Dear Sir,
Thank you for inviting us to quote for the job. Our quote is based on the information
provided to us.
We are pleased to quote as per enclosed BOQ. Our quoted unit rates are EXCLUDING ALL APPLICABLE
TAXES.
Our Lump sum quote is subjected to following terms and conditions.
iii. Provide the necessary dry and solid platform, wherever necessary, for the operators to stand and operate
the equipment and continuous dewatering, if required.
ix. Removal and shifting the excavated soil/Loose material in the site as per the requirements.
x. Accommodation for our working labors and supervisors up to completion of site work.
BILL OF QUANTITIES:-
Approx
Unit Rate Amount
S.NO DESRIPTION Quantity
If our machinery and personnel are stand by due to non-availability of work front or any
other reason, stand by charges of Rs. 20,000 per day to be paid to us. Payment shall be based on
actual quantity installed at site.
PAYMENT TERMS :-
a. 40% of the contract sum as mobilization advance to be paid along with confirmation.
b. Payment for the work done shall be made within TWO (2) days from the date of claim.
c. The unit rate quoted does not include any state or central taxes applicable.
This quotation is valid for the above project and for 10 days from the date of this
quote. Mobilization of the equipment, manpower and machinery will be done within 3
days from your confirmed order and receipt of advance amount.
You need any clarifications, please contact the undersigned on mobile 9000800622. We
hope the above is in order and look forward to be of service to you.
Thanking You,
Yours Truly
EE Engineering Construction Services
An ISO 9001:2000 Certified Company