VISUAL INSPECTION REPORT PAGE: 1

EQUIPMENT: V6-0714 PMT NO: REPORT NO.:


PLANT: GPP6
DESCRIPTION: Butane Day Tank (Sphere) PMT 108045 VEX/GPP-6/TA/14/174
GENERAL VIEW: EQUIPMENT TAGGING, PMT NUMBER & SERIAL NUMBER PLATE DISPLAY
AT SITE:

DEFECT TEAM
Name plate:V6-0714 Correct PMT No.: (Received by)
S/N: - PMT 108045
Name: ______________________

Notification by NDT ‐ refer attached NDT/DT reports (Fill‐up by Doc. Controller) Date   : ______________________

Date NDT/DT FINDINGS RECOMMENDATIONS For Repair Completed

Activities Performed (Fill‐up by Doc. Controller)
All Repairs are 
 NDT Done :  MPI / DPI / UTFlaw / UTTG / RT / ECT / RFET / MFL / IRIS / CUI / Videoscope completed
(By Defect Mgr)
 Others       :  Ext Paint / Int Paint / HT / Pneumatic / AE / PR

DOSH INSPECTION (Fill‐up by DOSH Escorter) Name: ______________________

FINDINGS / RECOMMENDATIONS / REMARKS by DOSH OFFICER: Date   : ______________________

Equipment Ready 
for BOX‐UP
(By Doc. Controller)

__________________________ Name: ______________________
EQUIPMENT ORIENTATION: Vertical
(Escorter Initial & Date) Date   : ______________________

Inspected By: Amri b. Muhammad Inspection Date: 09 Feb 2014


Inspection Agency: Testex (M) Sdn. Bhd. Reviewed By: Ir. M. Zubir b. Mat Dahan
VISUAL INSPECTION REPORT PAGE: 2

EQUIPMENT: V6-0714 PMT NO: REPORT NO.:


PLANT: GPP6
DESCRIPTION: Butane Day Tank (Sphere) PMT 108045 VEX/GPP-6/TA/14/174
FINDINGS:

A. The equipment were found fully paint. Painting was noted still intact and in
satisfactory condition.
A B. Mostly of the foundation and fire proofing concrete was found with hair line
crack as per previous report.

C. The earthing lugs were found still intact and in satisfactory condition.

For Repair
RECOMMENDATION: defect Completed
Repair (Put date)

A. Nil. -

B C B. To be monitored. -

C. Nil. -

Inspected By: Amri b. Muhammad Inspection Date: 09 Feb 2014


Inspection Agency: Testex (M) Sdn. Bhd. Reviewed By: Ir. M. Zubir b. Mat Dahan
VISUAL INSPECTION REPORT PAGE: 3

EQUIPMENT: V6-0714 PMT NO: REPORT NO.:


PLANT: GPP6
DESCRIPTION: Butane Day Tank (Sphere) PMT 108045 VEX/GPP-6/TA/14/174
FINDINGS:

A & B. The serial number was noted not been punch on the name plate.
A

For Repair
RECOMMENDATION: defect Completed
Repair (Put date)

B Y
A & B. To punch the serial No.

Inspected By: Amri b. Muhammad Inspection Date: 09 Feb 2014


Inspection Agency: Testex (M) Sdn. Bhd. Reviewed By: Ir. M. Zubir b. Mat Dahan
VISUAL INSPECTION REPORT PAGE: 4

EQUIPMENT: V6-0714 PMT NO: REPORT NO.:


PLANT: GPP6
DESCRIPTION: Butane Day Tank (Sphere) PMT 108045 VEX/GPP-6/TA/14/174
FINDINGS:

A. Associated parts of attachment was found still intact and in satisfactory


A condition. No evidence of leakage observed.

B to D. Paintwork deteriorated (peel-off) with presence surface corrosion were


found at entire of fasteners (M1, M2, N1, N2, N3, N4, CN1,CN2, CN3, CN4,
CN6, CN7 & CN8) and crevice corrosion in between the contact point of
flanges nozzle.

For Repair
C RECOMMENDATION: defect
Repair
Completed
(Put date)

B -
A . Nil.

B to D. To touch-up paint as per PTS 30.48.00.31P Y


coating system 1C.

D
Inspected By: Amri b. Muhammad Inspection Date: 09 Feb 2014
Inspection Agency: Testex (M) Sdn. Bhd. Reviewed By: Ir. M. Zubir b. Mat Dahan
VISUAL INSPECTION REPORT PAGE: 5

EQUIPMENT: V6-0714 PMT NO: REPORT NO.:


PLANT: GPP6
DESCRIPTION: Butane Day Tank (Sphere) PMT 108045 VEX/GPP-6/TA/14/174

EXTERNAL INSPECTION SUMMARY: INSULATED? N


EXTERNAL LOCATION  CATEGORIES (APPLICABLE FOR INSULATED EQUIPMENT ONLY)

BARRIER PENETRATIONS 0 VESSEL SUPPORTS 0

DAMAGED INSULATION 0 INSULATION RINGS 0

INSPECTION COMMENTS
ID & DESCRIPTION CONDITION LOCATION NCR COMMENTS
V14 ‐ Shell Good All sections No No abnormality
V33 ‐ Nozzles Good Nozzles No No abnormality
V37 ‐ Bolting Poor Manhole & all Nozzle No Paint deteriorated
V38 ‐ Flanges Poor All sections No Crevice corrosion
V7 ‐ Platform Good All sections No No abnormality
V22 ‐ Foundation Fair All sections No Hair line crack
V26 ‐ Fireproofing Fair All sections No Hair line crack
V11 ‐ Coating/Painting Good Shell body  No No abnormality

INSPECTION SUMMARY

Generally the external equipment were found in satisfactory condition. Except mostly of foundation and fire proofing concrete was found with hair line crack as per previous
report. serial number was noted not been punch on the name plate. Paintwork deteriorated (peel-off) with presence surface corrosion were found at entire of fasteners(M1,
M2, N1, N2, N3, N4, CN1,CN2, CN3, CN4, CN6, CN7 & CN8) and crevice corrosion in between the contact point of flanges nozzle.

Inspected By: Amri b. Muhammad Inspection Date: 09 Feb 2014


Inspection Agency: Testex (M) Sdn. Bhd. Reviewed By: Ir. M. Zubir b. Mat Dahan
VISUAL INSPECTION REPORT PAGE: 6

EQUIPMENT: V6-0714 PMT NO: REPORT NO.:


PLANT: GPP6
DESCRIPTION: Butane Day Tank (Sphere) PMT 108045 VEX/GPP-6/TA/14/174

INTERNAL INSPECTION SUMMARY:

INSPECTION COMMENTS
ID & DESCRIPTION CONDITION LOCATION NCR COMMENTS
V21 ‐ Internals Other (Please explain) No
V1 ‐ General Other (Please Explain) No

INSPECTION SUMMARY

Inspected By: Amri b. Muhammad Inspection Date: 09 Feb 2014


Inspection Agency: Testex (M) Sdn. Bhd. Reviewed By: Ir. M. Zubir b. Mat Dahan