.120 -11.20117
20 1 0.600 1.300 20.00 15.600 0.300 4.680 -2.053 -32.03382
21 1 0.300 0.300 20.00 1.800 0.150 0.270 -2.203 -3.96621
Total V 472.469 M 1650.60 M 546.120
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
3.3 Calculation for Surcharge Pressure (Cl 5.8 of SubStructure and Foundation Code )
Total Barrel Length of Box = 7.85 + 2 x 2 x 0 = 7.850 m
Inner to inner Distnace between face = 7.85 - 2 x ( 0.35 + 7.745 / 6) = 4.568 m
of return walls
Distnace from edge of sleeper to face = (4.568 - 2.75) / 2 = 0.784 m
of return wall
Depth of section AA from top h = 7.745 m
Depth from top where 45˚ dispersion
line meets return wall D = 0.784 m < 7.7
Hence
surcharge pressure acts on return wall
0.350
B
D
h 7.745 45°
h1
4.421
3.2 Calculation for Active Earth Pressure (Cl 5.7.1 of SubStructure and Foundation Code )
Ka g H
Pressure 0.320 x 20.00 x 7.745 = 49.624 kN / m2
(Considering H = wall height only )
Pressure due to sloping surcharge (Cl 5.8.4 of Substructure and Foundation Code)
P2 = Ka ϒ h h3 = 0 kN / m2
h = 5.845 + 0 = 5.85 m
h3 = 1/3 cotФ tanα h = 0 m
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
=
Angle of Inclination of Pressure with horizontal (δ ) 11.667 ˚ (Cl 5.7.1.2 of
SubStructure and
= 0.20362 radians Foundation Code )
3.3 Calculation for Passive Earth Pressure (Cl 5.7.1.6 of SubStructure and Foundation Code )
Kp g H
Pressure 5.680 x 20.00 x 0.833 = 94.670 kN / m2
(Considering H = 1/3rd of front earthfill height only )
= (Cl 5.7.1.6 of
Angle of Inclination of Pressure with horizontal (δ ) 11.667 ˚ SubStructure and
= 0.20362 radians Foundation Code )
Horizontal Component = 94.67 x cos (11.67) = 92.71 kN / m2
Vertical Component = 94.67 x sin (11.67) = 19.14 kN / m2
= 2.12 > 2
S M Consultants, Bhubaneswar
RAFT FOUNDATION MARWAR JN - RANI BG PATCH DOUBLING PROJECT BRIDGE NO - 614
at Section CC
Plan area of return wall = 4.421 x 1 = 4.421 m2
Sectional Modulus = 1 x 4.421 x 4.421 / 6 = 3.258 m3
Pmax = (P / B) x ( 1 + (6 e / B))
194.75 kN / m2 = 19.853 T/m2 ok
Pmin = (P / B) x ( 1 - (6 e / B))
36.54 kN/ m2 = 3.725 T/m2 ok
S M Consultants, Bhubaneswar
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
DESIGN OF RCC SPLAYED WING WALL
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
0 m Fill height
8.080
7.080 5.080
GL
1
3 0.5
0.5 1 1
A 2 1 2
Founding Level
0.5
0.5
1.00 2.000 1 2
5.00
TYPICAL PLAN
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
3 LOAD CALCULATION
(EARTH LEVEL)
7.080
8.080
4.368
1.000 (TOP OF Footing)
4.985
(BOTTOM OF Footing)
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
h = 8.080
h3 = 1/3 cotΦ × tanα × h
cotΦ = 1.732
tanα = 0.447
h3 = 0.000
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
Hence
surcharge pressure acts on splayed wing wall
0.350
0.000
B
D
h 7.080 45°
h1
3.925
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
h = = 8.080
h1 = = 5.880 m
D = = 2.550 m
P1 = = 44.922 kN/m
cos2 ( φ + α)
Kp =
cos2 α cos (α - δ) 1- sin ( φ + δ) sin(φ + i) 2 = 4.143
cos (α - δ) cos (α-i)
Depth of key = 0.5 m
Depth of foundation = 1m
Total Depth on which passive pressure acts = 1.5 m
Total Force on Key only 0.5 x 4.14 x 2 x 1.5^2 = 9.322 T
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
4.2 Stability against Sliding
5.1 Stem
LA from Moment (T-
Forces Force (T) ULS Factor Base (m) m)
AEP - Backfill (Horizontal Component) 15.227 1.70 2.36 61.09
AEP - Sloping Surcharge (Horizontal Component) 0.000 1.70 3.54 0.00
AEP - Train + Track Surcharge 3.800 1.70 2.44 15.76
19.028 76.856
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
2 1 2.0
5.00
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION A - A
5.3 Shear Key
Factored
Sliding Force Force (T) ULS Factor Force (T)
AEP - Backfill (Horizontal Component) 19.833 1.70 33.716
AEP - Sloping Surcharge (Horizontal Component) 0.000 1.70 0.000
AEP - Train + Track Surcharge 4.579 1.70 7.785
41.500
Resisting Force
from friction µW 27.474 1.25 34.342
6.0 REINFORCEMENTS
Grade of concrete = 35 M
Grade of steel = 500 Fe
Grade of steel for stirrup/ shear links = 415 Fe
Exposure Condition = Moderate
Clear Cover = 50 mm
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
DESIGN OF RCC SPLAYED WING WALL
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
0 m Fill height
Top of Abut Level
0.3
i= 12.79
7.542
6.500 5.400
GL
0.728
1.75 0
0.5
0.5
TYPICAL ELEVATION
4.508
TYPICAL PLAN
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
3 LOAD CALCULATION
(EARTH LEVEL)
6.500
7.150
3.261
0.650 (TOP OF Footing)
3.784
(BOTTOM OF Footing)
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
h = 7.542
h3 = 1/3 cotΦ × tanα × h
cotΦ = 1.428
tanα = 0.227
h3 = 0.815
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
Hence
surcharge pressure acts on splayed wing wall
0.350
0.475
B
D
h 6.500 45°
h1
4.874
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
h = = 7.150
h1 = = 4.476 m
D = = 3.499 m
P1 = = 22.527 kN/m
cos2 ( φ + α)
Kp =
cos2 α cos (α - δ) 1- sin ( φ + δ) sin(φ + i) 2 = 5.680
cos (α - δ) cos (α-i)
Depth of key = 0.5 m
Depth of foundation = 0.65 m
Total Depth on which passive pressure acts = 1.15 m
Total Force on Key only 0.5 x 5.68 x 2 x 1.15^2 = 7.512 T
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
4.2 Stability against Sliding
5.1 Stem
LA from Moment (T-
Forces Force (T) ULS Factor Base (m) m)
AEP - Backfill (Horizontal Component) 10.379 1.70 2.17 38.23
AEP - Sloping Surcharge (Horizontal Component) 2.243 1.70 3.25 12.39
AEP - Train + Track Surcharge 1.963 1.70 1.91275 6.38
14.585 57.007
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
Net Force due to upward Pressure 0.5 x 2.054 x (17.594 + 16.231 ) = 34.74 T
Line of Action of force from face 2.054/ 3 ( 2 x 17.59 + 16.23 ) / (17.59 + 16.23 ) = 1.041 m
Moment about face 34.738 x 1.041 = 36.155 Tm
Net Force due to upward Pressure 0.5 x 1.726 x (15.748 + 14.603 ) = 26.19 T
Line of Action of force from face 1.726/ 3 ( 2 x 14.6 + 15.75 ) / (15.75 + 14.6 ) = 0.852 m
Moment about face 26.194 x 0.852 = 22.321 Tm
S M CONSULTANTS,BHUBANESWAR
RCC SPLAYED WING WALL MARWAR JN - RANI BG PATCH DOUBLING PROJECT SECTION B - B
5.3 Shear Key
Factored
Sliding Force Force (T) ULS Factor Force (T)
AEP - Backfill (Horizontal Component) 13.973 1.70 23.754
AEP - Sloping Surcharge (Horizontal Component) 3.020 1.70 5.134
AEP - Train + Track Surcharge 2.296 1.70 3.904
32.792
Resisting Force
from friction µW 21.463 1.25 26.829
6.0 REINFORCEMENTS
Grade of concrete = 30 M
Grade of steel = 500 Fe
Grade of steel for stirrup/ shear links = 415 Fe
Exposure Condition = Moderate
Clear Cover = 50 mm
S M CONSULTANTS,BHUBANESWAR
DESIGN OF RCC RETURN WALL WITHOUT WEEP HOLE
0 m Fill height
Top of Abut Level
0.2
i= 26.57
1.500
1.200 1.000
GL
0.3
0.5 0
A Founding Level
0 0.3 1
TYPICAL ELEVATION
1.30
TYPICAL PLAN
3 LOAD CALCULATION
(EARTH LEVEL)
1.200
1.500
1.501
0.300 (TOP OF Footing)
0.565
i) Pressure at Base of Stem
(Note :-The height h for action of pressure is considered as stem height only)
Earth Pressure at Return Wall Base Ka γ h
= 0.251 x 1 x 1.2 = 0.301 T / m2
h = 1.500
h3 = 1/3 cotΦ × tanα × h
cotΦ = 1.428
tanα = 0.500
h3 = 0.357
Earth Pressure due to sloping surcharge Ka ϒ h h3 = 0.000 T
Hence
surcharge pressure does not act on Return wall, thus surcharge pressure need not be calculated
0.350
0.000
B
D
h 1.200 45°
h1
2.6
cos2 ( φ + α)
Kp =
cos2 α cos (α - δ) 1- sin ( φ + δ) sin(φ + i) 2 = 5.680
cos (α - δ) cos (α-i)
Depth of key = 0m
Depth of foundation = 2m
Total Depth on which passive pressure acts = 2m
Total Force on Key only 0.5 x 5.68 x 1 x 2^2 = 11.360 T
5.1 Stem
LA from Moment (T-
Forces Force (T) ULS Factor Base (m) m)
AEP - Backfill (Horizontal Component) 0.882 1.7 0.40 0.60
AEP - Sloping Surcharge (Horizontal Component) 0.000 1.7 0.6 0.00
AEP - Train + Track Surcharge 0.000 1.7 -0.5 0.00
0.882 0.600
0 0.3 1.0
1.30
Factored
Sliding Force Force (T) ULS Factor Force (T)
AEP - Backfill (Horizontal Component) 1.517 1.70 2.578
AEP - Sloping Surcharge (Horizontal Component) 0.000 1.70 0.000
AEP - Train + Track Surcharge 0.000 1.70 0.000
2.578
Resisting Force
from friction µW 2.219 1.25 2.774
6.0 REINFORCEMENTS
Grade of concrete = 35 M
Grade of steel = 500 Fe
Grade of steel for stirrup/ shear links = 415 Fe
Exposure Condition = Moderate
Clear Cover = 50 mm